{"id":120401,"date":"2026-01-12T21:28:27","date_gmt":"2026-01-12T21:28:27","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/120401\/"},"modified":"2026-01-12T21:28:27","modified_gmt":"2026-01-12T21:28:27","slug":"updates-on-8-current-and-future-transportation-projects-in-georgetown","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/120401\/","title":{"rendered":"Updates on 8 current and future transportation projects in Georgetown"},"content":{"rendered":"<p>\t\t\t\t\t\t\tThere are several upcoming and ongoing <a href=\"https:\/\/www.georgetowntexas.gov\/transportation\/transportation_projects\/cleargov_cip_map.php\" rel=\"nofollow noopener\" target=\"_blank\">road projects<\/a> in Georgetown, including plans to build medians on Williams Drive, and to construct <a href=\"https:\/\/communityimpact.com\/austin\/georgetown\/transportation\/2025\/12\/11\/georgetown-advances-new-austin-avenue-pedestrian-bridge-design\/\" rel=\"nofollow noopener\" target=\"_blank\">two pedestrian and bicycle bridges<\/a> crossing the San Gabriel River.<\/p>\n<p>Read about these projects and more below. This list is not comprehensive.<\/p>\n<p>Upcoming projects<\/p>\n<p>Williams Drive<\/p>\n<p>Project: Construct medians with turn lanes on Williams Drive from I-35 to Serenada Drive, including a shared-use path on the north side of Williams Drive, a new waterline, and street lighting from DB Wood Road to Jim Hogg Road to and Serenada Drive to I-35<\/p>\n<p>Update: In the design phase, with the first phase of the project\u2014street lighting from DB Wood to Jim Hogg\u2014anticipated to begin in the spring<\/p>\n<p>Timeline: 2023-27Cost: $18.6 millionFunding sources: city of Georgetown, traffic impact fees, federal grants, tax increment financingSE Inner Loop<\/p>\n<p>Project:<\/p>\n<p> Widen 2.91 miles of SE Inner Loop to a four-lane, divided road from Hwy. 29 to FM 1460, and add a shared-use path for pedestrians and bicycles on one side<\/p>\n<p>Update: In the design phase, with real estate acquisition and utility relocation ongoing<\/p>\n<p>Timeline: 2022-28Cost: $70.6 millionFunding sources: city of Georgetown, Georgetown Transportation Enhancement CorporationHwy. 29 West<\/p>\n<p>Project: Construct additional travel lanes, lengthen turn lanes and improve traffic signals on Hwy. 29 from Wolf Ranch Parkway to I-35 as well as add shared-use paths<\/p>\n<p>Update: Construction is expected to begin in the spring<\/p>\n<p>Timeline: 2023-27Cost: $10.1 millionFunding source: Georgetown Transportation Enhancement CorporationAustin Avenue pedestrian bridges<\/p>\n<p>Project: <\/p>\n<p>Construct two pedestrian and bicycle bridges crossing the San Gabriel River, adjacent to the existing Austin Avenue bridges<\/p>\n<p>Update: A <a href=\"https:\/\/communityimpact.com\/austin\/georgetown\/transportation\/2025\/12\/11\/georgetown-advances-new-austin-avenue-pedestrian-bridge-design\" rel=\"nofollow noopener\" target=\"_blank\">redesign for the project<\/a> was approved at a Dec. 9 council work session due to cost increases associated with the original design<\/p>\n<p>Timeline: 2023-TBDCost: $21 millionFunding sources: city of Georgetown, developer feesShell Road<\/p>\n<p>Project: Widen Shell Road from Williams Drive to Sycamore Street to four lanes with a raised median, shared-use path, and left- and right-turn lanes<\/p>\n<p>Update: Utility relocations are ongoing and construction is expected to begin in mid-2026<\/p>\n<p>Timeline: 2022-27Cost: $21.17 millionFunding source: city of GeorgetownOngoing projects<\/p>\n<p>Southwestern Boulevard<\/p>\n<p>Project: Reconstruct and expand Southwestern Boulevard to two lanes with a center turn lane and other improvements from University Park to SE Inner loop<\/p>\n<p>Update: Substantial completion expected by the end of February<\/p>\n<p>Timeline: 2020-26Cost: $6.58 millionFunding source: city of Georgetown, Williamson CountyRockride Lane<\/p>\n<p>Project: Upgrade Rockride Lane to a two-lane collector roadway with a continuous center left-turn lane and a 10-foot-wide shared-use path along one side from SE Inner Loop to Sam Houston Avenue<\/p>\n<p>Update: The first phase of the project, from SE Inner Loop to Mitchell Elementary and Wagner Middle schools, was substantially completed last fall. Construction continues with estimated completion by September<\/p>\n<p>Timeline: 2022-26Cost: $12 millionFunding source: city of GeorgetownDB Wood Road Phase 1<\/p>\n<p>Project: <\/p>\n<p>Add four 12-foot wide lanes, a center turn lane and a shared-use path from Hwy. 29 to Oak Ridge Road<\/p>\n<p>Update: All four lanes are set to be open to traffic by March 31, with project completion in July<\/p>\n<p>Timeline: 2023-26Cost: $29.6 millionFunding source: city of Georgetown<\/p>\n<p>&#8220;&gt;<\/p>\n","protected":false},"excerpt":{"rendered":"There are several upcoming and ongoing road projects in Georgetown, including plans to build medians on Williams Drive,&hellip;\n","protected":false},"author":2,"featured_media":120402,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[132,134,133,1494,8118,12268,52444,14701,50721,840],"class_list":{"0":"post-120401","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-austin","8":"tag-austin","9":"tag-austin-headlines","10":"tag-austin-news","11":"tag-construction","12":"tag-design","13":"tag-georgetown","14":"tag-pedestrian-bridges","15":"tag-road-projects","16":"tag-san-gabriel-river","17":"tag-transportation"},"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/120401","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=120401"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/120401\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/120402"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=120401"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=120401"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=120401"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}