{"id":238402,"date":"2026-04-07T07:12:08","date_gmt":"2026-04-07T07:12:08","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/238402\/"},"modified":"2026-04-07T07:12:08","modified_gmt":"2026-04-07T07:12:08","slug":"183a-toll-airport-updates-6-austin-metro-transportation-updates","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/238402\/","title":{"rendered":"183A Toll, airport updates: 6 Austin metro transportation updates"},"content":{"rendered":"<p>\t\t\t\t\t\t\tCheck out six upcoming or ongoing transportation projects across the Austin metro.<\/p>\n<p>Upcoming projects <\/p>\n<p><a href=\"https:\/\/communityimpact.com\/austin\/cedar-park\/transportation\/2026\/03\/23\/highway-upgrades-road-extensions-4-transportation-updates-affecting-cedar-park-commuters\/\" rel=\"nofollow noopener\" target=\"_blank\">183A Toll at Scottsdale Drive dedicated U-turn<\/a><\/p>\n<p>Project: This project will shift through-lanes west and construct a new right-turn lane at Scottsdale Drive.<\/p>\n<p>Update: Plans that include the first 30% of the design process are being reviewed.<\/p>\n<p>Timeline: expected completion winter 2027Cost: $1.3 millionFunding source: 2022 transportation bond<a href=\"https:\/\/communityimpact.com\/austin\/bastrop-cedar-creek\/transportation\/2026\/03\/26\/check-out-6-ongoing-and-upcoming-transportation-projects-in-bastrop-county\/\" rel=\"nofollow noopener\" target=\"_blank\">FM 812 improvement project<\/a><\/p>\n<p>Project: FM 812 will be upgraded to increase safety, reduce congestion and improve mobility.<\/p>\n<p>Update: The project spans from US 183 in Travis County to Hwy. 21 in Bastrop County.<\/p>\n<p>Timeline: expected to finalize design plans in spring 2026Cost: $145 millionFunding source: Texas State Highway Fund<a href=\"https:\/\/communityimpact.com\/austin\/lake-travis-westlake\/transportation\/2026\/04\/02\/final-vision-for-alternative-to-hwy-71-approved-in-bee-cave\/\" rel=\"nofollow noopener\" target=\"_blank\">Final vision for alternative to Hwy. 71 approved in Bee Cave<\/a><\/p>\n<p>Several changes to Bee Cave\u2019s Thoroughfare Plan were approved at the March 24 Bee Cave City Council meeting, marking updates to the city\u2019s future transportation goals in the area.<\/p>\n<p>One of several changes includes approval of a final alignment for a Southwest Collector road that connects to Hamilton Pool Road, intended to provide an alternative path to Hwy. 71<\/p>\n<p>The chosen option aligns the Southwest Collector to meet at the Bee Cave Elementary School driveway and includes one signalized intersection, rather than two nearby intersections.<\/p>\n<p><a href=\"https:\/\/communityimpact.com\/austin\/lake-travis-westlake\/transportation\/2026\/04\/02\/final-vision-for-alternative-to-hwy-71-approved-in-bee-cave\/\" rel=\"nofollow noopener\" target=\"_blank\">Read the full story. <\/a><\/p>\n<p><a href=\"https:\/\/communityimpact.com\/austin\/pflugerville-hutto\/transportation\/2026\/03\/19\/hutto-moves-forward-with-cr-137-roundabout-project\/\" rel=\"nofollow noopener\" target=\"_blank\">Hutto moves forward with CR 137 roundabout project<\/a><\/p>\n<p>Plans for a new roundabout near CR 137 and FM 1660 in Hutto are in the works, as City Council approved grant funding for the project during a March 12 meeting.<\/p>\n<p>The project, which is being led by the Hutto Economic Development Corp., includes the construction of a roundabout and additional lanes at the intersection of CR 137 and FM 1660. The project is meant to help traffic flow better along the two roadways.<\/p>\n<p>In a 4-1 vote, Hutto City Council approved $11.2 million in economic development grant funding for the project.<\/p>\n<p><a href=\"https:\/\/communityimpact.com\/austin\/pflugerville-hutto\/transportation\/2026\/03\/19\/hutto-moves-forward-with-cr-137-roundabout-project\/\" rel=\"nofollow noopener\" target=\"_blank\">Read the full story. <\/a><\/p>\n<p>Ongoing projects <\/p>\n<p><a href=\"https:\/\/communityimpact.com\/austin\/leander-liberty-hill\/transportation\/2026\/03\/27\/leander-liberty-hill-roads-check-out-whats-under-construction\/\" rel=\"nofollow noopener\" target=\"_blank\">Ronald Reagan Boulevard lane widening<\/a><\/p>\n<p>Project: Work is widening 7 miles of roadway on Ronald Reagan Boulevard from FM 3405 to SH 29 with a northbound-only section and a separate two-lane southbound road.<\/p>\n<p>Update: Construction is currently underway.<\/p>\n<p>Timeline: August 2024-summer 2027Cost: $52.4 millionFunding source: Williamson County 2019 road bond<a href=\"https:\/\/communityimpact.com\/austin\/central-austin\/transportation\/2026\/03\/30\/austin-to-shutter-south-terminal-as-airport-expansion-continues-future-concourse-m-designs-revealed\/\" rel=\"nofollow noopener\" target=\"_blank\">Austin to shutter South Terminal as airport expansion continues; future Concourse M designs revealed<\/a><\/p>\n<p>The South Terminal at Austin-Bergstrom International Airport officially shut down March 31 after less than a decade in operation.<\/p>\n<p>The auxiliary terminal will be demolished to make way for new midfield taxiways as part of the multiyear Journey with AUS campus expansion. That includes the addition of the 26-gate Concourse B with a new connecting tunnel to the existing Barbara Jordan Terminal, and the development of a temporary six-gate southern terminal called Concourse M.<\/p>\n<p>While new terminal development will take several years, other Journey with AUS initiatives will be completed in the coming months. Both the West Gate expansion and terminal atrium infill projects will open in 2026, according to Austin Aviation.<\/p>\n<p><a href=\"https:\/\/communityimpact.com\/austin\/central-austin\/transportation\/2026\/03\/30\/austin-to-shutter-south-terminal-as-airport-expansion-continues-future-concourse-m-designs-revealed\/\" rel=\"nofollow noopener\" target=\"_blank\">Read the full story. <\/a><\/p>\n<p>&#8220;&gt;<\/p>\n","protected":false},"excerpt":{"rendered":"Check out six upcoming or ongoing transportation projects across the Austin metro. Upcoming projects 183A Toll at Scottsdale&hellip;\n","protected":false},"author":2,"featured_media":238403,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[91631,19891,91634,132,134,133,25597,91635,7600,1604,91632,8384,7603,91633,272],"class_list":{"0":"post-238402","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-austin","8":"tag-183a-toll","9":"tag-abia","10":"tag-abia-south-terminal","11":"tag-austin","12":"tag-austin-headlines","13":"tag-austin-news","14":"tag-austin-traffic","15":"tag-austin-traffic-news","16":"tag-bee-cave","17":"tag-community-impact","18":"tag-cr-137","19":"tag-fm-812","20":"tag-hwy-71","21":"tag-ronald-reagan-blvd","22":"tag-traffic"},"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/238402","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=238402"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/238402\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/238403"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=238402"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=238402"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=238402"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}