{"id":28699,"date":"2025-10-31T01:14:14","date_gmt":"2025-10-31T01:14:14","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/28699\/"},"modified":"2025-10-31T01:14:14","modified_gmt":"2025-10-31T01:14:14","slug":"podcast-why-el-pasos-water-future-is-better-off-than-most-of-texas","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/28699\/","title":{"rendered":"Podcast: Why El Paso\u2019s water future is better off than most of Texas"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2025\/10\/1761873251_373_hqdefault.jpg\" alt=\"YouTube video\" width=\"480\" height=\"360\" data-pin-nopin=\"true\" nopin=\"nopin\"\/><\/p>\n<p><a href=\"https:\/\/rss.com\/podcasts\/the-el-paso-matters-podcast\/2294031\" rel=\"nofollow noopener\" target=\"_blank\">Water supply, data centers and customer bills. A discussion with El Paso Water<\/a><\/p>\n<p>Diego Mendoza-Moyers: Today, let\u2019s talk about water.<\/p>\n<p>In an isolated desert city like El Paso, we all know water is probably the most valuable and important resource for sustaining our community.<\/p>\n<p>We\u2019ve been in a long-term drought here in this region of Far West Texas and Southern New Mexico, exacerbated by climate change and rising temperatures. And overcoming the challenges \u2013 both natural and manmade \u2013 that come with living in the desert is the only way El Paso and Ciudad Ju\u00e1rez will continue to exist.<\/p>\n<p>Meanwhile, other cities in Texas are struggling with their water supplies.\u00a0\u00a0<\/p>\n<p>Corpus Christi in South Texas is experiencing dangerously low reservoir levels, and by next year that city may be in an emergency situation with its water supply, and they don\u2019t have great options. City leaders in Corpus recently shot down a long-proposed idea to build a billion-dollar seawater desalination plant to supply water for both residents as well as petrochemical facilities that are the backbone of the economy in that corner of Texas.<\/p>\n<p>Also, the aquifer that supplies the fast-growing suburbs between Austin and San Antonio has reached critically-low levels due to drought, which threatens the booming growth in that part of the state.\u00a0<\/p>\n<p>And aging, leaky water infrastructure across Texas causes the loss of billions of gallons of water every year.\u00a0<\/p>\n<p>You get the point. Different parts of Texas have some big water challenges, which is why <a href=\"https:\/\/elpasomatters.org\/2025\/10\/20\/el-paso-election-nov-4-2025-whats-on-ballot-early-voting-begins\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">voters next week will decide<\/a> whether to approve a $20 billion spending package to shore up the state\u2019s water supply and improve infrastructure.<\/p>\n<p>In El Paso, though, we\u2019re in a pretty good position compared with the rest of the state when it comes to water.<\/p>\n<p>City-owned El Paso Water has been fairly creative over the years to ensure we have a supply of water.\u00a0<\/p>\n<p>The U.S. Army and El Paso Water collaborated to develop the Kay Bailey Hutchison Desalination plant almost 20 years ago, and that\u2019s still the largest inland desal plant in the world. It removes the salt out of water pumped from the Hueco Bolson aquifer that stretches beneath the eastern part of El Paso County. And El Paso Water pumps water back into the Hueco Bolson, our main source of water, to try to recharge the aquifer and avoid over-pumping.<\/p>\n<p>And now, El Paso Water is spending $300 million to develop the Pure Water Center that essentially will purify sewage water to drinkable standards and send it back into our city\u2019s water supply.<\/p>\n<p>It may sound a little gross at first, but it\u2019s likely that many other arid cities will eventually adopt the same so-called \u201cdirect potable reuse\u201d technology to stretch their drinking water supplies.<\/p>\n<p>So, when you see the Rio Grande run dry in the fall after flows from Elephant Butte cease, that doesn\u2019t mean we\u2019re short on water, and that\u2019s something El Paso Water plans for every year.<\/p>\n<p>Of course, this much water-related technology doesn\u2019t come cheap. The trade-off for a sustainable drinking water supply in the desert has been water bills that rise consistently.\u00a0<\/p>\n<p>El Paso Water has implemented rate increases each year over the last decade. Going forward, El Paso Water\u2019s plan to pipe in groundwater from aquifers 90 miles east of El Paso is likely to increase bills even more.<\/p>\n<p>After all, the utility\u2019s own estimates suggest an acre-foot of groundwater \u2013 which is about 326,000 gallons \u2013 costs the utility something like $250 to produce. And drawing and treating an acre-foot of water from the Rio Grande costs about $340. For comparison, El Paso Water thinks it will cost about $1,300 to pipe in an acre-foot of water from the aquifer in Dell City.<\/p>\n<p>This importation plan and the new water treatment technology will probably make water bills here even more expensive. That question of when \u2013 or if \u2013 water becomes unaffordable for most El Pasoans is one that will determine the city\u2019s future.<\/p>\n<p>We\u2019re also seeing water-consuming data centers popping up in our area, like the $1.5 billion data center Meta is building in Northeast El Paso, which will be allowed to consume as much as one-and-a-half million gallons of water per day when it\u2019s fully built in a few years. And there\u2019s a common concern I\u2019ve heard a lot lately from El Pasoans: Where will these data centers get their water? And will there be enough left over for me and my family?<\/p>\n<p><a href=\"https:\/\/elpasomatters.org\/2025\/09\/10\/project-jupiter-data-center-santa-teresa-new-mexico-el-paso-texas-water-electricity\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">READ MORE: How much water will the $165 billion data center near El Paso use? Developers unveil figures ahead of Do\u00f1a Ana commissioners vote<\/a><\/p>\n<p>In just a moment, I\u2019ll speak with Gilbert Trejo, vice president of engineering, operations and technical services for El Paso Water, about the sustainability of our water supply, especially as we see trillion-dollar corporations developing big AI data centers here in the El Paso area.<\/p>\n<p>First, I want to mention that this El Paso Matters Podcast episode is sponsored by Tawney, Acosta and Chaparro, truck crash and injury attorneys. Their team of local, seasoned trial attorneys are ready to help if you\u2019ve been injured in a crash.<\/p>\n<p>Now, onto our conversation.\u00a0<\/p>\n<p>Gilbert, thanks for joining me. I appreciate you taking the time.\u00a0<\/p>\n<p>Gilbert Trejo: Sure. Happy to be here, Diego. Thank you for having me.<\/p>\n<p>Diego: Sure. So, just to start, John Balliew, the CEO of El Paso Water, was speaking at City Council \u2013 you were there, too \u2013 recently. John made a lot of different comments, which I want to get into, but he basically said El Paso Water is in a good position when it comes to water supply going forward. And, so, I just wonder what you can share with us and what you would tell El Pasoans about the sustainability of our water supply in general?<\/p>\n<p>Gilbert: Yeah, we\u2019re in a great spot, and we always like to talk about this. So, I\u2019m glad John was able to bring it up in front of council.\u00a0<\/p>\n<p>So, it really all starts with our 50-year water plan. So, this is something that all water utilities, water agencies have to do: submit it to the state to show that they are ready to \u2013 that they have water supply for the next 50 years. And there\u2019s a lot that goes into it, from population to the type of growth that you expect to see, not just growth or lack of growth, but the type of growth as well. There\u2019s a lot that goes into it. But, this 50-year water plan is pretty sophisticated. And, within that, you have to identify different water supplies, water sources, whether they even exist or not.\u00a0<\/p>\n<p>Ed Archuleta, president before John Balliew, he\u2019s the one who pioneered this 50-year water planning. So, even before the state mandated it, El Paso Water was already doing 50-year water plans. So, once it was mandated by the state, we were already doing it, we\u2019re comfortable doing it. And this is why we\u2019re in a good spot. So, we\u2019ve set ourselves up through this concept that we talk about. You\u2019ll hear us talk about it all the time, this diversified water portfolio, which is really, I\u2019ll refer to it to other utilities as a game plan. Like, \u201cwhat is your plan to meet your demand as your city grows, as your town grows,\u201d whatever it is?\u00a0<\/p>\n<p>And we\u2019ve had our game plan in place since the 1990s, early 1990s. We\u2019re just executing it. So, we\u2019ve known for a long time what projects needed to be done well in advance of when they\u2019re needed. So, a real good example of that is a Kay Bailey Hutchison plant. So that plant came online in 2008, but that\u2019d been talked about since the late 1990s. And these water supply projects take several years, sometimes decades, to implement. Now in other parts of the state, they may be talking about new dams and reservoirs. Those could take 20 years. So we\u2019re not building new dams or reservoirs, but it\u2019s still going to take us upwards of 10 to 15 years to do any type of project.\u00a0<\/p>\n<p>So Kay Bailey Hutchison, that plant took over 10 years to pilot, design, find the right market conditions, technology becomes available or the technology becomes mature enough to do it. So when we implement these plans, we\u2019re doing it, like, right at the peak of when we\u2019re supposed to do it. So, this is part of the planning, too. It\u2019s not just like, \u201cOh, man, we need more (supply). Let\u2019s do a project.\u201d That\u2019s not how we do it. Like, it\u2019s very thoughtful.\u00a0<\/p>\n<p>So, Kay Bailey Hutchinson is a good example. Pure Water Center is the other one. Like we\u2019re doing this way in advance. We don\u2019t need this water, per se, until 2030 is what our demand model showed back in 2012. Diego, think about that. Back in 2012, we\u2019re already thinking about this. When do we need this water? When\u2019s the right time to do these projects well in advance? Train our operators, do all these things. So, again, very thoughtful. So, when John says, \u201cYou know what? We\u2019re in a good spot,\u201d this is why. We have the game plan. We are on point executing these projects when we need them well ahead of time.<\/p>\n<p><img loading=\"lazy\" data-recalc-dims=\"1\" decoding=\"async\" width=\"780\" height=\"520\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2025\/10\/CB_Arroyo1A-1.jpg\" alt=\"\" class=\"wp-image-104696\"  \/>Gilbert Trejo, El Paso Water\u2019s vice-president for engineering, operations and technical services, says that the utility\u2019s main goals for stormwater projects are to collect water, especially runoff from the Franklin Mountains, and convey it safely through the surrounding communities, at Arroyo 1A on July 17, 2025. (Corrie Boudreaux\/El Paso Water)<\/p>\n<p>Diego: And one thing John talked about was the slowing population growth, which is something we\u2019ve reported on here about, sort of less babies being born here and school enrollment going down and these kinds of signs of slowing population. And, so, John mentioned that. It seemed like he talked about that as a positive. And, so, I\u2019m just curious your thoughts on this trend of slowing population growth and how that affects the demand for water?<\/p>\n<p>Gilbert: I think the best way to think about it is that it buys us more time. So, the plans are in place. We\u2019ve got to do these projects anyway. So, what the slowing population does, that\u2019ll affect demand, but that doesn\u2019t affect our plan. So, the fact that we have more time, per se, I said it buys us time, we have more time, that\u2019s OK. It lets us be even more thoughtful. Again, the market conditions, how we execute projects, the type of construction we do, all of this \u2013 it just helps us out in terms of it\u2019s a benefit for us, again, by giving us more time to find the right time to do this project, lets us reprioritize things in the (capital improvement plan).\u00a0<\/p>\n<p><a href=\"https:\/\/elpasomatters.org\/2024\/04\/30\/el-paso-city-council-water-impact-fees-urban-sprawl\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">LEARN MORE: El Paso Water service in new neighborhoods could cost $1 billion over 10 years. Who should shoulder the cost?<\/a><\/p>\n<p>So, it\u2019s really an optimization thing for us when we see demand models go down because population is going down. It lets us really optimize when we execute the next project, when we decide to do it. So, it\u2019s a real benefit to our customers that this is what the population means to us.\u00a0<\/p>\n<p>So, it\u2019s not that we\u2019re going to stop doing projects. It\u2019s like, it buys us time and really lets us zone in as to exactly when we want to do it.<\/p>\n<p>Diego: I think most people look at the slowing population as kind of a bad thing or something that\u2019s not good for El Paso. But, for you guys, it\u2019s maybe a little bit of a little bit of a benefit?<\/p>\n<p>Gilbert: Yeah, from that standpoint, yeah. I would say so.<\/p>\n<p>Diego: One thing John mentioned, too, El Paso Water is looking to expand the Upper Valley Water Treatment Plant. I thought that was interesting. I didn\u2019t \u2013 because that pulls water from the Rio Grande, right, or at least in part. And, so, I was curious, why would El Paso Water have more water available from the river? Does it have to do with an expected increase in river flows because there\u2019s more snow falling in Colorado or something? Does it have to do with this, I guess, proposed or pending settlement between Texas and New Mexico of this kind of long-running water dispute? I just wonder what was behind that comment about expanding this treatment plan?<\/p>\n<p>Gilbert: Diego, it goes back to the game plan. We\u2019ve been talking about expanding the Upper Valley plant for decades now. And part of our strategy and part of this 50-year water plan has always been to acquire more surface water rights, and we do that by acquiring land, or we already have the land, but we acquire more land, whether it\u2019s in the Upper Valley, Lower Valley, whoever has water rights to sell. We have a program in place to go and get these so that we can keep building up our surface water rights.\u00a0<\/p>\n<p>As development occurs, infill, in the Lower Valley, Upper Valley, folks that have rights, maybe they\u2019re looking to offload them. Sometimes we go and just ask folks, \u201cHey, you have surface water rights. You\u2019re not even using them.\u201d They\u2019re like, \u201cYeah, I don\u2019t want to use them.\u201d We\u2019ll buy them. So we have programs in place to augment our surface water rights. So, we\u2019ve been talking about, and we knew we were going to expand the Upper Valley plant from the day that it was built. That plant went live in 2010 as a result. of a regulation to remove arsenic from groundwater. But even from that time, we already knew this plant\u2019s gonna become a surface water plant at some point, once the demand is needed on the Westside, once we gain enough surface water rights in order to make it happen.\u00a0<\/p>\n<p>So, this is, again \u2013 part of our plans has always been to expand it. The question is, so why now? Yeah, we\u2019re starting to realize the demand on the Westside. We see what\u2019s going on over there up past Transmountain, starting to grow up there. We need to be way ahead of that. So part of the strategy now, especially gaining the momentum off of what\u2019s happening with the Texas Legislature, let\u2019s get some funds from the state. Let\u2019s start to design this facility. Let\u2019s really start to push this, make this plan a reality. But the fact is that we have upwards of 70,000 acre-feet of surface water rights. So, we only use around 60,000. So, we\u2019ve built up enough of a water rights bank to expand Upper Valley and that\u2019s just the plan now.<\/p>\n<p>Diego: Can you speak to the magnitude of the expansion or the, I guess, increase in production from that plant you expect?<\/p>\n<p>Gilbert: So, just conceptually right now, what the engineers are looking at is about a 5 MGD expansion of that facility for the surface water rights. So, that\u2019s generally what we\u2019re looking at. We\u2019re going to refine the model. So, we\u2019re not sure yet if it\u2019s going to be like an initial 5 and then in the future another 5 or should we just do the 10 right now. That affects how we size pumps and the size of the basins and all that. So, we\u2019re looking into that still.<\/p>\n<p>Diego: Yeah. And, so, El Paso Water supplies something, like, 110 million gallons a day, so maybe a 4% or 5% increase or something like that.\u00a0<\/p>\n<p>One thing, too \u2013 so, you all have also talked about accelerating importation of water from the groundwater rights you have in Dell City, right, over the aquifer out there. I thought that was interesting. John mentioned, again, in these comments to City Council that it was sort of like, \u201cHey, we want to preserve the groundwater resources we have here in the Hueco Bolson. And, so, we\u2019re going to accelerate importation.\u201d I just wonder if you can speak at all to that plan and maybe the impact or what you\u2019re seeing there about why accelerate the importation?<\/p>\n<p>Gilbert: Yeah, so this is, I think this is the first time maybe John really publicly started to talk about importation of water to preserve our local supplies. This is a concept that we\u2019ve been talking about for a couple years now. It\u2019s more like a philosophical type approach to what we\u2019re doing. So, it was \u2013 we\u2019re still talking about it. We\u2019re considering it. No real, I\u2019ll say, technical engineering has been done.\u00a0<\/p>\n<p>But the conversations, to take you kind of behind the scenes here between us, is \u201cLook, we have the local Hueco Bolson water supply. This is, like, it\u2019s the most precious preserved thing that we can (have).\u201d Like, it\u2019s in our mission. We have to preserve our local water supply, high-quality water services. So, we said, \u201cSo, why don\u2019t we start doing that?\u201d Like we can continue to manage how we pump the aquifer. We can continue to recharge the aquifer as much as we can through the Fred Hervey plant, which is what we\u2019re doing. The Enhanced Arroyo project, another project intended to preserve local water supply. So, again, enhance how much water we inject back into the Hueco Bolson with river water, when the demand\u2019s not there, but with river water, when it rains up on the mountain, we can put all that water into the aquifer.\u00a0<\/p>\n<p>So, we\u2019ve already established this philosophy and the strategy to preserve local supply. So, the next step is, well, we have all of this water rights in Dell City, and that aquifer does recharge. So, that\u2019s something that I don\u2019t think we talked about enough, but that\u2019s an aquifer that recharges. That\u2019s why we went out and were, I\u2019ll say, as aggressive and implemented that strategy. That aquifer recharges. So, as we pump water into El Paso from that aquifer, as it rains up on the Guadalupe Mountains, it\u2019s going to recharge. So, why not bring that water in and recharge our Hueco Bolson with it? Preserving what we have right now. So, that\u2019s the general concept that John was talking about.\u00a0<\/p>\n<p>Again, it needs some more development, the engineering, the everything behind it. We\u2019ve got to run some groundwater models, too, and we have some of this work budgeted for the next couple years. But, yeah, I\u2019m glad John put it out there because it kind of just shows how we\u2019re thinking about things. It\u2019s not such knee-jerk reaction, like, \u201cWe should do this, we should do that.\u201d\u00a0<\/p>\n<p>And unfortunately, it\u2019s just not as simple as, \u201cYou know what? We\u2019ve got to import water now, let\u2019s do it.\u201d Like there\u2019s just a bigger strategy, a bigger way to think about it. And I\u2019m glad John did it. That way we can start to put it out there so people can see how thoughtful it is, some of the work that we\u2019re doing.<\/p>\n<p>Diego: Yeah. So, one thing El Paso Water has communicated is, basically, importation is more expensive, right, than just pumping up groundwater or drawing water from the surface or from the river. And, so, is the trade-off sort of like, \u201cLet\u2019s preserve our groundwater supplies here,\u201d but the trade is maybe there\u2019s upward pressure on customer rates and bills, right? Is that sort of the calculation or kind of how you\u2019re looking at this?<\/p>\n<p>Gilbert: I think the balance \u2013 I\u2019ll use the word calculus \u2013 the calculus behind it is complicated. So, as I mentioned earlier, when we execute these projects, there\u2019s not only the groundwater models that are being done. There is the engineering analysis on technology and market conditions. There\u2019s all sorts of energy recovery technologies out there now that help reduce the cost of pumping.\u00a0<\/p>\n<p>And then there\u2019s the rate calculation models that are, and the financial models that are very complex, too. So, to start to think about this now, and let\u2019s just start to see again, when is the right time to do this? Because one thing is for sure, the more we wait, the more things get more expensive. And that\u2019s something that I think that\u2019s, we know that for sure. The more we wait, it\u2019s going to cost more.\u00a0<\/p>\n<p>So, we wait till 10 years from now, 15 years from now, it\u2019s going to cost more than now. So, can we, in a thoughtful way, assemble a project where we can run all of these models and see when is the right time to do this, how best to do it? That\u2019s what we\u2019re looking into right now. So, yes, it\u2019s complicated. There\u2019s a lot of modeling and a lot of things that go into this consideration.\u00a0<\/p>\n<p>But again, the more we get ahead of it, the more we remain in control of it. And I think that\u2019s something else that I would want our customers to know. The more proactive we are with this, the more we are in control of it. When we do it, how we do it, when we do things during market conditions, inflation, world construction conditions, like workforce things that affect supply chain matters, the way we\u2019re doing projects now, it is that complicated. But the more we remain in control of our own project versus, \u201cOh, man, we should hurry and do something,\u201d that\u2019s how things get really expensive.\u00a0<\/p>\n<p>So, we like to remain in control of all of this. So, that\u2019s how I would want our customers to think about the complexity, but how thoughtful we are in how we execute these projects.<\/p>\n<p>Diego: Yeah, that\u2019s what I\u2019ve \u2013 covering utilities, I always kind of see this ballet of the engineering and the science and then the finance and then how it all comes together to affect bills is always really interesting and more complicated than I think people realize.\u00a0<\/p>\n<p>But when people hear El Paso Water (say) \u201cHey, we\u2019re really starting to think about maybe pushing up our importation plans.\u201d Should people think, \u201cMan, our groundwater supplies are dwindling\u201d? Or I just wonder how people should think about maybe the sustainability of the groundwater supplies we have in El Paso?<\/p>\n<p>Gilbert: Well, this is why podcasts like yours, Diego, are so important, because we need to stay ahead of these messages. Because, no, that\u2019s not what people should think. One of the guiding principles, I\u2019ll say, that guides a lot of how we do projects, is that we do things out of diversification, not desperation.\u00a0<\/p>\n<p>And this is something that we talk about relative to the Pure Water Center. And all of the projects that we do. We get ahead of all of these things so that we can continue to diversify our water supply. In this case, continue to find ways to preserve our local water supply so that we remain in control of as many things as possible. Supply chain issues and the cost of steel and the cost of concrete. Like, a lot of the things are out of control. But we can see, and contractors do have very sophisticated models as to how they track these conditions. So, it gives us the ability to remain in control of as many things as possible. We can\u2019t control everything, but as many things as possible.\u00a0<\/p>\n<p>So, for our customers, no, they shouldn\u2019t say, \u201cOh, man, why are we importing water already? I thought that it wasn\u2019t until later. And I\u2019ve heard John and Gilbert talk about it\u2019s not till 2050, 2060.\u201d So, all that is true, but we continue to optimize and refine and diversify our portfolio. Which is now (why) we\u2019re thinking, \u201cWell, what if we do bring it in?\u201d So again, it\u2019s all this scenario planning that we do. We just don\u2019t set a plan, it\u2019s static, and we say, \u201cAll right, now it\u2019s time to start the next one.\u201d No, we\u2019re constantly looking to see how to optimize our projects, our water supply, what makes sense, and that\u2019s what I would want our customers to think about. Not at all to worry about, \u201cMan, why are we already importing water?\u201d It\u2019s the opposite. We are dynamic. We remain very fluid in our plans of when best to do it for the betterment of our local water supply, and really for the betterment of the water bill.\u00a0<\/p>\n<p>Because you\u2019re right, these projects, water supply projects, are expensive and they will affect the bill. But the fact is that if we can control and manage how much it affects the bill, that\u2019s really what we\u2019re after and doing things in a thoughtful way to manage that and not just hit customers with this project out of desperation saying, \u201cOh, no, something bad\u2019s happening. We\u2019ve got to do something.\u201d That\u2019s how you really slam customers with what I would call unreasonable rate increases to their bills. You cause panic. It\u2019s not very thoughtful.\u00a0<\/p>\n<p>So, I would want our customers to think about, \u201cMan, El Paso Water\u2019s being very thoughtful about how they do projects,\u201d and if that means starting to move projects in a little bit sooner, it\u2019s because we\u2019re optimizing what we\u2019re doing. It\u2019s not for any reason out of desperation or because something bad\u2019s happening.<\/p>\n<p><img loading=\"lazy\" data-recalc-dims=\"1\" decoding=\"async\" width=\"780\" height=\"439\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2025\/10\/1761873253_401_CB_MetaConstruction-3.jpg\" alt=\"\" class=\"wp-image-107276\"  \/>Construction begins on a Meta data center, located between Stan Roberts Sr. Ave. and State Line Road in Northeast El Paso, Oct. 13, 2025. (Corrie Boudreaux\/El Paso Matters)<\/p>\n<p>Diego: Yeah. All right, I want to ask the data center question, which I\u2019m sure you\u2019ve heard from other people as well, right? This idea that \u2013 we see this Meta one coming and there are other smaller ones, right? I just wonder generally your thoughts on the impact data centers have on our water supply and whether they pose a threat to the sustainability of our water, just generally? And I\u2019ve got a follow up to that, but just kind of in general, how do you think about the impact of data centers on our water supply?<\/p>\n<p>Gilbert: Well, I\u2019m going to be, since it\u2019s a podcast, I\u2019m a little bit more relaxed, Diego. So I\u2019m going to tell you, I\u2019ve never gotten home and then gotten jeered by my own kids. Like, \u201cDad, what are you guys doing?\u201d Because it hits the news and then now I\u2019ve got my kids talking to me about data centers. \u201cWhat are you guys doing?\u201d\u00a0<\/p>\n<p>So, I had to give them as much as I could of the insight to data centers. But you know what? We welcome any business that shares our culture of conservation. I know Meta is a large corporate company, right? It goes without saying, but they do have a culture of conservation. And really, this is true for any industry that we welcome into town or, BorderPlex and the city\u2019s economic development team. They\u2019re all very thoughtful. We all share the culture of conservation here in El Paso, just period.\u00a0<\/p>\n<p>We understand how important it is. And we think, and we welcome everyone that cares so much about the water supply. And we like that our customers and everyone is like, \u201cWait a minute, this goes against everything you guys have been talking about, right? How could you guys allow the data center?\u201d We get it. We think it\u2019s great that people understand and care so much about water here in El Paso. It\u2019s great. But the fact is that, with Meta coming in with their data center, the work and the technical work behind this has been going on for years, like I mentioned.\u00a0<\/p>\n<p>So, someone like Meta just doesn\u2019t come in and say, \u201cHey, let\u2019s put a data center in here for whatever\u201d \u2013 they have their reasons. They\u2019re very thoughtful about it. The first question for any industry that comes into town, water and power, right off the bat, water and power. So these discussions have been going on for a long time.<\/p>\n<p>There are, I\u2019ll refer to them as canon laws here in El Paso about water. It\u2019s precious, it\u2019s preserved, we have all these plans in place, no one is going to come in and just waste it. That\u2019s just, period. And we appreciate, again, BorderPlex and even anytime anyone\u2019s talking to the city economic development team about it, that\u2019s just, it starts there: \u201cWhat is your plan for conservation? What is your plan for not wasting water? What is your plan for recycling water?\u201d And then with all that comes waste streams and how are you going to plan? So, it\u2019s all environmental based.\u00a0<\/p>\n<p>And companies like Meta, they think the same way. Like, their plan is not to go into communities and trash them and take advantage of the resources or anything like that. And that for sure is not the case here in El Paso. So, these discussions have been going on for a long time. And because of that, Meta has gone, I\u2019ll say, above and beyond, as they should, to change their own processes, to change their own cooling systems.\u00a0<\/p>\n<p>They\u2019re, I\u2019ll say, pioneering new cooling systems for data centers, which we pushed their engineers to do because, as with these discussions we\u2019re having, they had to go back to the drawing board and say their typical work plan or design for a data center is not going to work in El Paso.\u00a0<\/p>\n<p>Now, for their own reasons, which I don\u2019t know, frankly, they want to be in El Paso, so they went to the drawing board. They changed their cooling system designs to match what our demand was in terms of \u201cThis is what you could use\u201d in terms of water demand.<\/p>\n<p>Diego: To be more water efficient?\u00a0<\/p>\n<p>Gilbert: Yeah, to be way more water efficient, actually, Because they\u2019ve had, they do have these data centers in other arid places, cities. But we\u2019re a different ballgame here. And our plans are in place. We know what we can handle. We gave this to them. They sharpened their pencils, and they met the mark. And they met the mark, and this is what I told my daughters when they\u2019re holding me accountable at the dinner table as to why this is happening, and how can we let this happen? You know what? They\u2019re doing all the right things. They checked all of our boxes in terms of what our requirements were. And that\u2019s why, and that\u2019s how we got to where we are right now.<\/p>\n<p>Diego: So, you could say, \u201cHey, we can meet this demand fine,\u201d basically?<\/p>\n<p>Gilbert: That\u2019s why they\u2019re here, yes. That is right.<\/p>\n<p>Diego: And just as a follow-up, kind of more broadly, I\u2019ve heard El Paso Water say, basically, from an economic development perspective, like \u201cWe don\u2019t want to be the reason that a business or a private enterprise, a job creator, right, doesn\u2019t come here because of, constraints in water.\u201d\u00a0<\/p>\n<p>And, so, I just wonder, even more broad than data centers, how you think about economic development long-term, right? Like is there \u2013 I mean, I don\u2019t know if there\u2019s some model that says, \u201cHey, we can only accommodate so many industrial operations here going forward\u201d or something, right? But just, like, how does that factor into your water planning in the long run? And thinking about, \u201cHey, we want to bring more employers here and have better jobs and so forth.\u201d How does the water factor into that, I guess?<\/p>\n<p>Gilbert: There\u2019s two parts to that. So, first, it\u2019s the industry itself. So, the industry itself, they\u2019ll run their own economic analysis and financials about going and even wanting to go into a community. They asked themselves the same question, water and power, just right off the bat. So, no industry is going to come to El Paso where they already know they\u2019re big water users. It\u2019s basic, right? Why would they want to do that?\u00a0<\/p>\n<p>So, (companies) or industry that are considering El Paso, they already have \u2013 they understand this, and they for sure understand the culture of conservation that we have here in El Paso. So, that\u2019s their side, right? If they\u2019re already wanting to come to an arid desert community, they have an understanding already, their own business model, about what their water demand should be. They have an idea.\u00a0<\/p>\n<p>Now from our side of it, of course, any industry \u2013 and our role at El Paso Water is not to regulate that at all. Like, we are a utility led by engineers. It\u2019s always been a utility led by engineers and we\u2019re problem-solvers. So, we, when, whether it\u2019s the economic development team at the city, whether it\u2019s a BorderPlex and they ask us, \u201cThis company\u2019s coming, they want to come, can we meet them?\u201d There\u2019s plenty of times where we\u2019ve said no, plenty of times. It\u2019s just not possible.<\/p>\n<p>Diego: If something\u2019s too water intensive?<\/p>\n<p>Gilbert: Yes, we\u2019ve said that, and I\u2019m sure Jon Barela at BorderPlex, he\u2019s part of those discussions. All these folks are part of these discussions. So, plenty of times we\u2019ve said no. And we\u2019re to a point where they are advocates too. They\u2019re advocates for our water supply. I\u2019m talking about BorderPlex and the city\u2019s economic development. I\u2019m like, \u201cNo, they already know.\u201d So, plenty of times we\u2019ve said no to industry.\u00a0<\/p>\n<p>But there\u2019s a lot of times where it\u2019s like, \u201cYeah, this would be great for the city.\u201d The engineer in us kicks in and we go into problem-solving mode. Example Meta: that was it. \u201cHey, these are things that need to happen. Technology\u2019s out there, make it happen.\u201d So it\u2019s very collaborative. It\u2019s a very collaborative process that\u2019s in place right now that the city\u2019s using as a whole in order to bring in industry.\u00a0<\/p>\n<p>So that would be my answer. Like, yeah, it\u2019s not our role to say \u201cno,\u201d but we deal in the world of facts. Like, these are facts. We have plans in place. These are the demands that we can meet. We have a pulse on development all over the city. Population growth, we\u2019re in the business of understanding population trends here in El Paso, too. So, it\u2019s not our role to regulate that in any way. It\u2019s our role to provide it. But there is also like, these baseline rules of, \u201cHey, if you\u2019re going to come, these are flow rates, demands that you\u2019re going to have to meet.\u201d<\/p>\n<p>Diego: And just one more follow up on that. When you say you want businesses or enterprises that embrace conservation, does that mean like, \u201cHey, can you use reclaimed water in your operation?\u201d Or, I guess, is it just, \u201cHey, our usage won\u2019t be above a certain level?\u201d Like, I just wonder if you can talk a little bit more about ways that companies can be sort of more \u2013 err towards conservation, I guess?<\/p>\n<p>Gilbert: Yeah. So, everything from some water recycling, there\u2019s a low-hanging fruit, like your recycle streams, how many times you\u2019re going to recycle it. But then it starts to get into more in-depth technologies about how efficient is there mechanical equipment? Mechanical equipment produces a lot of heat. Now it needs to be cooled down. How are they going to cool down these facilities housing all of these things? It\u2019s the same thing with the data centers. They produce a lot of heat.\u00a0<\/p>\n<p>So, now it goes back to the mechanical side of things. So it\u2019s not just on the water side, but you need water to cool things down. So, on the mechanical side of things and electrical systems, how efficient are they to not produce so much heat? How efficient are they to use \u2013 and I don\u2019t want to geek out and get too technical here \u2013 but how efficient is this piece of equipment that for every unit of energy that goes into it, that you get 98% of production out of that one unit of energy? You\u2019ve got very inefficient pieces of equipment where for one unit of energy, you only get like 70% production out of it. I could see engineers cringing and other people cringing when they\u2019re hearing this because I\u2019m really simplifying it.\u00a0<\/p>\n<p>But it\u2019s efficiencies in mechanical equipment and electrical systems too. That\u2019s culture of conservation, too, because if those things are inefficient, then they need a lot more water. And sure, you\u2019re recycling water, but if you need more of it anyways because your mechanical and electrical systems are inefficient, then you\u2019re still using more water. So, it goes well beyond just the water side of the, I\u2019ll say, their design team. It\u2019s the electricals and the mechanicals, because at the end of the day, it\u2019s about cooling their systems down. It\u2019s not so much about they use water to produce a product. It\u2019s not like a Coca-Cola or something like that. They\u2019re not using water for their product. They\u2019re using water to cool down systems.\u00a0<\/p>\n<p>So, it goes well beyond that. And I think the good thing is, when I talk about Meta having a culture of conservation, is that they\u2019re all about this, too, right? They are for-profit. They\u2019re all about, they\u2019re about the bottom line, too. Like that\u2019s just part of it. They have to be very efficient. That\u2019s part of it. They\u2019re not inefficient in any way. They have brilliant engineers working for them to be efficient in order to, again, maximize and optimize their systems, again, for the betterment of the environment, but also for their bottom line. That\u2019s just the way it is.\u00a0<\/p>\n<p>But they have this culture of conservation, and so do all of these corporate companies, like that\u2019s \u2013 it\u2019s good business, let me say that. It\u2019s good business to have and be a good steward of the environment. And we see that, and that\u2019s another part of this too. Got to be a good steward to the environment. By doing all of these things, they are doing that.<\/p>\n<p>Diego: Yeah, so, I guess if we see more headlines of another data center opening up here or something like that, or other plants to build it, you think that that\u2019s something that you could accommodate? Or you would, before the announcement even comes, you would verify that, \u201cHey, we can accommodate this additional demand?\u201d<\/p>\n<p>Gilbert: For sure, case by case. Case by case. It\u2019s not to say we can accommodate everyone.<\/p>\n<p>Diego: And then, so, just to move on, you mentioned recently that I think El Paso Water has got a capital spending plan basically for the next year of like $750 million, which I think you said was a record for the utility. Just wonder if you can talk about that. It\u2019s kind of \u2013 I think we\u2019re seeing this here and elsewhere, right? This real investment in updating these water and electricity systems that were put in decades ago. Just wonder if you can talk about what\u2019s driving that amount of spending in our water system across the city?<\/p>\n<p>Gilbert: Yeah. So, we talk about the Bustamante project a lot, because that\u2019s \u2013\u00a0<\/p>\n<p>Diego: Which is a wastewater treatment plant.<\/p>\n<p>Gilbert: It\u2019s a wastewater treatment plant. These wastewater treatment plants are super important for the environment, right? Where does all of this wastewater go? Right? So, it gets treated to very high-quality water. It gets released to the environment. So, wastewater treatment plants are a very important part of being a good environmental steward.\u00a0<\/p>\n<p>The Bustamante plant, as the Eastside is growing \u2013 everyone\u2019s been out to the Eastside. If you haven\u2019t, go see the Eastside, it\u2019s like a whole new El Paso out there. It\u2019s growing and that plant needs to be expanded. Now, at the same time, the current Bustamante plant needs upgrades. It needs a facelift, too. Again, not to get too technical, but the type of the wastewater that\u2019s being generated from this booming part of El Paso is of a different type of wastewater. And by that, I mean, now everyone has garbage disposals. And that changes the strength and the characteristics of the wastewater.\u00a0<\/p>\n<p>When we built Bustamante in the \u201990s, the proliferation of garbage disposals wasn\u2019t a thing. And now, I see friends and family, everyone, they just throw everything down the garbage disposal. But that changes the characteristics of the wastewater. So what\u2019s driving the Bustamante plant is largely a regulatory driver. Protection of the environment. If our wastewater plant cannot handle this new type of wastewater that\u2019s being generated because it has a lot more food in it, I refer to it as the strength of the wastewater \u2013 we need to have the ability to clean it. That\u2019s bigger basins, that\u2019s more efficient ways to clean the wastewater. That\u2019s Bustamante in a nutshell.\u00a0<\/p>\n<p>It\u2019s a regulatory-driven project so that we\u2019re not in the news getting fined by the state because our wastewater treatment plant is not meeting permit. This is important, and this is the case. Bustamante is the poster child of this, but this is happening also at the Fred Hervey plant. We\u2019ve had upgrades at the Fred Hervey plant. We\u2019re about to start a major upgrade at the Haskell plant as well. We actually just finished one at Hickerson. Hickerson is the one right off of I-10 and Executive.\u00a0<\/p>\n<p>The wastewater plants as a whole, these are regulatory-driven projects that we, as environmental stewards, we have to get ahead of these things. We can\u2019t wait until \u2013 nor should we \u2013 wait until we\u2019re not meeting our permit, we\u2019re in the news. This is not good. To me, this is not what our customers expect of us. That\u2019s a black eye. We\u2019re failing if we get to that point. So, again, it goes back to planning and we get way ahead of these things.\u00a0<\/p>\n<p>And all these things are happening at the same time as the city grows and this new, stronger wastewater is being generated. We have to react and we get ahead of these things, but they\u2019re all hitting at the same time. And it\u2019s these things that are generating this record capital improvement program like we\u2019ve never had before. They all just tend to hit at the same time.\u00a0<\/p>\n<p>All of these facilities were built roughly between 1985 and 1993, I\u2019ll say. That\u2019s when they were established, built, so they all age at the same time. And as El Paso starts to grow, all these new communities, with not only the garbage disposals, but it goes back really to the culture of conservation. High-efficiency faucets and showers, toilets. So, as the wastewater is getting stronger because, I will say, because of garbage disposal and everyone kind of just throwing everything in there, but then less water is actually a part of that. So, think about the concentration of it. Like there\u2019s less water, OK, more efficient, that\u2019s great. But also this the stronger waste that\u2019s being generated in large part because of garbage disposal and the folks just kind of putting everything down the sink, everything\u2019s hitting at the same time.\u00a0<\/p>\n<p>And I don\u2019t think you\u2019ve probably never heard it this way. Like why are all these plans, why are all these projects happening at the same time? It\u2019s largely regulatory-driven and we need to stay ahead of it so that we can meet our permits. Now throw into that other projects that were planned and now\u2019s the right time to do it. Pure Water Center is one of them. So, there is a project that, again, knowing since 2012 that we needed to do a project by 2030, here we are doing it. Now\u2019s the best time to do it.<\/p>\n<p>Diego: Can you talk about the Pure Water Center just for a minute about what that is exactly and what that will add to the city\u2019s drinking water supply?<\/p>\n<p><img loading=\"lazy\" data-recalc-dims=\"1\" decoding=\"async\" width=\"780\" height=\"442\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2025\/10\/Pure-Water-Center.jpg\" alt=\"\" class=\"wp-image-104448\"  \/>An artist\u2019s rendering of the Pure Water Center, which El Paso Water is building for an innovative reuse process. (Illustration courtesy of El Paso Water)<\/p>\n<p>Gilbert: Yeah, so, Pure Water Center is a new water supply for the city, and we\u2019re going to do it using the ultimate form of water recycling. So, again, what makes this project so exciting is we\u2019re going to use all our local water supply, again, all the water supply that we spend money in pumping, producing, treating in the terms of our two aquifers, when we have river water, the Kay Bailey Hutchison plant, all that water gets used and becomes a wastewater. It\u2019s a local supply. It\u2019s here. We don\u2019t need to import it. We don\u2019t need to pump it. We don\u2019t do anything. It comes to our facility now.\u00a0<\/p>\n<p>We\u2019re simply going to use several advanced treatment processes to make drinking water out of that, but it\u2019s going to go straight into the distribution system. So, this is a unique first of its kind in the country, for sure. And at this size, I\u2019ll venture to say the world, that we\u2019re taking this ultimate form of water recycling. It\u2019s sustainable. It\u2019s drought-proof. All this wastewater is being generated every single day by our customers. We don\u2019t have to, like I mentioned, build importation pipelines or anything like that.\u00a0<\/p>\n<p>I\u2019ll say it\u2019s the most cost efficient way to produce a new water supply. And we\u2019re doing it because the technology is available. It\u2019s safe, just period. It\u2019s safe to do it. We\u2019ll be using reverse osmosis, UV, ultraviolet light, still using activated carbon, chlorine. Like, this water is going to be the highest treated water we can produce, but it checks all the boxes. It checks all the boxes in terms of sustainability, financially the right thing to do. It\u2019s a great project for the city and it produces 10 million gallons of drinking water per day for our customers, all from our current sources. And I think that\u2019s a really cool part about it.<\/p>\n<p>Diego: Just one more question on this. Do you think we could see other cities see how it goes in El Paso and then potentially adopt this direct potable reuse technology?<\/p>\n<p>Gilbert: Yes, I do. I think that it\u2019s the perception, and I think that the perception in communities that are ready to take this step into water recycling \u2013 because it\u2019s a perception issue. It\u2019s not a technology issue. We can and will produce the safest water from this Pure Water Center because of all the treatment that it\u2019s going to go through. The perception of, \u201cWell, we\u2019re going to drink our own wastewater.\u201d Like some communities are just not ready for that. I\u2019ll say even sophisticated enough to take this ultimate step in water recycling. It really is a level of sophistication in terms of understanding water supply, understanding treatment, trusting your local water utility.\u00a0<\/p>\n<p>The communities that have that are ready to do this. And I think once they see a city the size of El Paso do it, the confidence is going to grow and everyone will say \u201cMan, that\u2019s a really big city, booming city, filled with a lot of really smart people. If they\u2019re doing it, we can do it, too.\u201d<\/p>\n<p>Diego: Yeah. And on the capital improvement or capital spending question, can you just talk about the stormwater aspect of that? I think there\u2019s quite a bit of investment there too. And we had kind of a rainy season and heard a lot of complaints about flooding and things like that around the city, which I\u2019m sure you\u2019re more familiar with than me. But just wondering if you can kind of touch on how much the utility is investing and maybe some of the big projects as far as stormwater and flood prevention?<\/p>\n<p>Gilbert: Yeah. So, the biggest challenge is \u2013 so, a lot of successes with stormwater right now. So, we had a very active monsoon season. We got to see a lot of the projects that we\u2019ve completed all over town work very successfully. Now with that, we do understand \u2013 I can hear customers saying, \u201cYeah, but I still flood on my street.\u201d There\u2019s still some work to be done. And the plan is still in place to get to parts of the city that require these really large projects.\u00a0<\/p>\n<p><a href=\"https:\/\/elpasomatters.org\/2025\/07\/18\/el-paso-water-flash-flooding-rain-weather-clima\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">LEARN MORE: Podcast: More on flash flooding in El Paso, how water utility tries to manage stormwater<\/a><\/p>\n<p>So, right now, in terms of the stormwater capital improvements program, the Will Ruth project is well on its way. It\u2019s an amazing construction site to go see. If you haven\u2019t seen it, Diego, it\u2019s huge. And we always knew it was going to be large, but when you start to realize it, is quite impressive.<\/p>\n<p>Diego: There in Northeast El Paso?<\/p>\n<p><img loading=\"lazy\" data-recalc-dims=\"1\" decoding=\"async\" width=\"780\" height=\"520\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2025\/10\/IMG_6591.jpg\" alt=\"\" class=\"wp-image-104593\"  \/>El Paso Water recently began work on the Will Ruth Pond in Northeast El Paso. It\u2019s designed to limit flooding by storing up to 100 million gallons of stormwater. (Diego Mendoza-Moyers \/ El Paso Matters) <\/p>\n<p>Gilbert: There in Northeast El Paso, yes. Which is going to take hundreds, I think we may even reach thousands of homes out of the floodplain, which is why these projects are being done. You talk about prioritization of stormwater projects. Why does some part of the city get a big project, but over in my part of town it hasn\u2019t? It\u2019s not that we\u2019re not going to get there. It\u2019s a matter of, you know, when we prioritize our projects, we\u2019re looking at maximum impact per dollar. So, we refer to it as benefit-to-cost. This is a strategy that FEMA uses, and it\u2019s used widely throughout really in engineering practice, what\u2019s going to get the biggest benefit for the community for the cost.\u00a0<\/p>\n<p>So, projects like Will Ruth will do that. Projects that we\u2019ve done in the past have done that. The Palisades Dam, we\u2019re building three new dams up on the Palisades Canyon right there off of Robinson. That\u2019s going to provide a lot of protection for the Billy Rogers Arroyo and all that community downstream, including UTEP. I think no one will argue we have to protect UTEP from a large flooding event up there in the Palisades Canyon. So, this is how we prioritize projects. A lot of successes, a lot of work to go.\u00a0<\/p>\n<p>But one of the biggest challenges with stormwater is the revenue. And by that I mean what we charge our customers. So, we still get quite a bit of folks, I think, not understanding why we need the stormwater fee, the importance of it. But the maintenance of everything that\u2019s there now is number one. Like, what we have now needs to work when it rains. But then there\u2019s additional projects that we need to build as well to protect communities and neighborhoods out there.<\/p>\n<p>Diego: So, I guess I\u2019m curious your thoughts on the impact on customer bills of all of this capital spending. And I know El Paso Water is about to go through the budget season, so I know nothing\u2019s set. But would your message to customers be, \u201cHey, there probably will be some increase in bills as a result of all the spending,\u201d but maybe there will be increases in the quality of service? I just wonder what you would tell customers about that. \u201cHey, we\u2019re spending all this money, but you\u2019re getting something out of it,\u201d right?<\/p>\n<p>Gilbert: So, you\u2019re right about that. So, for sure, they\u2019re going to see better service. They will see their level of service that they have now. The level of service will stay or improve, I think will improve. That\u2019s a big part of it. The reliability of the system, right?\u00a0<\/p>\n<p>So, folks don\u2019t think about water. They just want water to come out when they turn the faucet. When they flush the toilet, they want to see it disappear. There\u2019s a lot of work that goes into that. And we have to do all of these projects to ensure that we stay there, because the one time that people turn their faucets and there\u2019s no pressure or there\u2019s no water, they\u2019re up in arms, rightfully so. The level of service and reliability of our system is expected to be at the highest. 100%, I\u2019ll say 99.99%, as many nines as you want. It needs to be up all the time. And there\u2019s a lot of work that goes into that. And we have to be very proactive in doing that. And it\u2019s reinvestment of money into existing systems.\u00a0<\/p>\n<p>So, it\u2019s not just the growing parts, but a lot of our system every day gets older and older and older. And every customer is important to us. It doesn\u2019t matter what part of time you\u2019re in. Parts of town, some parts of town are older than others, obviously, and a lot of money needs to get invested into that, and we need to stay ahead of that. So, yes, with all of this planning of construction to maintain the level of service so that customers can not think about their water, because that\u2019s really the goal. They just want to know that they always have water in good pressure. There\u2019s a lot that goes into that.\u00a0<\/p>\n<p>We have to stay ahead of it. And yes, with that comes increase in our own staffing, increase in our own abilities, increase in infrastructure. It\u2019s not just the infrastructure, it\u2019s our own staff that we have to invest in as well to have the best engineers, the best scientists, the best accountants, the best customer service reps. Our guys in the field who are in the blue trucks, out there in the hole, fixing the broken pipes, they don\u2019t get enough credit in terms of what they do every day. Working overnight, cold conditions, hot conditions to make sure people can have water as soon as possible. There\u2019s a lot that goes into that.\u00a0<\/p>\n<p>So, yes, people can expect their bills to be impacted by that. And we\u2019re very transparent with that. Every budget that is adopted by the Public Service Board comes with a five-year financial plan. Now, that doesn\u2019t set the rates for five years, but it just shows based on everything that needs to be done to maintain this level of services for our customers, this is what the financial plan looks like, and these are associated rates. And every year, each Public Service Board reevaluates it every time, and then they set the actual rate. So, yeah, I think we\u2019re very transparent with the rate, our financial plans, how that affects the rates. But yes, our Public Service Board will be presented with our proposal for the budget next month in November. And again, every Public Service Board every year entertains their own \u2013 make decisions, set the rate, and off we go.<\/p>\n<p>Diego: Just one more question on that. Long-term, right, El Paso Water has implemented several rate increases. And, I mean, you\u2019ve laid out a lot of the projects, and so it makes sense, right? We\u2019re upgrading our systems and improving and expanding and so forth. In the long run, is there a concern from El Paso Waters\u2019 perspective, \u201cHey, maybe, bills get unaffordable relative to median income in El Paso?\u201d I just wonder how you think about the sustainability of the rate increases and the ability of El Pasoans to absorb them? Recognizing we want to have a reliable and good water system, right?\u00a0<\/p>\n<p>I just wonder how you kind of think about the long-term kind of outlook there as far as rate increases and affordability and all that?<\/p>\n<p>Gilbert: So, yes, we are concerned about it, and it\u2019s something that remains every day in all of our conversations, affordability. It\u2019s for these reasons that we\u2019ve developed, over the last couple years, this menu of affordability options. So, we\u2019re manipulating the rate model, the financial models that we have. We\u2019re manipulating them so that customers that use the least amount of water pay the least. That only makes sense.\u00a0<\/p>\n<p>So, when we talk about our menu of affordability options, that\u2019s what we\u2019re talking about. We want to recognize the folks that are doing their part in using the least amount of water, which also translates to be the folks that have fixed incomes. So, either these are folks with fixed incomes, retired folks, folks that are on tough times, they\u2019re already doing everything possible just naturally to live minimalistically, I\u2019ll say.\u00a0<\/p>\n<p>So, we want to recognize that with our rates. And if you use ultra-low amounts of water, if you use low amounts of water, the rates now reflect that and they will pay much lesser amounts of water. Now I say that, but rates and what it costs us to produce our services, our water treatment, conveyance, and all that, it\u2019s a zero-sum game. Like it costs us \u2013 and we can only, by state law, we can only charge folks what it costs us to provide them service. We are not-for-profit. And I hope that\u2019s clear. I don\u2019t know if folks, if we get lumped in with other utilities, we are not-for-profit.<\/p>\n<p>Diego: City-owned utility.<\/p>\n<p>Gilbert: Yes, we are city-owned. The money that we gained from our customers\u2019 bills, all of that goes back into the system. There is no profit here at all. Everything goes back to cost of service. So, that amount is fixed. So, as we\u2019re charging less to folks that use very low amounts of water, while the rest of it will get absorbed by people who use more water. And, so, they\u2019ll see a larger increase when we do these types of things. And I know it can get a little complicated, but that\u2019s a zero-sum game. We just want to reward folks to help with affordability matters. If you use a little bit of water, ultra-low flow amounts of water, we want to recognize that they should pay the least amount for their water.<\/p>\n<p>Diego: Yeah. And just kind of a pet issue of mine, I\u2019ll mention quickly, is that City Council really declined an <a href=\"https:\/\/elpasomatters.org\/2024\/04\/30\/el-paso-city-council-water-impact-fees-urban-sprawl\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">opportunity to raise impact fees<\/a>. Which are these costs that, basically, home builders that are sort of creating some of the costs and demand on the outskirts of the city \u2013 I think the amount they pay the utility to extend water and sewer lines isn\u2019t really the actual cost.<\/p>\n<p><a href=\"https:\/\/elpasomatters.org\/2024\/04\/30\/el-paso-city-council-water-impact-fees-urban-sprawl\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">LEARN MORE: El Paso Water service in new neighborhoods could cost $1 billion over 10 years. Who should shoulder the cost?<\/a><\/p>\n<p>And, so I \u2013 that\u2019s kind of a pet issue of mine that I\u2019m not really asking a question, but it\u2019s just something that I thought City Council could have taken an opportunity to make some of the entities causing the growth and increasing demand sort of pay more of the cost so the rest of ratepayers don\u2019t.\u00a0<\/p>\n<p>Anyways, we\u2019ll wrap up here, Gilbert. Just one more question. I think next week Texas voters will vote on a bunch of propositions that are very wide-ranging. One of them has to do with water. I think it would set up, basically, or would allocate $20 billion in state funds for water supply projects around the state.\u00a0<\/p>\n<p><a href=\"https:\/\/elpasomatters.org\/2025\/10\/17\/el-paso-texas-2025-election-water-crisis\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">ELECTION: Texas voters have final say on $20 billion package to secure state\u2019s water supply<\/a><\/p>\n<p>I think half would be to fix water infrastructure and leaky pipes and so forth and the other half would be to create new water supply projects. And, so, I just wonder if you can talk about this proposition, how it might affect El Paso and our water situation here? And I know you can\u2019t advocate one way or another. But just wonder if generally you can offer any thoughts on the potential impact on El Paso of having this big pot of money essentially for water projects across the state?<\/p>\n<p>Gilbert: Well, so what it\u2019s going to do for El Paso, it\u2019ll give us a chance to compete for these funds, just plain and simple. So, as we are executing our playbook of additional water supply, of rehabilitation of existing infrastructure, this platform will allow us to compete for these funds. It would be an additional funding source. And yeah, that\u2019s what Prop 4 does. I think El Pasoans, I think they\u2019ll just know that it\u2019ll give us another chance as a community to actively compete for an additional source of funds if this is approved by the voters.<\/p>\n<p>Diego: Yeah. So, basically, if we go approve it, it\u2019s like, \u201cHey, El Paso Water can apply for various projects you have and maybe get some state funds toward it, maybe not.\u201d That\u2019s basically what it means for El Paso?\u00a0<\/p>\n<p>Gilbert. Correct.\u00a0<\/p>\n<p>Diego: Yeah. Cool. Well, this has been a good conversation. I appreciate you fielding all these questions and taking some time and just sharing some thoughts on the water situation in El Paso. I think it\u2019s a thing at the top of mind for a lot of people. So, I appreciate you talking with me about it.<\/p>\n<p>Gilbert: It\u2019s my pleasure, Diego. And again, we appreciate you bringing to light water issues. We want to talk about these because if we don\u2019t, then, different narratives and falsehoods are going to be spread. So, anytime you want to talk about anything water, you can count on us.<\/p>\n<p>Diego: Sounds good. Thanks.<\/p>\n<p>Related<\/p>\n<p>LISTEN: EL PASO MATTERS PODCAST<\/p>\n","protected":false},"excerpt":{"rendered":"Water supply, data centers and customer bills. A discussion with El Paso Water Diego Mendoza-Moyers: Today, let\u2019s talk&hellip;\n","protected":false},"author":2,"featured_media":28700,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12],"tags":[138,140,139,5768],"class_list":["post-28699","post","type-post","status-publish","format-standard","has-post-thumbnail","category-el-paso","tag-el-paso","tag-el-paso-headlines","tag-el-paso-news","tag-el-paso-water"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/28699","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=28699"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/28699\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/28700"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=28699"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=28699"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=28699"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}