{"id":181783,"date":"2026-02-26T20:32:08","date_gmt":"2026-02-26T20:32:08","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/181783\/"},"modified":"2026-02-26T20:32:08","modified_gmt":"2026-02-26T20:32:08","slug":"austin-energys-demand-response-program-delivers-record-results-in-2025","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/181783\/","title":{"rendered":"Austin Energy\u2019s Demand Response program delivers record results in 2025"},"content":{"rendered":"<p>February 26, 2026<\/p>\n<p><img decoding=\"async\" alt=\"two engineers talking\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/02\/commercial-dr.jpg\" style=\"height: 267px; width: 400px; float: right; margin-bottom: 10px; margin-left: 10px;\" class=\"imgRes\"\/>Austin Energy marked a record year in its 2025 Demand Response program, reinforcing the utility\u2019s commitment to grid reliability and sustainability. The program\u2019s success was driven by a targeted rollout plan last summer, ensuring reliable service during peak demand.<\/p>\n<p>A demand response program manages electricity consumption during peak demand times to reduce strain on the power grid and avoid outages and high costs. The utility is working diligently to expand demand response programs, targeting 78 megawatts by 2027 and 270 megawatts by 2035 as part of its <a href=\"https:\/\/austinenergy.com\/about\/reports\/generation-resource-planning\" rel=\"nofollow noopener\" target=\"_blank\">Resource, Generation and Climate Protection Plan<\/a>.<\/p>\n<p>Through innovative strategies and strong community participation, the program delivered measurable benefits for customers and the electric grid.<\/p>\n<p>    Peak Load Reduction: Austin Energy achieved an estimated average peak load drop of 57 megawatts (MW) during high-demand periods, enough to power more than 14,000 homes.<br \/>\n    Enrollment Growth: Commercial customer participation surged by 30%, with improved event performance averaging 6% across approximately 900 locations.<\/p>\n<p>Austin Energy also enrolled all 195 eligible City of Austin facilities in its Commercial Demand Response program, further strengthening local resilience.<\/p>\n<p>The utility continues to offer rebates, <a href=\"https:\/\/austinenergy.com\/about\/news\/news-releases\/2025\/Austin-Energy-expands-Power-Partner-Electric-Vehicle-Program\" rel=\"nofollow noopener\" target=\"_blank\">add providers<\/a>\u00a0and manage charging for certain EVs as part of its <a href=\"https:\/\/austinenergy.com\/about\/news\/news-releases\/2025\/Austin-Energy-expands-Power-Partner-Electric-Vehicle-Program\" rel=\"nofollow noopener\" target=\"_blank\">Power Partner\u2120 EV Program<\/a>, enabling electric vehicle owners to earn bill credits by supporting grid stability during peak times. During designated Power Partner events, Austin Energy will temporarily pause or reduce charging speed on a participant\u2019s Level 2 EV charger or qualifying vehicle.<\/p>\n<p> These adjustments are minor, do not drain battery charge, and can be manually overridden at any time.<\/p>\n<p>\u201cAustin Energy\u2019s Demand Response program is just one small part of our efforts to maintain reliability while advancing clean energy goals,\u201d said Austin Energy General Manager Stuart Reilly. \u201cThe growth and performance improvements we\u2019ve seen this year demonstrate the power of innovation and customer collaboration.\u201d<\/p>\n<p>    <\/p>\n","protected":false},"excerpt":{"rendered":"February 26, 2026 Austin Energy marked a record year in its 2025 Demand Response program, reinforcing the utility\u2019s&hellip;\n","protected":false},"author":2,"featured_media":168419,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[132,134,133],"class_list":{"0":"post-181783","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-austin","8":"tag-austin","9":"tag-austin-headlines","10":"tag-austin-news"},"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/181783","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=181783"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/181783\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/168419"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=181783"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=181783"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=181783"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}