{"id":187129,"date":"2026-03-02T19:24:12","date_gmt":"2026-03-02T19:24:12","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/187129\/"},"modified":"2026-03-02T19:24:12","modified_gmt":"2026-03-02T19:24:12","slug":"see-5-road-project-updated-around-dallas-fort-worth","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/187129\/","title":{"rendered":"See 5 road project updated around Dallas-Fort Worth"},"content":{"rendered":"<p>\t\t\t\t\t\t\tStay up to date with five road projects happening or planned in Collin County, Denton County and Tarrant County.<\/p>\n<p>Collin County<\/p>\n<p><a href=\"https:\/\/communityimpact.com\/dallas-fort-worth\/frisco\/transportation\/2026\/02\/24\/check-out-12-transportation-projects-in-frisco\/\" rel=\"nofollow noopener\" target=\"_blank\">Legacy Drive<\/a><\/p>\n<p>Project: Legacy Drive will be updated from Main Street to Panther Creek Parkway.<\/p>\n<p>Updates: The project is in the planning phase, and details regarding the project are not yet available.<\/p>\n<p>Timeline: mid-2027-mid-2029Cost: $23 millionFunding sources: city of Frisco, external fundingDenton County <\/p>\n<p><a href=\"https:\/\/communityimpact.com\/dallas-fort-worth\/denton\/transportation\/2026\/02\/20\/check-out-6-transportation-updates-around-denton\/\" rel=\"nofollow noopener\" target=\"_blank\">Bonnie Brae Street<\/a><\/p>\n<p>Project:<\/p>\n<p> Bonnie Brae Street is being reconstructed to widen three miles from Scripture Street to Loop 288 and build a continuous four-lane divided road.<\/p>\n<p>Update: Contractors installed storm drain lines and curb inlets between Riney Road and North Elm Street, Denton officials confirmed.<\/p>\n<p>Timeline: The road reopened Feb. 20 along this portion. The sixth phase is expected to be complete in 2027.Cost: $38 million for sixth phaseFunding source: city of DentonNorth Bernard Street reconstruction<\/p>\n<p>Project:<\/p>\n<p> Work includes completely reconstructing the street, drainage improvements and utility updates. <\/p>\n<p>Update: City staff said crews with the city have set up traffic control and started installing the water main.<\/p>\n<p>Timeline: late July completionCost: part of $50 million package from 2019 bondFunding source: city of DentonTarrant County<\/p>\n<p><a href=\"https:\/\/communityimpact.com\/dallas-fort-worth\/grapevine-colleyville-southlake\/transportation\/2026\/02\/25\/see-6-road-project-updates-in-colleyville-grapevine-southlake-trophy-club\/\" rel=\"nofollow noopener\" target=\"_blank\">Bedford Road bridge<\/a><\/p>\n<p>Project: <\/p>\n<p>Work includes elevating Bedford Road out of the Little Bear Creek floodplain between Somerset Boulevard and Saddlebrook Drive in Colleyville.<\/p>\n<p>Update: Colleyville City Council approved a preliminary design contract with Halff Associates at the Feb. 3 council meeting.<\/p>\n<p>Timeline: Preliminary designs are expected to take six months to complete.Cost: $313,400Funding source: city of Colleyville<a href=\"https:\/\/communityimpact.com\/dallas-fort-worth\/keller-roanoke-northeast-fort-worth\/transportation\/2026\/02\/23\/part-of-mount-gilead-road-to-be-closed-through-june-for-water-line-work\/\" rel=\"nofollow noopener\" target=\"_blank\">Mount Gilead Road<\/a> <\/p>\n<p>Project:<\/p>\n<p> Water lines will be installed from Robin Drive to Bancroft Road.<\/p>\n<p>Update: The road between Robin Drive and Bancroft Road will operate as a southbound-only route.<\/p>\n<p>Timeline: Work to be completed by the end of May.Cost: $1.6 millionFunding source: city of Keller<\/p>\n","protected":false},"excerpt":{"rendered":"Stay up to date with five road projects happening or planned in Collin County, Denton County and Tarrant&hellip;\n","protected":false},"author":2,"featured_media":187130,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10],"tags":[64798,74716,1494,712,116,118,117,74714,14249,74715,4780,840],"class_list":["post-187129","post","type-post","status-publish","format-standard","has-post-thumbnail","category-fort-worth","tag-bedford-road-bridge","tag-bonnie-brae-street","tag-construction","tag-dallas-fort-worth","tag-fort-worth","tag-fort-worth-headlines","tag-fort-worth-news","tag-legacy-drive-updates","tag-mount-gilead-road","tag-north-bernard-street-reconstruction","tag-road-work","tag-transportation"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/187129","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=187129"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/187129\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/187130"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=187129"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=187129"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=187129"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}