{"id":131722,"date":"2026-01-21T10:01:18","date_gmt":"2026-01-21T10:01:18","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/131722\/"},"modified":"2026-01-21T10:01:18","modified_gmt":"2026-01-21T10:01:18","slug":"check-out-5-austin-area-permits-filed-this-week-att-conference-center-kelly-lane","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/131722\/","title":{"rendered":"Check out 5 Austin-area permits filed this week: AT&#038;T Conference Center, Kelly Lane"},"content":{"rendered":"<p>\t\t\t\t\t\t\tAn electric vehicle sales center and a new residential building are among the newest projects filed with the <a href=\"https:\/\/www.tdlr.texas.gov\/\" rel=\"nofollow noopener\" target=\"_blank\">Texas Department of Licensing and Regulation<\/a>. Here are five of the most expensive projects filed with the TDLR in the Austin metro this week.<\/p>\n<p><a href=\"https:\/\/www.tdlr.texas.gov\/TABS\/Search\/Project\/TABS2026010082\" rel=\"nofollow noopener\" target=\"_blank\">1. Gunter Street residential building<\/a><\/p>\n<p>A five-story, multifamily building with a five-story parking garage is planned near the East Seventh Street H-E-B.<\/p>\n<p>Location: 1135 Gunter St., AustinEstimated timeline: May 1, 2026-Aug. 1, 2028Estimated cost: $80 million<a href=\"https:\/\/www.tdlr.texas.gov\/TABS\/Search\/Project\/TABS2026010165\" rel=\"nofollow noopener\" target=\"_blank\">2. Kelly Lane Phase 3<\/a><\/p>\n<p>The city of Pflugerville will reconstruct curbs and gutters, four roundabouts and 10-inch sidewalks on each side of the road. <a href=\"https:\/\/communityimpact.com\/austin\/pflugerville-hutto\/transportation\/2025\/08\/14\/pflugerville-nears-kelly-lane-phase-2-completion\/\" rel=\"nofollow noopener\" target=\"_blank\">Phase 2<\/a> of the projected completed in late 2025.<\/p>\n<p>Location: Kelly Lane, from Moorlynch Avenue to Weiss Lane, PflugervilleEstimated timeline: Oct. 1, 2026-March 31, 2030Estimated cost: $40 million<a href=\"https:\/\/www.tdlr.texas.gov\/TABS\/Search\/Project\/TABS2026009969\" rel=\"nofollow noopener\" target=\"_blank\">3. AT&amp;T Executive Education and Conference Center<\/a><\/p>\n<p>A redesign of <a href=\"https:\/\/meetattexas.com\/hotel\/rooms?gad_source=1&amp;gad_campaignid=20989120705&amp;gbraid=0AAAAAqv_fqEeFl7pKAjN_7GS_PagurGJR&amp;gclid=CjwKCAiA7LzLBhAgEiwAjMWzCOfIhrG4FwgqyZOBX7_it0rBD4N_NjOG4aO2TEhY24ss8aDVT8QMuBoC7VoQAvD_BwE\" rel=\"nofollow noopener\" target=\"_blank\">The University of Texas hotel<\/a> interior will repurpose an existing lecture hall into a 198,000-square-foot conference hall.<\/p>\n<p>Location: 1900 University Ave., AustinEstimated timeline: Dec. 1, 2025-Aug. 31, 2026Estimated cost: $19 million<a href=\"https:\/\/www.tdlr.texas.gov\/TABS\/Search\/Project\/TABS2026009872\" rel=\"nofollow noopener\" target=\"_blank\">4. Rivian Electric Vehicle Service and Sales Center<\/a><\/p>\n<p><a href=\"https:\/\/rivian.com\/\" rel=\"nofollow noopener\" target=\"_blank\">Rivian<\/a>, an electric vehicle company with locations across the United States and Canada, plans to expand into the Round Rock area with a 48,000-square-foot facility to service and sell electric vehicles. The company already operates two other Austin-area locations at South Congress Avenue and Morrow Street.<\/p>\n<p>Location: 140 Crossroads Drive, Round RockEstimated timeline: March 9, 2026-March 3, 2027Estimated cost: $9.5 million<a href=\"https:\/\/www.tdlr.texas.gov\/TABS\/Search\/Project\/TABS2026010414\" rel=\"nofollow noopener\" target=\"_blank\">5. The Worship Place, Above &amp; Beyond Way Campus<\/a><\/p>\n<p>Construction is planned for an 18,500-square-foot campus of <a href=\"https:\/\/www.twptx.org\/\" rel=\"nofollow noopener\" target=\"_blank\">The Worship Place<\/a> in Georgetown and will include heating, ventilation and air-conditioning, plus electrical and plumbing work.<\/p>\n<p>Location: 2020 Above &amp; Beyond Way, GeorgetownEstimated timeline: March 30, 2026-Aug. 27, 2027Estimated cost: $5.8 million<\/p>\n<p>&#8220;&gt;<\/p>\n","protected":false},"excerpt":{"rendered":"An electric vehicle sales center and a new residential building are among the newest projects filed with the&hellip;\n","protected":false},"author":2,"featured_media":131723,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[132,134,133,110,56462,2351,15888,4100],"class_list":["post-131722","post","type-post","status-publish","format-standard","has-post-thumbnail","category-austin","tag-austin","tag-austin-headlines","tag-austin-news","tag-development","tag-kelly-lane","tag-renovations","tag-tdlr","tag-university-of-texas"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/131722","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=131722"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/131722\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/131723"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=131722"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=131722"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=131722"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}