{"id":304650,"date":"2026-05-22T15:23:21","date_gmt":"2026-05-22T15:23:21","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/304650\/"},"modified":"2026-05-22T15:23:21","modified_gmt":"2026-05-22T15:23:21","slug":"texas-powers-past-virginia-in-global-data-center-rankings","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/304650\/","title":{"rendered":"Texas Powers Past Virginia in Global Data Center Rankings"},"content":{"rendered":"<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">Dallas has overtaken Northern Virginia as the world\u2019s top primary data center market, according to Cushman &amp; Wakefield\u2019s latest Global Data Center Market Comparison report, reflecting how AI infrastructure demand is rewiring where large-scale digital infrastructure gets built.<\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">The report ranked Dallas as the No. 1 primary data center market globally, followed by Atlanta, Virginia, Columbus, and Johor. Austin-San Antonio and West Texas lead the secondary and tertiary market rankings, reinforcing Texas\u2019s widening grip on AI infrastructure expansion.<\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">\u201cPower delivery timelines, land availability, community sentiment, and regulation are now playing a much larger role in determining where and how data centers get built,\u201d John McWilliams, head of data center insights at Cushman &amp; Wakefield, said in the report announcement.<\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">Industry analysts say the shift reflects a broader change in how AI infrastructure gets deployed.<\/p>\n<p data-component=\"related-article\" class=\"RelatedArticle\">Related:<a class=\"RelatedArticle-RelatedContent\" href=\"https:\/\/www.datacenterknowledge.com\/energy-power-supply\/gridlock-or-growth-ercot-warns-texas-ai-power-boom-may-not-materialize\" target=\"_self\" data-discover=\"true\" rel=\"nofollow noopener\">Gridlock or Growth? ERCOT Warns Texas AI Power Boom May Not Materialize<\/a><\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">\u201cPower availability has decisively overtaken latency as the dominant site-selection variable for AI-centric capacity,\u201d said Alex Cordovil, research director at Dell\u2019Oro Group. \u201cThe scale of new campuses \u2014 often 500 MW to multiple gigawatts \u2014 means power becomes the gating factor.\u201d<\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">Cushman &amp; Wakefield notes capacity under construction reached nearly 31.7 GW in 2025, more than double the 12.5 GW reported in the prior edition of the study. The study examined 107 global markets using 24 variables across power infrastructure, commercial real estate conditions, regulation, and development activity.<\/p>\n<p>Texas Expands Beyond Dallas<\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\"><a class=\"ContentText-BodyTextChunk ContentText-BodyTextChunk_link\" href=\"https:\/\/www.datacenterknowledge.com\/data-center-site-selection\/hyperscale-growth-shifts-inland-as-ai-drives-power-demand\" target=\"_self\" data-discover=\"true\" rel=\"nofollow noopener\">Texas\u2019s rise<\/a> spans multiple layers of the infrastructure stack. Dallas continues to draw hyperscale and colocation growth tied to cloud and AI deployments. Momentum is also accelerating in Austin-San Antonio and West Texas, where operators see fewer infrastructure bottlenecks, larger land parcels, and <a class=\"ContentText-BodyTextChunk ContentText-BodyTextChunk_link\" href=\"https:\/\/www.datacenterknowledge.com\/energy-power-supply\/speed-to-power-how-developers-are-restructuring-for-ai-demand\" target=\"_self\" data-discover=\"true\" rel=\"nofollow noopener\">faster paths to energized capacity<\/a>.<\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">Cordovil said the pattern is spreading well beyond Texas as developers search for regions with available power and faster utility access.<\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">\u201cSecondary markets are structurally benefiting,\u201d Cordovil said, pointing to regions including West Texas, central Ohio, Wisconsin, the Nordics, and the Iberian peninsula.<\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">That shift has played out repeatedly across recent projects. OpenAI, Oracle, and SoftBank\u2019s Stargate initiative in <a class=\"ContentText-BodyTextChunk ContentText-BodyTextChunk_link\" href=\"https:\/\/www.datacenterknowledge.com\/build-design\/crusoe-expands-abilene-ai-campus-with-new-900mw-ai-factory-for-microsoft\" target=\"_self\" data-discover=\"true\" rel=\"nofollow noopener\">Abilene<\/a> helped push West Texas into the center of the AI infrastructure conversation. Meta significantly scaled its <a class=\"ContentText-BodyTextChunk ContentText-BodyTextChunk_link\" href=\"https:\/\/www.datacenterknowledge.com\/data-center-construction\/meta-building-new-gigawatt-sized-data-center-in-texas\" target=\"_self\" data-discover=\"true\" rel=\"nofollow noopener\">El Paso plans<\/a>. Google pledged an additional $40 billion in US infrastructure investment, including major Texas operations. Soluna continued pitching West Texas as a destination for power-intensive AI workloads tied to stranded and renewable energy resources.<\/p>\n<p data-component=\"related-article\" class=\"RelatedArticle\">Related:<a class=\"RelatedArticle-RelatedContent\" href=\"https:\/\/www.datacenterknowledge.com\/energy-power-supply\/the-breaking-points-power-emerges-as-ai-s-defining-limit\" target=\"_self\" data-discover=\"true\" rel=\"nofollow noopener\">The Breaking Points: Power Emerges as AI\u2019s Defining Limit<\/a><\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">Together, the projects point to a broader industry migration already underway: AI infrastructure increasingly flows toward regions that can still assemble land, transmission access, and generation capacity at an industrial scale.<\/p>\n<p>Power Becomes the Constraint<\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">The report\u2019s power delivery data underscores why.<\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">Cushman found average power delivery timelines for large-load projects now stretch to roughly five years across the Americas and EMEA. In the Asia-Pacific region, the average timeline sits closer to 2.7 years.<\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">Developers are responding with power-from-the-land strategies, <a class=\"ContentText-BodyTextChunk ContentText-BodyTextChunk_link\" href=\"https:\/\/www.datacenterknowledge.com\/build-design\/unconventional-texas-data-center-explores-off-grid-power\" target=\"_self\" data-discover=\"true\" rel=\"nofollow noopener\">onsite or private generation<\/a>, and expansion into secondary and tertiary markets where utility constraints remain less severe.<\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">Cushman\u2019s findings also mirror growing efforts by operators to work around long utility interconnection queues.<\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">\u201cMulti-year queues for large-load connections have driven a clear shift toward bring-your-own-power strategies, including on-site generation and behind-the-meter arrangements,\u201d Cordovil said. \u201cThe AI buildout will not wait for utilities.\u201d<\/p>\n<p>Room to Scale<\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">Northern Virginia remains the industry\u2019s largest market by operational scale, but years of hyperscale growth have tightened utility coordination, transmission planning, and available capacity. Similar pressures are mounting in Frankfurt, London, Amsterdam, and Dublin.<\/p>\n<p data-component=\"related-article\" class=\"RelatedArticle\">Related:<a class=\"RelatedArticle-RelatedContent\" href=\"https:\/\/www.datacenterknowledge.com\/regulations\/oklahoma-law-opens-new-front-in-ai-data-center-power-fight\" target=\"_self\" data-discover=\"true\" rel=\"nofollow noopener\">Oklahoma Law Opens New Front in AI Data Center Power Debate<\/a><\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">Texas, by contrast, still offers room to sprawl. ERCOT\u2019s independent grid structure, large generation pipeline, expansive transmission buildout, and abundant developable land give operators one of the few places where multi-gigawatt AI expansion still looks achievable on a realistic timeline.<\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">In the AI era, the markets winning new deployments increasingly look like the ones that can energize them first.<\/p>\n","protected":false},"excerpt":{"rendered":"Dallas has overtaken Northern Virginia as the world\u2019s top primary data center market, according to Cushman &amp; Wakefield\u2019s&hellip;\n","protected":false},"author":2,"featured_media":304651,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[27,29,28],"class_list":["post-304650","post","type-post","status-publish","format-standard","has-post-thumbnail","category-texas","tag-texas","tag-texas-headlines","tag-texas-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/304650","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=304650"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/304650\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/304651"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=304650"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=304650"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=304650"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}