{"id":118544,"date":"2026-01-11T00:08:09","date_gmt":"2026-01-11T00:08:09","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/118544\/"},"modified":"2026-01-11T00:08:09","modified_gmt":"2026-01-11T00:08:09","slug":"learn-about-6-road-updates-for-san-marcos-buda-and-kyle","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/118544\/","title":{"rendered":"Learn about 6 road updates for San Marcos, Buda and Kyle"},"content":{"rendered":"<p>\t\t\t\t\t\t\tEditor&#8217;s note: This list is not comprehensive. Have a tip? Send an email to <a href=\"http:\/\/communityimpact.com\/cdn-cgi\/l\/email-protection#fd8e9f9693988a8ebd9e929090889394898494908d9c9e89d39e9290\" rel=\"nofollow noopener\" target=\"_blank\">[email\u00a0protected]<\/a>.<\/p>\n<p>Hays County drivers can track progress on six <a cmp-ltrk=\"Article Links\" cmp-ltrk-idx=\"0\" data-mrf-link=\"https:\/\/communityimpact.com\/transportation\/austin\/san-marcos-buda-kyle\/\" href=\"https:\/\/communityimpact.com\/austin\/san-marcos-buda-kyle\/government\/2025\/12\/23\/road-projects-new-facilities-read-5-top-hays-county-bond-stories-of-2025\/\" mrfobservableid=\"5a1f1329-3b80-45a3-ba66-e8e16079175e\" rel=\"nofollow noopener\" target=\"_blank\">transportation projects<\/a>\u2014ranging from new deceleration lanes and neighborhood street upgrades to multimillion-dollar widening and extension work.<\/p>\n<p>Upcoming projects<\/p>\n<p>RM 967 deceleration lanes<\/p>\n<p>Project: deceleration lanes added in two locations:<\/p>\n<p>Garlic Creek Drive at Remuda TrailGarlic Creek Drive at Grove LaneUpdate: in final construction plansTimeline: 2021-TBDCost: $2.57 millionFunding source: 2021 Buda bondAustin Street reconstruction<\/p>\n<p>Project: parking, sidewalks and stormwater improvements FM 2770 to San Antonio Street<\/p>\n<p>Update: at 60% design phase<\/p>\n<p>Timeline: 2021-TBDCost: $8.6 millionFunding source: 2021 Buda bondBishop and Belvin Street improvements<\/p>\n<p>Project: full-depth road reconstruction with drainage, water, wastewater, retaining walls and sidewalk improvements from Belvin Street to West San Antonio Street<\/p>\n<p>Update: at 90% design phase; acquisition process underway<\/p>\n<p>Timeline: 2026-28Cost: $11.26 millionFunding source: Capital Improvement Program; city utility and general fundsOngoing projects<\/p>\n<p>Kyle Parkway-Lehman Road extension<\/p>\n<p>Project: Lehman Road extended into a four-lane roadway from Bunton Creek Road to Dacy Lane; Kyle Parkway to connect with the new segment<\/p>\n<p>Update: at 95% design phase<\/p>\n<p>Timeline: 2023-27Cost: $42.5 millionFunding source: 2022 Kyle bondOld Bastrop Road widening<\/p>\n<p>Project: from Rattler Road to Centerpoint Road<\/p>\n<p>Update: water main installed in September; waterline crossing underway<\/p>\n<p>Timeline: 2025-26Cost: TBDFunding source: 2025 road project certificates of obligationOld Stagecoach Road widening and Center Street improvements<\/p>\n<p>Project: Old Stagecoach Road widened to a four-lane roadway from Veterans Drive to Main Street. Work completed in four parts:<\/p>\n<p>north portion of Old Stagecoach Road from Veterans Drive to Six Creeks BoulevardOld Stagecoach Road from Six Creeks Boulevard to Center StreetCenter Street from Old Stagecoach Road to Veterans Drivethree lanes from Veterans Drive to Main StreetUpdate: in final design phaseTimeline: 2023-27Cost: $41.2 millionFunding source: 2022 Kyle bond<\/p>\n<p>&#8220;&gt;<\/p>\n","protected":false},"excerpt":{"rendered":"Editor&#8217;s note: This list is not comprehensive. Have a tip? Send an email to [email\u00a0protected]. Hays County drivers&hellip;\n","protected":false},"author":2,"featured_media":118545,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[132,134,133,51896,51898,51897,51899,51890,51894,51901,51900,51887,51888,8959,51891,8962,51889,51892,51893,51895],"class_list":["post-118544","post","type-post","status-publish","format-standard","has-post-thumbnail","category-austin","tag-austin","tag-austin-headlines","tag-austin-news","tag-austin-street-reconstruction-buda","tag-belvin-street-improvements-buda","tag-bishop-street-improvements-buda","tag-buda-bond-road-projects","tag-buda-road-projects","tag-center-street-improvements","tag-central-texas-road-projects","tag-hays-county-infrastructure","tag-hays-county-road-construction","tag-hays-county-traffic-updates","tag-hays-county-transportation-projects","tag-kyle-parkway-lehman-road-extension","tag-kyle-road-bond-projects","tag-kyle-transportation-projects","tag-old-bastrop-road-widening","tag-old-stagecoach-road-widening","tag-rm-967-deceleration-lanes"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/118544","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=118544"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/118544\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/118545"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=118544"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=118544"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=118544"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}