{"id":19754,"date":"2025-10-24T20:12:13","date_gmt":"2025-10-24T20:12:13","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/19754\/"},"modified":"2025-10-24T20:12:13","modified_gmt":"2025-10-24T20:12:13","slug":"travis-county-to-fund-125k-passenger-rail-study-between-austin-san-antonio","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/19754\/","title":{"rendered":"Travis County to fund $125K passenger rail study between Austin, San Antonio"},"content":{"rendered":"<p>\t\t\t\t<a href=\"https:\/\/www.traviscountytx.gov\/\" rel=\"nofollow noopener\" target=\"_blank\">Travis County<\/a> officials approved a $124,953 feasibility study Oct. 21, exploring commuter rail options between Austin and San Antonio.<\/p>\n<p>The big picture<\/p>\n<p>An initiative long championed by Travis County Judge Andy Brown, the study will evaluate car-alternative passenger rail options using land already managed by the state along major highways and interstates between the two cities, including existing rail infrastructure, with potential service options from the <a href=\"https:\/\/www.amtrak.com\/stations\/sas\" rel=\"nofollow noopener\" target=\"_blank\">Amtrak station<\/a> in San Antonio to the <a href=\"https:\/\/www.austintexas.gov\/airport\" rel=\"nofollow noopener\" target=\"_blank\">Austin-Bergstrom International Airport<\/a>.<\/p>\n<p>The theoretical path would run from downtown Austin to the east along Hwy. 71 past the airport, south down SH 130 and pop back west into San Antonio along I-10, Brown said. He noted the study is currently only expected to look at SH 130 and I-10, with Hwy. 71 posing additional complications.<\/p>\n<p>Brown said proponents of a commuter line have long hoped to partner with <a href=\"https:\/\/www.up.com\/\" rel=\"nofollow noopener\" target=\"_blank\">Union Pacific<\/a>\u2014which operates existing freight lines along I-35\u2014to bring passenger rail service to the area, but the company has prioritized freight operations.<\/p>\n<p>He explained the new study will examine how a passenger rail line could fit within existing transportation corridors without requiring significant private land acquisition, making a route between <a href=\"https:\/\/www.wilcotx.gov\/\" rel=\"nofollow noopener\" target=\"_blank\">Williamson<\/a> and Travis Counties and <a href=\"https:\/\/www.bexar.org\/\" rel=\"nofollow noopener\" target=\"_blank\">Bexar County<\/a> more feasible and potentially faster to develop.<\/p>\n<p>\u201cIf we got on it quickly, we can build it before I-35 construction is finished,\u201d Brown said.<\/p>\n<p>The study is expected to take 175 days, and it will cover project management, engineering, visibility estimates and a summary report.<\/p>\n<p>Quote of note<\/p>\n<p>\u201cAs we look at the way that Austin and San Antonio are merging as a metroplex, it is important, particularly when you have projects like I-35 [reconstruction], that we can create public transit options,\u201d Travis County Commissioner Jeff Travillion said.<\/p>\n<p>Some context<\/p>\n<p>Brown and Bexar County Judge Peter Sakai created the <a href=\"https:\/\/www.traviscountytx.gov\/commissioners-court\/county-judge\/tprac\" rel=\"nofollow noopener\" target=\"_blank\">Texas Passenger Rail Advisory Committee<\/a> in early 2024 to advocate for federal investment and the expansion of passenger rails across Central Texas.<\/p>\n<p>&#8220;If we had a great service between here and San Antonio that left several times a day that was quick and efficient and safe, I&#8217;ve seen a study that says we would take 25% of the traffic off of I-35 between [Austin] and San Antonio,\u201d Brown said in late 2024.<\/p>\n<p>With the Austin-San Antonio corridor among the nation\u2019s fastest-growing regions\u2014expected to top 8 million residents by 2050\u2014local leaders say new rail infrastructure is essential to ease mounting pressure on the area\u2019s transportation network.<\/p>\n<p>\u201cThe Austin-San Antonio Regional gross domestic product grew by 48.1%, or $125.1 billion, in the past five years and is likely to continue at a similar rate. This tremendous growth and economic development provide opportunities, while also placing significant strain on existing infrastructure,\u201d a letter from the advisory committee to the Texas Legislature states. \u201cEmployers cite affordability, housing and transportation as key challenges to securing the workforce they need. The addition of new passenger rail between our communities will help develop a robust workforce pipeline across the Austin-San Antonio megaregion.\u201d<\/p>\n<p>Zooming out<\/p>\n<p>The county\u2019s initiative is intended to compliment an existing <a href=\"https:\/\/www.txdot.gov\/\" rel=\"nofollow noopener\" target=\"_blank\">Texas Department of Transportation<\/a> study underway evaluating approximately 45 miles along the I-35 corridor from SH 45 SE near Buda to Cibolo Valley Drive just outside of San Antonio&#8217;s Northeast Side\u2014following the existing Union Pacific freight line, Brown said.<\/p>\n<p>The <a href=\"https:\/\/www.txdot.gov\/mymobility35\/projects\/i35-austin-to-san-antonio-link-study.html\" rel=\"nofollow noopener\" target=\"_blank\">I-35 study<\/a> developed and analyzed 11 preliminary alternatives for the corridor, as current traffic volumes exceed the existing design configuration, according to TxDOT documents.<\/p>\n<p>The proposed alternatives\u2014which include general purpose lanes, HOV lanes, truck-only lanes, commuter lines or a combination of lane types\u2014will continue to be reviewed and refined as the project moves forward. No final decisions have been made, a spokesperson for the agency said, noting each option still requires federally-mandated environmental review, schematic design and detailed planning before it could be implemented.<\/p>\n<p>According to county staff, TxDOT\u2019s study is expected to wrap up in March 2026.<\/p>\n<p>One more thing<\/p>\n<p>Of the proposed alternatives, a passenger rail lane is being considered as a transportation mode, which would see the construction of a rail system in place of, or in addition to, added vehicle lanes.<\/p>\n<p>TxDOT held multiple public input open houses throughout 2024, gathering 174 comments from community members. According to TxDOT documents, rail was the top-ranked alternative, followed by bus and other transit lanes, HOV lanes, and freight lanes.<\/p>\n<p>The Capital Area Metropolitan Planning Agency, the region\u2019s transportation planning organization, has also expressed interest in multimodal lane options along the corridor. Local officials, including New Braunfels council member Andr\u00e9s Campos-Delgado, voiced concerns about adding more vehicular lanes to I-35 and supported rail as an alternative.<\/p>\n<p>According to the <a href=\"https:\/\/www.txdot.gov\/content\/dam\/docs\/division\/rrd\/2024-texas-rail-plan.pdf\" rel=\"nofollow noopener\" target=\"_blank\">2024 TxDOT Rail Plan<\/a>, which outlines the agency\u2019s priorities through 2050, the agency is pursuing federal funding to evaluate a potential rail corridor connecting the Dallas-Fort Worth area, Austin, San Antonio and Houston\u2014known as the Texas Triangle.\n\t\t\t\t\t\t\t<\/p>\n","protected":false},"excerpt":{"rendered":"Travis County officials approved a $124,953 feasibility study Oct. 21, exploring commuter rail options between Austin and San&hellip;\n","protected":false},"author":2,"featured_media":19755,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[132,134,133,2143,15128,12849,15127,4775,5368,1880,1454,223,13476,7559,82,15129,9977,840,394,271],"class_list":["post-19754","post","type-post","status-publish","format-standard","has-post-thumbnail","category-austin","tag-austin","tag-austin-headlines","tag-austin-news","tag-central-texas","tag-commute","tag-commuter-rail","tag-feasibility-study","tag-i-35","tag-light-rail","tag-metroplex","tag-near-me","tag-news","tag-passenger-rail","tag-public-transit","tag-san-antonio","tag-texas-triangle","tag-traffic-congestion","tag-transportation","tag-travis-county","tag-txdot"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/19754","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=19754"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/19754\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/19755"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=19754"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=19754"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=19754"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}