{"id":284686,"date":"2026-05-08T17:40:09","date_gmt":"2026-05-08T17:40:09","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/284686\/"},"modified":"2026-05-08T17:40:09","modified_gmt":"2026-05-08T17:40:09","slug":"portion-of-gattis-school-road-construction-completed","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/284686\/","title":{"rendered":"Portion of Gattis School Road construction completed"},"content":{"rendered":"<p>\t\t\t\t\t\t\tConstruction on a portion of Gattis School Road in Round Rock wrapped up this month, as the city continues roadwork to improve traffic flow and enhance safety along the street.<\/p>\n<p>The overview<\/p>\n<p>The city expanded Gattis School Road\u2014from A.W. Grimes Boulevard to Double Creek Drive\u2014into a six-lane divided roadway, as well as added pedestrian improvements and bicycle enhancements. The city also added right- and left-turn bays with new traffic signals to A.W. Grimes and Double Creek.<\/p>\n<p>&#8220;&gt;<\/p>\n<p>Work on the roughly $26-million project\u2014Gattis School Road Segment 3\u2014was <a href=\"https:\/\/communityimpact.com\/austin\/round-rock\/transportation\/2025\/12\/18\/gattis-school-road-segment-3-to-wrap-up-early-in-round-rock\/\" rel=\"nofollow noopener\" target=\"_blank\">originally expected to be completed this fall<\/a>.<\/p>\n<p>What&#8217;s next<\/p>\n<p>The city will continue work on the roadway, with construction of <a href=\"https:\/\/www.roundrocktexas.gov\/transportprojects\/gattis-school-road-segment-6\/\" rel=\"nofollow noopener\" target=\"_blank\">Gattis School Road Segment 6<\/a> still ongoing. The $23 million project will expand the roadway to six lanes, between Via Sonoma Trail and Red Bud Lane. Construction is expected to be completed in late 2027.<\/p>\n<p>&#8220;&gt;<\/p>\n","protected":false},"excerpt":{"rendered":"Construction on a portion of Gattis School Road in Round Rock wrapped up this month, as the city&hellip;\n","protected":false},"author":2,"featured_media":284687,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[132,134,133,27145,6240,52621,89588,89590,81862,104656,104657],"class_list":["post-284686","post","type-post","status-publish","format-standard","has-post-thumbnail","category-austin","tag-austin","tag-austin-headlines","tag-austin-news","tag-gattis-school-road","tag-round-rock","tag-round-rock-construction","tag-round-rock-gattis-school-road","tag-round-rock-road-project","tag-round-rock-roads","tag-round-rock-roadwork","tag-round-rock-streets"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/284686","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=284686"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/284686\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/284687"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=284686"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=284686"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=284686"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}