{"id":327487,"date":"2026-06-08T13:13:24","date_gmt":"2026-06-08T13:13:24","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/327487\/"},"modified":"2026-06-08T13:13:24","modified_gmt":"2026-06-08T13:13:24","slug":"what-is-a-data-center-why-texas-and-dallas-are-ranked-no-1","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/327487\/","title":{"rendered":"What is a data center? Why Texas and Dallas are ranked No. 1"},"content":{"rendered":"<p><img alt=\"As data centers continue to pop-up around Texas and the Dallas-Fort Worth region, some experts weighed in on their water and energy consumption.\" loading=\"eager\" fetchpriority=\"high\"   style=\"aspect-ratio:3 \/ 2\" class=\"x100 y100 opc bgpc ofcv bgscv block bg-gray200 mnh0px fill\"\/><\/p>\n<p>As data centers continue to pop-up around Texas and the Dallas-Fort Worth region, some experts weighed in on their water and energy consumption.<\/p>\n<p>tom-fox<\/p>\n<p>Dallas-Fort Worth is a hotspot of the country\u2019s data center boom.\u00a0<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/cdn-channels-pixel.ex.co\/events\/0012000001fxZm9AAE?integrationType=DEFAULT&amp;template=design%2Farticle%2Fplatypus_two_column.tpl\" alt=\"\" class=\"x1px y1px vh abs\" aria-hidden=\"true\" width=\"1\" height=\"1\"\/><\/p>\n<p>In May, a <a href=\"https:\/\/cts.businesswire.com\/ct\/CT?id=smartlink&amp;url=https%3A%2F%2Fdigital.cushmanwakefield.com%2Fglobaldatacentermarketcomparison-05-2026-global-central-en-content-mrsrch-datacentres%2F&amp;esheet=54538839&amp;newsitemid=20260520183490&amp;lan=en-US&amp;anchor=found+here&amp;index=1&amp;md5=870991bca192a1f0c78718d5f8f7c7bc&amp;_gl=1*z9xqgj*_gcl_au*MTgyMDUzMTk5My4xNzc5MzAxMTA1*_ga*NjAwNjg3NDcwLjE3NzkzMDExMDU.*_ga_ZQWF70T3FK*czE3NzkzMDExMDQkbzEkZzAkdDE3NzkzMDExMDUkajU5JGwwJGgw\" data-link=\"native\" rel=\"noopener nofollow\" target=\"_blank\" class=\"\">report <\/a>from real estate firm Cushman &amp; Wakefield <a href=\"https:\/\/www.dallasnews.com\/business\/energy\/article\/dallas-top-primary-data-center-market-22268890.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">named<\/a> Dallas the No. 1 primary data center market in the world, stating these centers powering the internet are flocking to Texas to take advantage of the state\u2019s pro-business attitude, independent and deregulated power grid and abundance of land.\u00a0<\/p>\n<p>Texas has an estimated 465 data centers, with 184 operating in Dallas-Fort Worth, the state\u2019s largest hub by a significant margin, according to data from <a href=\"https:\/\/www.datacentermap.com\/usa\/texas\/\" data-link=\"native\" rel=\"noopener nofollow\" target=\"_blank\" class=\"\">Data Center Map.<\/a><\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>But what is a data center, and how do the water and energy consumption necessary to operate them impact Texas? Here\u2019s what to know.<\/p>\n<p>Related: <a href=\"https:\/\/www.dallasnews.com\/business\/energy\/article\/dallas-top-primary-data-center-market-22268890.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">Dallas ranks No. 1 primary data center market globally, surpassing Atlanta, Virginia<\/a><\/p>\n<p>\nWhat is a data center?\u00a0\n<\/p>\n<p>Although the explosion of AI in recent years has brought data centers into the spotlight, they existed long before, housing servers which store the\u00a0internet\u2019s data.\u00a0<\/p>\n<p>Raul Martynek, CEO of Dallas-based company DataBank,previously <a href=\"https:\/\/www.dallasnews.com\/business\/energy\/2025\/10\/31\/databank-ceo-dallas-poised-to-be-the-nations-leading-location-for-data-center-capacity\/\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">told <\/a>The Dallas Morning News he first heard of data centers in the late 1990s when computer technology companies such as IBM needed data processing locations. Office spaces, he said, had \u201ccomputer closets\u201d where servers and other tech were stored. With the internet came the introduction of centralized locations making up cloud\u00a0storage to replace in-office and home storage.\u00a0<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>Related: <a href=\"https:\/\/www.dallasnews.com\/business\/energy\/2025\/10\/31\/databank-ceo-dallas-poised-to-be-the-nations-leading-location-for-data-center-capacity\/\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">DataBank CEO: Dallas poised to be the nation&#8217;s leading location for data center capacity<\/a><\/p>\n<p>Now, these centers power \u201ceverything that we do every day,\u201d says Dan Diorio, the vice president for state policy at the Data Center Coalition, the industry\u2019s membership organization whose members include Google, Anthropic, OpenAI and NTT Data.\u00a0<\/p>\n<p>\u201cThey are an indispensable part of our everyday lives,\u201d Diorio said, adding that everything from making online purchases to reading online news articles requires the digital infrastructure of data centers. He explained one common misconception is that data centers solely power artificial intelligence, when really, phones, computers and even smart home appliances with internet capabilities require the digital infrastructure to store information and complete processing.\u00a0<\/p>\n<p>Are there data centers in Dallas?<\/p>\n<p>NTT Data, the third-largest data center provider in the world, holds a 42-acre <a href=\"https:\/\/www.dallasnews.com\/business\/energy\/2025\/09\/28\/dallas-fort-worth-is-a-leading-data-center-market-with-a-significant-scale-issue\/\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">campus <\/a>in Garland with three data centers and a fourth one on the way.\u00a0<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>Smaller data centers also exist throughout North Texas, with some even right in downtown Dallas office buildings. Carrier hotels, as they are classified, are buildings which house cloud services and networks, The News previously reported.\u00a0<\/p>\n<p>There are a number of massive AI data centers in Texas. OpenAI, Oracle and SoftBank joined forces for the Stargate Project, <a href=\"https:\/\/www.dallasnews.com\/business\/energy\/2025\/09\/23\/inside-stargate-ais-massive-texas-data-center-campus-with-5-more-sites-announced\/\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">constructing <\/a>a campus of centers in Abilene to support AI. Oracle previously told The News this campus will provide OpenAI with the largest supercluster in the world.\u00a0<\/p>\n<p>Related: <a href=\"https:\/\/www.dallasnews.com\/business\/energy\/2025\/09\/23\/inside-stargate-ais-massive-texas-data-center-campus-with-5-more-sites-announced\/.\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">Inside Stargate AI&#8217;s massive Texas data center campus, with 5 more sites announced\u00a0<\/a><\/p>\n<p>Related: <a href=\"https:\/\/www.dallasnews.com\/news\/environment\/article\/dallas-lacks-zoning-policy-tailored-data-centers-22230881.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">Dallas at a crossroads on data center policy amid regional boom<\/a>\u00a0<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>Why are there so many data centers in Texas?\u00a0<\/p>\n<p>Though Dallas has been ranked the top data center market, it has yet to surpass Virginia in terms of the number of data centers. Texas is set to do so by 2030, becoming the world\u2019s largest data center market, per reports by<a href=\"https:\/\/www.jll.com\/en-us\/newsroom\/jll-north-america-data-center-report-year-end-2025\" data-link=\"native\" rel=\"noopener nofollow\" target=\"_blank\" class=\"\"> JLL.<\/a>\u00a0<\/p>\n<p>Diorio explained that Texas\u2019 eagerness to welcome infrastructure, available land, workforce and existing tech ecosystem\u00a0put the state on the map as a leading market.\u00a0<\/p>\n<p>Related: <a href=\"https:\/\/www.dallasnews.com\/business\/energy\/2025\/09\/28\/dallas-fort-worth-is-a-leading-data-center-market-with-a-significant-scale-issue\/\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">Dallas-Fort Worth is a leading data center market with a &#8216;significant scale issue&#8217;<\/a><\/p>\n<p>How much energy do data centers use?\u00a0<\/p>\n<p>Powering data centers\u2019 computer systems and technology infrastructure takes a significant amount of energy.\u00a0<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>Some of the largest single facilities require up to two-thirds the amount of the 3,000 megawatts of energy it takes to power the city of Fort Worth, Geoffery Bailey, VP of corporate strategy for Oncor Electric Delivery, previously <a href=\"https:\/\/www.dallasnews.com\/business\/energy\/2025\/09\/28\/dallas-fort-worth-is-a-leading-data-center-market-with-a-significant-scale-issue\/\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">told <\/a>The News.\u00a0<\/p>\n<p>According to Bailey, the average data center now requires 700 to 800 megawatts of power.\u00a0<\/p>\n<p><a href=\"https:\/\/www.dallasnews.com\/business\/energy\/2025\/09\/28\/dallas-fort-worth-is-a-leading-data-center-market-with-a-significant-scale-issue\/\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">In 2025, <\/a>The News reported the U.S. Energy Information Administration had predicted that large-scale computing facilities, including data centers and cryptocurrency mining operations, could total 54 billion kilowatthours that year, rising 60% from expected demand in 2024.\u00a0<\/p>\n<p>Now, the U.S. Energy Information Administration is <a href=\"https:\/\/www.eia.gov\/todayinenergy\/detail.php?id=67704\" data-link=\"native\" rel=\"noopener nofollow\" target=\"_blank\" class=\"\">predicting <\/a>that nationwide energy consumption for data center computing could reach between 446 and 818 billion kilowatthours by 2050.\u00a0<\/p>\n<p>The amount of energy data centers use is predicted to grow rapidly. The Electric Reliability Council of Texas, which oversees Texas\u2019 electricity grid, is forecasting that peak electricity demand from homes and businesses, including data centers,\u00a0could jump 70% by 2031, the Houston Chronicle<a href=\"https:\/\/www.houstonchronicle.com\/projects\/2026\/texas-water-electricity-data-center-boom\/\" data-link=\"native\" rel=\"noopener nofollow\" target=\"_blank\" class=\"\"> reported<\/a>.\u00a0<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>Diorio said data centers\u2019 energy consumption is comparable to other large industrial users.\u00a0<\/p>\n<p>He also noted a steep demand curve for the services of data centers is driving growth, pointing to a Visual Capitalist <a href=\"https:\/\/www.visualcapitalist.com\/shortage-of-u-s-data-center-capacity-2023-2028p\/\" data-link=\"native\" rel=\"noopener nofollow\" target=\"_blank\" class=\"\">report <\/a>detailing a 10-gigawatt shortfall between demand for digital infrastructure and current capacity.\u00a0<\/p>\n<p>Why does this energy use matter?\u00a0<\/p>\n<p>Luke Metzger is the executive director of Environment Texas, an advocacy organization whose mission is to protect the natural world, working at the local, state and federal levels.\u00a0<\/p>\n<p>He explained the amount of energy data centers require\u00a0exceeds the capacity of current infrastructure. Given the strain on Texas\u2019 resources, Metzger said the state should cease encouraging the development of new data centers.<\/p>\n<p>He cited information from the Environmental Integrity Project, an environmental nonprofit, <a href=\"https:\/\/environmentalintegrity.org\/news\/wave-of-130-tx-gas-power-plant-projects-could-emit-the-climate-pollution-of-27-million-cars\/\" data-link=\"native\" rel=\"noopener nofollow\" target=\"_blank\" class=\"\">estimating <\/a>that building all of the power plants proposed to support Texas data centers would be the climate equivalent of adding 27 million cars to Texas roads.\u00a0<\/p>\n<p>Metzger worries the energy needs of the state\u2019s ever-increasing number of data centers will be met by new gas burning power plants and diesel generators, contributing further to environmental concerns.\u00a0<\/p>\n<p>He suggests data centers be required to use clean energy such as wind, solar and batteries to avoid carbon impacts.\u00a0<\/p>\n<p>Metzger also said Environment Texas suggests data center development projects fund energy efficiency programs to offset their energy use, as there is a pressing need in Texas for support in upgrading inefficient heating systems for residents.\u00a0<\/p>\n<p>The Texas electricity <a href=\"https:\/\/www.dallasnews.com\/topic\/ercot\/\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">grid <\/a>operates <a href=\"https:\/\/www.dallasnews.com\/news\/curious-texas\/2021\/02\/16\/how-did-texas-wind-up-on-its-own-electrical-grid-curious-texas-investigates\/\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">independently<\/a>, meaning it avoids federal regulation, making it easier for data centers to connect to the grid in light of less regulation.\u00a0<\/p>\n<p>This doesn\u2019t mean data centers\u2019 electricity use goes entirely unchecked, though. Texas Senate Bill 6 enables state regulators to enact a \u201c<a href=\"https:\/\/www.dallasnews.com\/news\/politics\/2025\/05\/26\/ercot-would-get-a-kill-switch-for-large-consumers-under-bill-tentatively-passed-in-house\/\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">kill switch<\/a>\u201d for large energy users on the grid during emergencies.\u00a0<\/p>\n<p>How much water do data centers use?\u00a0<\/p>\n<p>The same Cushman &amp; Wakefield report naming Dallas the No. 1 primary data center in the market noted that growing concerns over water availability in Texas threaten the industry.\u00a0<\/p>\n<p>A 2024 research <a href=\"https:\/\/environmentamerica.org\/texas\/center\/articles\/data-centers-pose-energy-challenge-for-texas\/\" data-link=\"native\" rel=\"noopener nofollow\" target=\"_blank\" class=\"\">report <\/a>from Environment Texas indicated that data center demands for\u00a0AI could be responsible for the withdrawal of more than 2.4 million Olympic-sized swimming pools of freshwater in 2027.<\/p>\n<p>A new <a href=\"https:\/\/news.utexas.edu\/2026\/05\/06\/data-centers-are-growing-in-texas-but-big-questions-remain-about-water-use\/\" data-link=\"native\" rel=\"noopener nofollow\" target=\"_blank\" class=\"\">report <\/a>from UT Austin found that Texas data centers could account for 3% to 9% of the state\u2019s water use by 2040. Currently, the centers account for less than 1%. In comparison, manufacturing\u00a0accounts for 7% of water use in the state.\u00a0<\/p>\n<p>A study from the Environmental and Energy Study Institute <a href=\"https:\/\/www.eesi.org\/articles\/view\/data-centers-and-water-consumption\" data-link=\"native\" rel=\"noopener nofollow\" target=\"_blank\" class=\"\">details<\/a> how data centers use water to cool systems and produce the power necessary to operate the centers. Nearly 80% of the water used for cooling data centers evaporates in the process, the report says. The rest of that water is discharged to municipal wastewater facilities. In order to avoid the water consumption of this evaporative cooling, some data centers are working to shift <a href=\"https:\/\/local.microsoft.com\/blog\/understanding-water-use-at-microsoft-datacenters\/\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">towards <\/a>closed-loop cooling, which keeps water in the circuit to be reused.\u00a0<\/p>\n<p>Metzger explained that Texas is already a <a href=\"https:\/\/www.texastribune.org\/2025\/03\/13\/texas-water-explained-supply-demand\/\" data-link=\"native\" rel=\"noopener nofollow\" target=\"_blank\" class=\"\">water-strained state<\/a>, and the understanding is that there won\u2019t be <a href=\"https:\/\/www.dallasnews.com\/news\/natural-resources\/article\/could-dfw-have-no-water-22199736.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">enough water<\/a> to meet demand in the future. By one estimate from the Texas Water Development Board, the state\u2019s municipal water supply could fail to meet demands as early as 2030 in light of a drought and lack of action to find solutions.\u00a0<\/p>\n<p>The way to mitigate these water concerns, he explained, is to reduce water footprints using ground water, rain water, reclaimed wastewater or oil field wastewater instead of potable water.\u00a0<\/p>\n<p>He also pointed to Google\u2019s <a href=\"https:\/\/www.dallasnews.com\/news\/environment\/article\/google-invests-10m-texas-water-22289214.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">announcement <\/a>of a $10 million investment in water projects in Texas as an example of work data center constructors can do to offset water demands and help local communities.\u00a0<\/p>\n<p>Related: <a href=\"https:\/\/www.dallasnews.com\/news\/environment\/article\/google-invests-10m-texas-water-22289214.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">Google spending $10 million in Texas on water projects where it&#8217;s building, operating data centers<\/a><\/p>\n<p>Diorio said data centers are among the most efficient users of water in comparison to other industrial water users. He added that the permitting for data centers often makes their water consumption seem worse than it really is.\u00a0<\/p>\n<p>\u201cWe are an efficient water user. We will continue to be an efficient water user, and we are rapidly deploying advanced technologies to do so,\u201d Diorio said, discussing the water efficiency technologies implemented by data centers, including hybrid systems which use air to cool infrastructure and only switch to water-based cooling when explicitly necessary.\u00a0<\/p>\n<p>He noted that data centers are permitted for the \u201cworst case scenario\u201d of their water usage, when really, water use does not approach the maximum figure on a daily basis.\u00a0<\/p>\n<p>Metzger said, though, that while the water use of data centers is similar to other industrial users and efficient methods have been deployed, what\u2019s different is the scale of these developments and how quickly they are growing.\u00a0<\/p>\n<p>How do data centers impact the economy, job market?\u00a0<\/p>\n<p>A February 2025 <a href=\"https:\/\/mccmeetingspublic.blob.core.usgovcloudapi.net\/burlesontx-meet-786b312229dd4faca42731b919780043\/ITEM-Attachment-001-22d0ec4f6b02474eabf6998cd428b3e8.pdf\" data-link=\"native\" rel=\"noopener nofollow\" target=\"_blank\" class=\"\">report <\/a>from the Data Center Coalition revealed that in 2024, Texas\u2019 41 million gross square feet of data center capacity had brought in over $1.6 billion in tax revenue and an additional near $1.6 billion for local tax authorities.<\/p>\n<p>A new PWC <a href=\"https:\/\/static1.squarespace.com\/static\/63a4849eab1c756a1d3e97b1\/t\/6a04986aac382850dcd9d637\/1778686058456\/Data+Center+Economic+Contribution+Study+2026_Final.pdf\" data-link=\"native\" rel=\"noopener nofollow\" target=\"_blank\" class=\"\">study <\/a>prepared for the Data Center Coalition found that data centers contributed $65.8 billion to Texas\u2019 GDP in 2024 and directly created 103,700 jobs. Though <a href=\"https:\/\/www.brookings.edu\/articles\/new-evidence-on-data-center-employment-effects\/\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">short-term construction <\/a>jobs are typically associated with the industry, Diorio explained that data centers can bring long-term, multi-campus construction and maintenance jobs as well as the hiring of electricians and plumbers for the centers.\u00a0<\/p>\n","protected":false},"excerpt":{"rendered":"As data centers continue to pop-up around Texas and the Dallas-Fort Worth region, some experts weighed in on&hellip;\n","protected":false},"author":2,"featured_media":327488,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[910,97766,114567,102,104,103,451,17921,117009],"class_list":["post-327487","post","type-post","status-publish","format-standard","has-post-thumbnail","category-dallas","tag-business","tag-business-technology","tag-business-energy","tag-dallas","tag-dallas-headlines","tag-dallas-news","tag-energy","tag-service","tag-tp-water"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/327487","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=327487"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/327487\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/327488"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=327487"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=327487"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=327487"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}