{"id":117118,"date":"2026-01-09T18:29:06","date_gmt":"2026-01-09T18:29:06","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/117118\/"},"modified":"2026-01-09T18:29:06","modified_gmt":"2026-01-09T18:29:06","slug":"road-work-and-closures-for-certain-lubbock-roads-set-for-monday-jan-12-2","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/117118\/","title":{"rendered":"Road work and closures for certain Lubbock roads set for Monday, Jan. 12"},"content":{"rendered":"<p class=\"text | article-text\">LUBBOCK, Texas (KCBD) &#8211; The City of Lubbock says, starting Monday, January 12, 2026, workers will begin construction of a new sanitary sewer main on East 8th Street, from Oak Avenue to Martin Luther King Boulevard. <\/p>\n<p class=\"text | article-text\">Detours will be marked to help drivers navigate around the construction zone. Drivers are urged to use alternate routes, if possible.<\/p>\n<p class=\"text | article-text\">The work is scheduled to be completed on February 9, 2026, weather permitting.<\/p>\n<p class=\"text | article-text\">The city also says on Monday, workers will close the northbound curb lane on Quaker Avenue approaching 24th Street, and a portion of the south side of 24th Street east of Quaker Avenue, for utility work.<\/p>\n<p class=\"text | article-text\">That work is scheduled to be completed by January 18, weather permitting.<\/p>\n<p class=\"text | article-text\">The City urges motorists to use an alternate route if possible, eliminate distractions, and plan for extra travel time when driving through the area.<\/p>\n<p class=\"copyright |\">Copyright 2026 KCBD. All rights reserved.<\/p>\n","protected":false},"excerpt":{"rendered":"LUBBOCK, Texas (KCBD) &#8211; The City of Lubbock says, starting Monday, January 12, 2026, workers will begin construction&hellip;\n","protected":false},"author":2,"featured_media":117090,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16],"tags":[314,30129,51461,992,51459,21715,168,170,169,51462,50009,51460,51463,3174,14216,18235],"class_list":["post-117118","post","type-post","status-publish","format-standard","has-post-thumbnail","category-lubbock","tag-314","tag-24th","tag-avenue","tag-city","tag-east-8th-street","tag-jan","tag-lubbock","tag-lubbock-headlines","tag-lubbock-news","tag-mlk","tag-monday","tag-oak","tag-quaker","tag-road","tag-street","tag-work"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/117118","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=117118"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/117118\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/117090"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=117118"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=117118"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=117118"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}