{"id":261343,"date":"2026-04-22T16:33:29","date_gmt":"2026-04-22T16:33:29","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/261343\/"},"modified":"2026-04-22T16:33:29","modified_gmt":"2026-04-22T16:33:29","slug":"new-turn-lanes-shared-use-paths-3-east-austin-transportation-updates-to-know","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/261343\/","title":{"rendered":"New turn lanes, shared-use paths: 3 East Austin transportation updates to know"},"content":{"rendered":"<p>\t\t\t\t\t\t\tDiscover the latest completed and upcoming transportation projects in East Austin, from new bike lanes and shared-use paths to safer intersections and upgraded bus stops.<\/p>\n<p>Ongoing projects <\/p>\n<p>Cesar Chavez Street and Red Bluff Road<\/p>\n<p>Project: The project includes safer intersections and lane configurations, protected bicycle lanes, new left-turn lanes, transit access and improved bus stops and new pedestrian crossings. The city will extend the Colorado River Trail between Longhorn Dam and Shady Lane.<\/p>\n<p>Update: The city held community meetings in April and is <a href=\"https:\/\/www.speakupaustin.org\/ColoradoRiverTrail\" rel=\"nofollow noopener\" target=\"_blank\">surveying residents <\/a>on their feedback through May 11.<\/p>\n<p>Timeline: summer 2027-summer 2028 or 2029Cost: $6.5 millionFunding sources: federal funding, 2018 and 2020 Mobility BondsCompleted projects <\/p>\n<p>Airport Boulevard Shared-Use Path<\/p>\n<p>Project: The city of Austin completed a new shared-use path along the west side of Airport Boulevard between East 51st Street and Middle Fiskville Road.<\/p>\n<p>Update: The project reached completion in early April.<\/p>\n<p>Timeline: summer 2024-spring 2026Cost: $6.9 millionFunding source: 2016 Mobility BondMartin Luther King Jr. Blvd., Springdale Road and Heflin Lane intersection<\/p>\n<p>Project:<\/p>\n<p> The city dedicated a northbound left-turn bay on Springdale Road and converted Heflin Lane to right-in\/right-out only. The corridor received \u200b\u200brelocated and upgraded CapMetro bus stops as well as added raised bike lanes, restriped high-visibility crosswalks and new shared-use paths.<\/p>\n<p>Update: The project reached completion in late February.<\/p>\n<p>Timeline: summer 2025-spring 2026Cost: $3.5 millionFunding source: 2020 Mobility Bond<\/p>\n<p>&#8220;&gt;<\/p>\n","protected":false},"excerpt":{"rendered":"Discover the latest completed and upcoming transportation projects in East Austin, from new bike lanes and shared-use paths&hellip;\n","protected":false},"author":2,"featured_media":261344,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[93774,95377,132,134,97773,133,39688,67793,97777,6480,97775,97778,97776,97767,97769,97771,97772,97774,93052,97768,97770],"class_list":{"0":"post-261343","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-austin","8":"tag-airport-boulevard","9":"tag-airport-boulevard-shared-use-path","10":"tag-austin","11":"tag-austin-headlines","12":"tag-austin-mobility-bond","13":"tag-austin-news","14":"tag-austin-pedestrian-crossings","15":"tag-austin-road-construction-2026","16":"tag-capmetro-bus-stops-austin","17":"tag-cesar-chavez-street","18":"tag-cesar-chavez-street-improvements","19":"tag-colorado-river-trail-extension","20":"tag-east-austin-bike-lanes","21":"tag-east-austin-transportation-projects","22":"tag-heflin-lane","23":"tag-martin-luther-king-boulevard","24":"tag-martin-luther-king-jr-boulevard","25":"tag-martin-luther-king-jr-blvd-intersection","26":"tag-mlk-boulevard","27":"tag-red-bluff-road","28":"tag-springdale-road"},"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/261343","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=261343"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/261343\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/261344"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=261343"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=261343"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=261343"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}