{"id":157615,"date":"2026-02-10T00:25:09","date_gmt":"2026-02-10T00:25:09","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/157615\/"},"modified":"2026-02-10T00:25:09","modified_gmt":"2026-02-10T00:25:09","slug":"city-requests-915k-more-for-yorktown-boulevard-widening-project","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/157615\/","title":{"rendered":"City requests $915K more for Yorktown Boulevard widening project"},"content":{"rendered":"<p>CORPUS CHRISTI, Texas \u2014 The city is asking council to approve a <a class=\"Link\" href=\"https:\/\/corpuschristi.legistar.com\/LegislationDetail.aspx?ID=7866063&amp;GUID=EF22017F-7B01-4745-ACB3-95252EB94D4A&amp;Options=&amp;Search=\" target=\"_blank\" rel=\"nofollow noopener\">change order<\/a> for the Yorktown Boulevard project that would cost about $915,000 more.<\/p>\n<p>City engineers say the extra money is needed so the road can properly connect to the Mud Bridge, make updates to the Fred&#8217;s Folly intersection and quantity corrections and field adjustments.<\/p>\n<p>City seeks $915,000 more for Yorktown Boulevard project.<\/p>\n<p>&#8220;The two main drivers of that change order are to make modifications to the design to connect with the TxDOT design for the bridge replacement,&#8221; Jeff Edmonds, Director of Engineering Services, said.<\/p>\n<p>Edmonds explains why the city has to redesign the approach that will lead to a new Mud Bridge coming soon.<\/p>\n<p>&#8220;We didn&#8217;t know exactly how wide it was going to be. So based on the additional width and the additional elevation that TxDOT has provided, we&#8217;ve had to amend our drawings which required additional work for the contractor,&#8221; Edmonds said.<\/p>\n<p>            <img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/02\/1770683109_51_.png\" alt=\"Proposed bridge.png\"  width=\"1280\" height=\"720\"\/><\/p>\n<p>KRIS6 News<\/p>\n<p>Edmonds says timing was the reason for the design mismatch.<\/p>\n<p>&#8220;For good reason, TxDOT&#8217;s design doesn&#8217;t exactly hone up with our design that predated theirs. So to make it work, we have to modify our design,&#8221; Edmonds said.<\/p>\n<p>About $250,000 of the change order is for updates at the Fred&#8217;s Folly intersection.<\/p>\n<p>&#8220;Another part of that is to make some changes to the Fred Folly intersection, to accommodate the northward path,&#8221; Edmonds said.<\/p>\n<p>The money for the change order would come from Street Bond 2022, storm water, and water funds. Edmonds says the change order would add a month to the project with an estimated completion date of September 2027.<\/p>\n<p>&#8220;And the contractor is a little bit ahead of schedule. So there&#8217;s a good chance he may beat that,&#8221; Edmonds said.<\/p>\n<p>As for the Mud Bridge, TxDOT officials plan on awarding a bid in April and construction should start in the summer.<\/p>\n<p>&#8220;This story was reported on-air by a journalist and has been converted to this platform with the assistance of AI. Our editorial team verifies all reporting on all platforms for fairness and accuracy.&#8221;<\/p>\n<p>For the latest local news updates, <a class=\"Link\" href=\"https:\/\/www.kristv.com\/news\/local-news\" target=\"_blank\" rel=\"nofollow noopener\">click here<\/a>, or download the <a class=\"Link\" href=\"https:\/\/www.kristv.com\/about-us\/kris-6-apps\" target=\"_blank\" rel=\"nofollow noopener\">KRIS 6 News App. <\/a><\/p>\n<p>Catch all the <a class=\"Link\" href=\"https:\/\/www.youtube.com\/user\/KRIS6News\/videos\" target=\"_blank\" rel=\"nofollow noopener\">KRIS 6 News stories and more on our YouTube page<\/a>. Subscribe today!<\/p>\n","protected":false},"excerpt":{"rendered":"CORPUS CHRISTI, Texas \u2014 The city is asking council to approve a change order for the Yorktown Boulevard&hellip;\n","protected":false},"author":2,"featured_media":157616,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[64903,64904,155,157,156,64902],"class_list":{"0":"post-157615","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-corpus-christi","8":"tag-change-order","9":"tag-construction-change-order","10":"tag-corpus-christi","11":"tag-corpus-christi-headlines","12":"tag-corpus-christi-news","13":"tag-yorktown-widening-project"},"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/157615","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=157615"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/157615\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/157616"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=157615"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=157615"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=157615"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}