{"id":332675,"date":"2026-06-11T20:46:08","date_gmt":"2026-06-11T20:46:08","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/332675\/"},"modified":"2026-06-11T20:46:08","modified_gmt":"2026-06-11T20:46:08","slug":"check-out-these-7-transportation-updates-in-hutto-and-pflugerville","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/332675\/","title":{"rendered":"Check out these 7 transportation updates in Hutto and Pflugerville"},"content":{"rendered":"<p>\t\t\t\t\t\t\tLearn more about ongoing and future road projects in Hutto and Pflugerville.<\/p>\n<p><a href=\"https:\/\/www.pflugervilletx.gov\/824\/Kelly-Lane\" rel=\"nofollow noopener\" target=\"_blank\">Kelly Lane Phase 3<\/a><\/p>\n<p>Project: The road will be widened to four lanes from Moorlynch Avenue to Weiss Lane.<\/p>\n<p>Update: Full utility design was completed in May.<\/p>\n<p>Timeline: completion expected in March 2028Cost: $36 millionFunding source: city bond funds<a href=\"https:\/\/www.pflugervilletx.gov\/1\/Home?contentId=b88a5c20-1af7-47de-9cb3-1c19c67709c4\" rel=\"nofollow noopener\" target=\"_blank\">Parkway Drive<\/a><\/p>\n<p>Project: The road will be reconstructed with pavement, curb, drainage, sidewalk and streetlight improvements.<\/p>\n<p>Update: The project went to bid in May.<\/p>\n<p>Cost: $3.2 millionFunding source: city bond funds, roadway impact fees<a href=\"https:\/\/communityimpact.com\/austin\/pflugerville-hutto\/transportation\/2021\/01\/15\/pflugerville-drives-ahead-on-pfluger-farm-lane-north-pflugerville-parkway-projects\/\" rel=\"nofollow noopener\" target=\"_blank\">Pfluger Farm Lane North<\/a><\/p>\n<p>Project: The road will be widened to three lanes and extended to connect to SH 45.<\/p>\n<p>Update: The city anticipated receiving 60% of design plans by the end of June.<\/p>\n<p>Cost: $6.7 millionFunding source: city bond funds, roadway impact fees<\/p>\n<p>&#8220;&gt;<\/p>\n<p><a href=\"https:\/\/pflugervilletx.gov\/310\/Traffic-Advisories?contentId=35564f09-cdd9-4090-b5e9-3fdc1fd55295\" rel=\"nofollow noopener\" target=\"_blank\">Helios Way<\/a><\/p>\n<p>Project: The road will connect to SH 130 Frontage Road.<\/p>\n<p>Update: The completion date was extended to August.<\/p>\n<p>Timeline: completion was expected in MayCost: $5.8 millionFunding source: Type B sales tax<a href=\"https:\/\/city-hutto-tx-projects.cleargov.com\/18139\/t19-2024-cr-199-reconstruction\" rel=\"nofollow noopener\" target=\"_blank\">CR 199<\/a><\/p>\n<p>Project: The project will reconstruct CR 199 from CR 132 to FM 1660 South.<\/p>\n<p>Update: Funding will be allocated in 2028<\/p>\n<p>Timeline: TBDCost: $20.5 millionFunding source: TBD<a href=\"https:\/\/communityimpact.com\/austin\/pflugerville-hutto\/transportation\/2023\/06\/01\/hutto-breaks-ground-on-first-in-series-of-fm-1660-road-projects\/\" rel=\"nofollow noopener\" target=\"_blank\">FM 1660 South at Hwy. 79<\/a><\/p>\n<p>Project: New turn lanes and signals will be added to the intersection of FM 1660 South and Hwy. 79.<\/p>\n<p>Update: Design is complete.<\/p>\n<p>Timeline: expected to bid in early 2027Cost: $4.8 millionFunding source: 2022 general obligation bonds<a href=\"https:\/\/www.huttotx.gov\/840\/Old-Town-Parking-Improvement-Plan\" rel=\"nofollow noopener\" target=\"_blank\">Old Town parking and traffic improvements<\/a><\/p>\n<p>Project: The city is converting downtown streets into one-way traffic.<\/p>\n<p>Update: Main Street was converted to a one-way in April.<\/p>\n<p>Timeline: total project completion expected in 2026Cost: $500,000 for designFunding source: Hutto Economic Development Corp. funding<\/p>\n","protected":false},"excerpt":{"rendered":"Learn more about ongoing and future road projects in Hutto and Pflugerville. Kelly Lane Phase 3 Project: The&hellip;\n","protected":false},"author":2,"featured_media":332676,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[132,134,133,118909,118908,118911,99066,118912,118910],"class_list":["post-332675","post","type-post","status-publish","format-standard","has-post-thumbnail","category-austin","tag-austin","tag-austin-headlines","tag-austin-news","tag-hutto-transportation-listings","tag-hutto-transportation-projects","tag-pflugerville-road-projects","tag-pflugerville-transportation-projects","tag-road-work-in-pflugerville","tag-transportation-projects-in-hutto"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/332675","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=332675"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/332675\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/332676"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=332675"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=332675"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=332675"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}