{"id":221407,"date":"2026-03-26T12:53:16","date_gmt":"2026-03-26T12:53:16","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/221407\/"},"modified":"2026-03-26T12:53:16","modified_gmt":"2026-03-26T12:53:16","slug":"mckinney-pz-approves-plan-for-downtown-office-building-expansion","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/221407\/","title":{"rendered":"McKinney P&#038;Z approves plan for downtown office building expansion"},"content":{"rendered":"<p>\t\t\t\t\t\t\tPlanning is underway to expand an existing one-story office building at 225 E. Virginia St. in downtown McKinney.<\/p>\n<p>The overview<\/p>\n<p>McKinney\u2019s Planning and Zoning Commission approved a site plan for the project during a <a href=\"https:\/\/mckinneytx.new.swagit.com\/videos\/379103?ts=228\" rel=\"nofollow noopener\" target=\"_blank\">March 24 meeting<\/a>. The applicant is proposing to add an additional 13,181 square feet of office space to the existing building, according to a <a href=\"https:\/\/mckinney.legistar.com\/View.ashx?M=F&amp;ID=15323778&amp;GUID=30F31469-F951-4713-8650-DB4E8D4E7E48\" rel=\"nofollow noopener\" target=\"_blank\">proposed site plan<\/a>. The addition will be one story ranging between 18-20 feet in height.<\/p>\n<p>&#8220;&gt;<\/p>\n<p>The commission\u2019s approval was required since the applicant requested several design exceptions, City Planner Kyara Robinson said.<\/p>\n<p>\u201cThe exceptions are generally [for] building form, facade composition and transparency standards,\u201d she said. \u201cAll design exceptions support efforts to extend the current office use and rehabilitate the building.\u201d<\/p>\n<p>City staff recommended approval of the site plan with the requested design exceptions, according to a <a href=\"https:\/\/mckinney.legistar.com\/ViewReport.ashx?M=R&amp;N=Text&amp;GID=81&amp;ID=6722566&amp;GUID=5E4EE7B7-A056-4A2A-99CC-724A48B4764E&amp;Title=Legislation+Text\" rel=\"nofollow noopener\" target=\"_blank\">city document<\/a>.<\/p>\n<p>More details<\/p>\n<p>John Tedesco, a civil engineer with Kimley-Horn, said company officials were planning to relocate its McKinney office to the building after it&#8217;s been expanded. <a href=\"https:\/\/www.kimley-horn.com\/location\/mckinney-tx\/\" rel=\"nofollow noopener\" target=\"_blank\">Kimley-Horn\u2019s McKinney office<\/a> is currently located at 260 Davis St.<\/p>\n<p>&#8220;&gt;<\/p>\n<p>\u201cThis would be for our office to relocate over here,\u201d Tedesco said.<\/p>\n<p>Plans for the project include demolition of the parking lot on the block&#8217;s west side and utilizing that space to add onto the existing building, according to a <a href=\"https:\/\/mckinney.legistar.com\/View.ashx?M=F&amp;ID=15323776&amp;GUID=A0780E64-2F8F-49E1-AB96-2D9B8A8EE026\" rel=\"nofollow noopener\" target=\"_blank\">letter of intent<\/a>. The parking lot is a private lot that&#8217;s not open to the public, according to signs posted onsite. The existing building on-site currently measures 16,095 square feet and is one story tall, according to the site plan.<\/p>\n<p>\u201cWe\u2019re very eager to be a block closer to the square [and] continue to be here in downtown McKinney,\u201d Tedesco said.<\/p>\n","protected":false},"excerpt":{"rendered":"Planning is underway to expand an existing one-story office building at 225 E. Virginia St. in downtown McKinney.&hellip;\n","protected":false},"author":2,"featured_media":221408,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10],"tags":[86206,86207,116,118,117,34176,86209,86208],"class_list":["post-221407","post","type-post","status-publish","format-standard","has-post-thumbnail","category-fort-worth","tag-development-news-in-downtown-mckinney","tag-downtown-mckinney-office-development","tag-fort-worth","tag-fort-worth-headlines","tag-fort-worth-news","tag-mckinney-development-news","tag-mckinney-planning-and-zoning-commission","tag-office-development-in-mckinney"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/221407","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=221407"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/221407\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/221408"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=221407"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=221407"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=221407"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}