{"id":261696,"date":"2026-04-22T21:03:11","date_gmt":"2026-04-22T21:03:11","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/261696\/"},"modified":"2026-04-22T21:03:11","modified_gmt":"2026-04-22T21:03:11","slug":"ut-arlington-begins-120m-university-center-renovation","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/261696\/","title":{"rendered":"UT Arlington begins $120M University Center renovation"},"content":{"rendered":"<p>                                          <img decoding=\"async\" class=\"responsive-image\" loading=\"lazy\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/04\/BRW_University-Center-Masterplan_07.jpg\"   width=\"1140\" height=\"641\" title=\"BRW_University-Center-Masterplan_07.jpg\" alt=\"Renderings of UT Arlington\u2019s University Center, when construction is completed in 2028.\"\/>                                                                                    Renderings of UT Arlington\u2019s University Center, when construction is completed in 2028.                                                                                            Courtesy                                                                            BRW Architects                                                                                        <\/p>\n<p>The University of Texas at Arlington will soon begin construction on a major renovation and alteration project to some of the buildings on its main campus, <a target=\"_blank\" rel=\"Follow nofollow noopener\" href=\"https:\/\/www.tdlr.texas.gov\/TABS\/Projects\/TABS2026018207\">records show<\/a>.<\/p>\n<p>Filings made to the Texas Department of Licensing and Regulation on Tuesday show that UT Arlington is planning to demolish a portion of the existing <a target=\"_blank\" rel=\"Follow nofollow noopener\" href=\"https:\/\/www.uta.edu\/campus-ops\/student-centers\/universitycenter\">E.H. Hereford University Center<\/a> building, at 300 W. First St. in Arlington. The filings also show it is planning a new 92,000 square foot addition to the building and a 93,000 square foot renovation. The project is expected to cost $120 million.<\/p>\n<p>The filings show that construction will start on June 1, with an estimated completion date of Dec. 31, 2028. However, the university hopes the <a target=\"_blank\" rel=\"Follow nofollow noopener\" href=\"https:\/\/www.uta.edu\/campus-ops\/student-centers\/new-uc\">project is finished<\/a> before the fall 2028 semester.<\/p>\n<p>According to a UTA webpage with project details, April 3 was the last day students could hold events in the University Center due to upcoming construction.<\/p>\n<p>The project includes modernizing student lounge spaces, new meeting space, a resource center with office space for more student organization, study space, more natural light, improved technology in meeting rooms, sustainably designed facilities and overall infrastructure improvements, according to the university.<\/p>\n<p>The building\u2019s existing basement will be the main portion of the building that will be demolished. That will make way for a three-story improvement. Departments that are housed in the building\u2019s basement will be temporarily moved to another place on campus until the project is completed.<\/p>\n<p>Last year, the university passed a referendum that raised the student union fee from $30 per semester to $150, and $75 to $170 for summer semester students to help fund the project, according to <a target=\"_blank\" rel=\"Follow nofollow noopener\" href=\"https:\/\/www.theshorthorn.com\/news\/uta-university-center-renovations-to-begin-in-december\/article_9a70af6b-8f21-4af7-9109-fd163171debb.html\">The Shorthorn<\/a>, the school\u2019s student newspaper.<\/p>\n<p>More in-depth renderings and plans for the future of the building will be released in the coming months.<\/p>\n<p>The University Center was first built in 1953 and is the central hub of student life on campus. It includes dining options, stores, cafes, a ballroom, mail center, the school\u2019s career services office and a number of student organization spaces.<\/p>\n<p>\u2b50 Our editors also recommend: <\/p>\n<p>                <a href=\"https:\/\/www.star-telegram.com\/profile\/313542365\/\" rel=\"nofollow noopener\" target=\"_blank\"><br \/>\n                        <img decoding=\"async\" class=\"author-thumb\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/04\/1776891791_606_STAFF_Samuel ONeal.jpg\" width=\"400\" height=\"400\" alt=\"Profile Image of Samuel O\u2019Neal\" loading=\"lazy\"\/><br \/>\n                    <\/a><\/p>\n<p>                <a class=\"author-name\" href=\"https:\/\/www.star-telegram.com\/profile\/313542365\/\" rel=\"nofollow noopener\" target=\"_blank\">Samuel O\u2019Neal<\/a><\/p>\n<p>                    Fort Worth Star-Telegram<\/p>\n<p>            Samuel O\u2019Neal is the K-12 Education Reporter at the Fort Worth Star-Telegram, covering public schools and policy that impacts them. He previously worked as a staff writer at the Philadelphia Inquirer and is a graduate of Temple University.\u00a0\n            <\/p>\n","protected":false},"excerpt":{"rendered":"Renderings of UT Arlington\u2019s University Center, when construction is completed in 2028. Courtesy BRW Architects The University of&hellip;\n","protected":false},"author":2,"featured_media":178204,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[150,152,151],"class_list":{"0":"post-261696","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-arlington","8":"tag-arlington","9":"tag-arlington-headlines","10":"tag-arlington-news"},"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/261696","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=261696"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/261696\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/178204"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=261696"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=261696"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=261696"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}