{"id":134172,"date":"2026-01-22T22:38:09","date_gmt":"2026-01-22T22:38:09","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/134172\/"},"modified":"2026-01-22T22:38:09","modified_gmt":"2026-01-22T22:38:09","slug":"cibolo-plans-for-future-growth-with-approval-of-wastewater-master-plan","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/134172\/","title":{"rendered":"Cibolo plans for future growth with approval of wastewater master plan"},"content":{"rendered":"<p>\t\t\t\t\t\t\tCibolo City Council approved a resolution adopting its South Cibolo Wastewater Master Plan on <a href=\"https:\/\/www.cibolotx.gov\/government\/agendas___minutes.php\" rel=\"nofollow noopener\" target=\"_blank\">Jan. 13<\/a>.<\/p>\n<p>The gist<\/p>\n<p>The city contracted engineering firm <a href=\"https:\/\/www.freese.com\/\" rel=\"nofollow noopener\" target=\"_blank\">Freese and Nichols Inc.<\/a> in 2025 to prepare the plan, which recommends short- and long-term infrastructure projects needed to meet projected wastewater flows as the city continues to be built out.<\/p>\n<p>The master plan will serve as a roadmap to guide infrastructure construction between FM 78 and I-10, which is a new sewer service area for Cibolo, said Tyler May, a water and wastewater engineer with Freese and Nichols Inc., in an email to Community Impact.<\/p>\n<p>The South Cibolo Wastewater Master Plan provides the city with a prioritized list of projects sized to meet build-out growth in the area. The projects extend infrastructure to areas that do not have wastewater service yet, the email states.<\/p>\n<p>Capital Improvement Projects recommended by the plan will be incorporated into the city\u2019s CIP Plan for future fiscal years, according to agenda documents.<\/p>\n<p>The plan provides an estimate of the timing and location of growth from 2030 to 2050 and at full build-out. Growth was assumed to occur near the Venado Crossing Lift Station and the South <a href=\"https:\/\/www.ccmatx.org\/\" rel=\"nofollow noopener\" target=\"_blank\">Cibolo Creek Municipal Authority<\/a> <a href=\"https:\/\/communityimpact.com\/san-antonio\/northeast-san-antonio-metrocom\/government\/2025\/11\/26\/cibolo-to-contribute-383m-for-design-of-regional-wastewater-treatment-plant-expansion\/\" rel=\"nofollow noopener\" target=\"_blank\">Wastewater Treatment Plant<\/a>.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/01\/1769121489_248_thumbnail.jpeg\" width=\"100%\" alt=\"chart visualization\"\/><\/p>\n<p>\u201cThese areas are closest to existing infrastructure, so it is easiest to build there. Development patterns may change over time, which will change the order of projects constructed,\u201d May said in the email.<\/p>\n<p>Short-term projects, like the construction of a new lift station at Bolton Road and wastewater mainlines at Northwest Venado, will help establish critical infrastructure that the rest of the basins will depend on to convey flows to existing treatment facilities.<\/p>\n<p>Medium- and long-term projects, like a 15-inch Lower Seguin Road South Wastewater extension and a Bolton Road Lift Station expansion, extend from the short-term projects into areas projected to grow in later planning periods, according to May&#8217;s email.<\/p>\n<p>Quote of note<\/p>\n<p>City Manager Wayne Reed said the adoption is a \u201cmilestone\u201d in Cibolo\u2019s journey of delivering on the promise of being a wastewater service provider.<\/p>\n<p>\u201cThe adoption of this master plan allows us to proceed with designing a capital improvement project that will include the transmission line from the CCMA South Plan to the Bolton Road, Aeckerville Road intersection area,\u201d Reed said.<\/p>\n","protected":false},"excerpt":{"rendered":"Cibolo City Council approved a resolution adopting its South Cibolo Wastewater Master Plan on Jan. 13. The gist&hellip;\n","protected":false},"author":2,"featured_media":134173,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[57394,363,57391,57393,57396,2507,82,84,83,57392,57395],"class_list":["post-134172","post","type-post","status-publish","format-standard","has-post-thumbnail","category-san-antonio","tag-ccma","tag-cibolo","tag-cibolo-city-council","tag-cibolo-creek-municipal-authority","tag-future-growth","tag-guadalupe-county","tag-san-antonio","tag-san-antonio-headlines","tag-san-antonio-news","tag-south-cibolo-creek-municipal-authority-wastewater-treatment-plant","tag-wastewater-treatment-plant"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/134172","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=134172"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/134172\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/134173"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=134172"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=134172"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=134172"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}