{"id":180982,"date":"2026-02-26T09:17:10","date_gmt":"2026-02-26T09:17:10","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/180982\/"},"modified":"2026-02-26T09:17:10","modified_gmt":"2026-02-26T09:17:10","slug":"kyle-shares-major-updates-on-2022-road-bond-projects","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/180982\/","title":{"rendered":"Kyle shares major updates on 2022 road bond projects"},"content":{"rendered":"<p>\t\t\t\t\t\t\tCity of Kyle officials have made significant progress on eight road projects included in a road bond approved by voters in November 2022.<\/p>\n<p>At a Feb. 17 meeting, council members received updates on the projects, including progress on ongoing projects, completed projects and total cost estimations.<\/p>\n<p>The overview<\/p>\n<p>Over 80% of the needed land parcels are in the later stages of acquisition, said Rick Klatt, General Engineering Consultant program manager. In total, 207 parcels are required.<\/p>\n<p>The projects, aiming to improve the city\u2019s transportation network, will develop new roads and reconstruct and widen existing roads, <a href=\"https:\/\/communityimpact.com\/austin\/san-marcos-buda-kyle\/transportation\/2025\/04\/03\/kyle-city-council-opts-for-faster-construction-for-old-stagecoach-road-center-street-roadwork\/\" rel=\"nofollow noopener\" target=\"_blank\">according to previous Community Impact reporting<\/a>. The <a href=\"https:\/\/www.kyleroadbonds.com\/\" rel=\"nofollow noopener\" target=\"_blank\">road developments in the bond<\/a> include:<\/p>\n<p><a href=\"https:\/\/communityimpact.com\/austin\/san-marcos-buda-kyle\/transportation\/2025\/10\/31\/check-out-8-hays-county-transportation-updates\/\" rel=\"nofollow noopener\" target=\"_blank\">Marketplace Avenue<\/a>: connects the northern and southern segments of the road, adds 0.6 miles of new roadway and widens a pre-existing sectionBebee Road, West and East: realigns sharp curves and adds capacity to a 1-mile stretch with a new roundabout for the western portion; adds approximately 2.1 miles of a new four-lane roadway and three new roundabouts for the eastern portionKohlers to Seton: extends a portion of the roadway and adds an overpass to create space for a Kohlers Crossing connectionWindy Hill Road: expands the roadway to four lanes, improves intersections, extends a low water crossing culvert and adds modern drainage facilitiesCenter Street: expands a two-lane section of roadway to three lanes and widens the center lane of the existing three-lane sectionBunton Creek Road: improves intersections, widens travel lanes, upgrades pedestrian and bicycle facilities, and improves the existing roundaboutKyle Parkway\/Lehman Road: extends a portion of the thoroughfare to four lanes and extends Kyle Parkway to connect with the new segmentOld Stagecoach Road: widens and reconstructs a portion of the roadway, expanding Old Stagecoach Road North to four lanes and Old Stagecoach Road to three lanes<img decoding=\"async\" src=\"https:\/\/public.flourish.studio\/visualisation\/27797209\/thumbnail\" width=\"100%\" alt=\"visualization\"\/><\/p>\n<p>Zooming in<\/p>\n<p>The total estimated cost of the projects is between $2.9 million and $3.1 million, <a href=\"https:\/\/legistarweb-production.s3.amazonaws.com\/uploads\/attachment\/pdf\/3908243\/Exhibit_2_-_Presentation.pdf\" rel=\"nofollow noopener\" target=\"_blank\">according to agenda documents<\/a>. The approximation assumes a 10% to 15% contingency to account for unforeseen factors or construction changes.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/02\/1772097430_148_thumbnail.jpeg\" width=\"100%\" alt=\"visualization\"\/>\u201cWe know it&#8217;s going to be a lot of disruption in the community,\u201d said Mike Trimble, city of Kyle director of transportation and public works. \u201cWe talk about what that looks like from a traffic control plan perspective, [and] how we&#8217;re going to try to keep roads open. We are going to try to keep mobility on most of these roadways.\u201d<\/p>\n<p>&#8220;&gt;<\/p>\n","protected":false},"excerpt":{"rendered":"City of Kyle officials have made significant progress on eight road projects included in a road bond approved&hellip;\n","protected":false},"author":2,"featured_media":180983,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[132,134,133,110,5196,13982,5804,72603,2628,3174,32319,72602],"class_list":{"0":"post-180982","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-austin","8":"tag-austin","9":"tag-austin-headlines","10":"tag-austin-news","11":"tag-development","12":"tag-expansion","13":"tag-kyle","14":"tag-new","15":"tag-overpass","16":"tag-projects","17":"tag-road","18":"tag-roundabout","19":"tag-widening"},"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/180982","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=180982"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/180982\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/180983"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=180982"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=180982"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=180982"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}