{"id":231566,"date":"2026-04-02T09:04:18","date_gmt":"2026-04-02T09:04:18","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/231566\/"},"modified":"2026-04-02T09:04:18","modified_gmt":"2026-04-02T09:04:18","slug":"round-rock-city-council-oks-146k-contract-tied-to-gattis-school-road-construction","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/231566\/","title":{"rendered":"Round Rock City Council OKs $146K contract tied to Gattis School Road construction"},"content":{"rendered":"<p>\t\t\t\t\t\t\tRound Rock City Council unanimously approved a contract for construction materials testing services tied to ongoing improvements along Gattis School Road.<\/p>\n<p>What\u2019s happening<\/p>\n<p>The agreement, approved <a href=\"https:\/\/roundrock.legistar.com\/LegislationDetail.aspx?ID=7952785&amp;GUID=B1CC34FA-FFD3-4179-9BB1-94CB1F87303A\" rel=\"nofollow noopener\" target=\"_blank\">March 26<\/a>, authorizes city officials to enter into a contract with Raba Kistner Inc. to support the <a href=\"https:\/\/www.roundrocktexas.gov\/transportprojects\/gattis-school-road-segment-6\/\" rel=\"nofollow noopener\" target=\"_blank\">Gattis School Road Segment 6 project<\/a>.<\/p>\n<p>The firm will provide testing services to ensure materials used during construction meet engineering standards and project specifications.<\/p>\n<p>Under the agreement, Raba Kistner will conduct field and laboratory testing on materials such as soil, concrete and asphalt throughout construction.<\/p>\n<p>The contract is not to exceed $146,548.05 and will remain in effect until the project is completed.<\/p>\n<p>Assessing the need<\/p>\n<p>Materials testing is a standard step in roadway construction, helping verify that infrastructure is built to design specifications and safety standards, according to city documents.<\/p>\n<p>The testing contract supports quality control as construction is underway on a $23 million effort to widen the corridor, with lane closures and traffic shifts expected through 2027.<\/p>\n<p>Construction on the widening project is expected to take about two years, with testing services continuing alongside active construction.<\/p>\n<p>Some context<\/p>\n<p>Construction is already underway on <a href=\"https:\/\/communityimpact.com\/austin\/round-rock\/transportation\/2026\/02\/03\/more-gattis-school-road-construction-starts-lane-closures-expected\/\" rel=\"nofollow noopener\" target=\"_blank\">Segment 6<\/a>, a $23 million roadway project along Gattis School Road between Via Sonoma Trail and Red Bud Lane.<\/p>\n<p>Work began Feb. 2 and is expected to continue through late 2027.<\/p>\n<p>Once complete, the project will widen the corridor from four lanes to a six-lane divided arterial and include a raised median, intersection upgrades, additional turn lanes, and new pedestrian and bicycle facilities.<\/p>\n<p>The work is part of the city\u2019s broader <a href=\"https:\/\/www.roundrocktexas.gov\/city-departments\/transportation\/transportation-master-plan\/\" rel=\"nofollow noopener\" target=\"_blank\">Transportation Master Plan<\/a> to modernize the Gattis School Road corridor.<\/p>\n<p>&#8220;&gt;<\/p>\n","protected":false},"excerpt":{"rendered":"Round Rock City Council unanimously approved a contract for construction materials testing services tied to ongoing improvements along&hellip;\n","protected":false},"author":2,"featured_media":101212,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[132,134,133,89589,27146,89591,89592,89594,89588,89590,89593,89595,71428],"class_list":{"0":"post-231566","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-austin","8":"tag-austin","9":"tag-austin-headlines","10":"tag-austin-news","11":"tag-gattis-school-road-segment-6","12":"tag-gattis-school-road-widening","13":"tag-materials-testing-contract-round-rock","14":"tag-raba-kistner-round-rock","15":"tag-round-rock-construction-news","16":"tag-round-rock-gattis-school-road","17":"tag-round-rock-road-project","18":"tag-round-rock-transportation-master-plan","19":"tag-texas-infrastructure-round-rock","20":"tag-williamson-county-road-projects"},"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/231566","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=231566"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/231566\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/101212"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=231566"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=231566"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=231566"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}