{"id":333746,"date":"2026-06-12T15:24:09","date_gmt":"2026-06-12T15:24:09","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/333746\/"},"modified":"2026-06-12T15:24:09","modified_gmt":"2026-06-12T15:24:09","slug":"meet-the-man-in-charge-of-building-vias-new-rapid-bus-lines","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/333746\/","title":{"rendered":"Meet the man in charge of building VIA&#8217;s new rapid bus lines"},"content":{"rendered":"<p><img alt=\"Rod Sanchez, senior vice president and development for VIA, outside the VIA Metropolitan Transit on March 31.\" loading=\"eager\" fetchpriority=\"high\"   style=\"aspect-ratio:3 \/ 2\" class=\"x100 y100 opc bgpc ofcv bgscv block bg-gray200 mnh0px fill\"\/><\/p>\n<p>Rod Sanchez, senior vice president and development for VIA, outside the VIA Metropolitan Transit on March 31.<\/p>\n<p>Andrew J. Whitaker\/San Antonio Express-News<\/p>\n<p>Last year, VIA Metropolitan Transit started work on the Green Line, a $481 million rapid bus route that represents the agency\u2019s shot at redemption after a driver shortage forced it to make drastic service cuts due to the COVID-19 pandemic.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/cdn-channels-pixel.ex.co\/events\/0012000001fxZm9AAE?integrationType=DEFAULT&amp;template=design%2Farticle%2Fplatypus_one_column.tpl\" alt=\"\" class=\"x1px y1px vh abs\" aria-hidden=\"true\" width=\"1\" height=\"1\"\/><\/p>\n<p>It&#8217;s the largest transit project in the region&#8217;s history by a long shot. When it&#8217;s ready to go, a new fleet of 60-foot buses will zoom along the 10-mile route from the South Side to nearly as far north as San Antonio International Airport, picking up riders every 10 minutes, an unheard-of frequency in San Antonio.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>The deadline for completion is 2028 \u2014 and Rod Sanchez, VIA\u2019s senior vice president of planning and development and the man in charge of the project, is determined to meet that deadline.<\/p>\n<p class=\"MM_onlineOnly\" title=\"CCI Online Only\">ALSO READ: <a href=\"https:\/\/www.expressnews.com\/news\/article\/via-green-line-construction-roads-close-21358593.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">VIA has started work on its $481M Green Line. Here&#8217;s what to expect.<\/a><\/p>\n<p>It won\u2019t be easy. The Green Line will require building 25 bus stations and 10 miles of bus-only lanes. It will require 138 miles of drainage improvements. Several major intersections will be revamped.\u00a0<\/p>\n<p>In overseeing the project, Sanchez will lean on what he learned during a 31-year career with the city of San Antonio that saw him rise from budget analyst to assistant city manager overseeing the 2022-2027 bond program that funded $1.2 billion in public works projects.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>This is one in a series of profiles the Express-News will publish over the course of 2026 recognizing emerging leaders in business, science, politics, education, the arts and other fields. To learn more about the series and to nominate people you think should be considered for profiles, go to Expressnews.com\/20for26<\/p>\n<p>&#8216;I get to focus on this&#8217;<\/p>\n<p>Lured from the city to VIA in 2024, Sanchez has spent the past two years helping VIA evolve from a bus fleet operator to an organization capable of tackling immense capital projects. The Green Line is being funded mostly with federal dollars after <a href=\"https:\/\/www.expressnews.com\/news\/article\/via-bus-green-line-federal-grant-19988526.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">VIA secured<\/a> a $268 million Federal Transit Administration grant in 2024.<\/p>\n<p>Part of VIA&#8217;s evolution has been hiring executives with big-league construction experience. One of those is\u00a0<a href=\"https:\/\/www.expressnews.com\/news\/article\/via-transit-razi-hosseini-green-line-21127095.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">Razi Hosseini<\/a>, who worked under Sanchez as the city\u2019s public works director and is now VIA\u2019s vice president of engineering.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>Sanchez, 58, said he relishes being able to focus so much of his time on one project.\u00a0<\/p>\n<p>&#8220;When I was at the city, every day there was some fire that needed to be put out with one of my departments,&#8221; he said. &#8220;I was always pulled away to do other things. Here, I get to focus on this. I\u2019m involved. I mean, I spent the last six or so weeks just negotiating a contract. I was actually the point person doing the negotiating on the contract.&#8221;<\/p>\n<p>The contract he described is a $346.7 million construction management agreement with\u00a0Flatiron-Herzog, a joint venture handling the Green Line\u2019s construction. VIA expects to finalize the agreement in the next few months.<\/p>\n<p>Some of the projects from the 2022-2027 bond measure ended up <a href=\"https:\/\/www.expressnews.com\/news\/article\/public-works-split-capital-delivery-20815859.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">mired in delays<\/a>, angering residents and business owners. The trouble spots included the reconstruction of three downtown arteries: Broadway, Saint Mary\u2019s Street and South Alamo Street.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>Sanchez said those delays were caused by the discovery of underground pipes and cables in the path of construction, a common problem when digging in the urban core.<\/p>\n<p>He said he\u2019s proud of the results. The city announced in April that it had completed the South Alamo project, just in time for Fiesta.<\/p>\n<p>&#8220;I know it was painful, but I\u2019m proud of Broadway. Broadway turned out beautiful. Saint Mary\u2019s is a great, great strip,&#8221; he said. The South Alamo project will have a &#8220;huge&#8221; impact, he said.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>The Green Line involves much less of that tricky utility work, he said.<\/p>\n<p>&#8220;We\u2019ll be done by April \u201928 \u2014 that\u2019s the schedule,&#8221; he said. &#8220;As a matter of fact, that\u2019s part of this contract that we\u2019re writing, to make sure that we\u2019re done by that day.&#8221;<\/p>\n<p>Turning point for VIA<\/p>\n<p>VIA began working on the Green Line in 2021. Sanchez, then an assistant city manager, served as the city\u2019s liaison for the project.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>That led to conversations with VIA\u2019s then-CEO, Jeffrey Arndt, about joining the transit agency.<\/p>\n<p>In addition to the Green Line, Sanchez\u2019s team is working on the Silver Line, a rapid bus route that would run east-west from Our Lady of the Lake University on the West Side to Frost Bank Center on the East Side, with an estimated cost of <a href=\"https:\/\/www.expressnews.com\/news\/article\/via-silver-line-cost-increase-21038732.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">$322 million<\/a>. VIA has hired an architect to design that route while it tries to secure a $146.7 million federal grant.<\/p>\n<p>Jon Gary Herrera, VIA&#8217;s president and CEO, said the Green and Silver lines are among the largest non-TxDOT transportation projects ever undertaken in San Antonio.<\/p>\n<p>Having Sanchez in charge of the Green Line &#8220;helps me sleep at night,&#8221; Herrera said. &#8220;We&#8217;re not having to rely on contractors as much as we have in the past&#8230; We&#8217;re in a better position because of Rod.&#8221;<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>The Green and Silver lines are the capstone of VIA&#8217;s effort to recapture ridership it lost during the pandemic.\u00a0<\/p>\n<p>The lines will use a transit model known as &#8220;bus rapid transit,&#8221; which gives the buses will their own lanes for much of the way,and their own station platforms where riders will pay before getting on board, and with synchronized traffic signals to avoid slowing the buses down in normal traffic.<\/p>\n<p>&#8220;It\u2019s going to be faster than we\u2019ve ever done. It\u2019s going to be super-reliable. We\u2019re going to move a lot of people,&#8221; Sanchez said. &#8220;I\u2019m thinking of all the possibilities where people park at North Star Mall, go shopping and get on the Green Line, go watch the Spurs play. Or come down to the dome for some event.&#8221;<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>During his time at the city, Sanchez was adept at handling the inevitable complications of major construction projects, said former City Manager Sheryl Sculley, who in 2006 promoted Sanchez to become director of the city\u2019s Development Services Department. He led that department for a decade, until becoming assistant city manager in 2017.<\/p>\n<p>&#8220;He can see the big picture while managing the detail,&#8221; Sculley said. &#8220;Sometimes people get lost in the detail and are just mired in the confusion of it all, but he can see the big picture and make the appropriate decisions, bring in the resources in terms of staff knowledge and experience in order to problem-solve.&#8221;<\/p>\n<p>&#8216;Shape and mold San Antonio&#8217;<\/p>\n<p>Sanchez has deep roots in San Antonio and the construction industry. He grew up on the West Side, and his father and uncle were both electricians. He would go with them on jobs starting at age 10. His mother was an elementary school librarian.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>His parents always expected him to go to college, he said.<\/p>\n<p>&#8220;My dad told me, I wanted you to do this because I wanted you to see how hard it was,&#8221; he said. &#8220;I wanted you to see that this is not an easy life &#8230; I want you to work in an office, not out here with your hands.&#8221;<\/p>\n<p class=\"MM_onlineOnly\" title=\"CCI Online Only\">ALSO READ: <a href=\"https:\/\/www.expressnews.com\/news\/article\/via-board-fare-free-vote-21940323.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">VIA&#8217;s board says no to mayor&#8217;s push to try out free bus fares<\/a><\/p>\n<p>He played football at Oliver Wendell Holmes High School until he was diagnosed with testicular cancer in his senior year. He finished his studies at home while he underwent chemotherapy. He wears a class ring from St. Mary\u2019s University, where he was captain of the tennis team.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>A parishioner at St. Luke Catholic Church, he wears a &#8220;fishers of men&#8221; bracelet. He has a 10-game season ticket plan with the Spurs; he also roots for the Dallas Cowboys and Boston Red Sox.<\/p>\n<p>After earning a bachelor\u2019s degree in finance at St. Mary\u2019s, Sanchez earned a master\u2019s in urban administration from Trinity University, studying under Lou Fox, who was San Antonio\u2019s city manager from 1982-90. Sanchez says he considered going into the private sector, but listening to Fox\u2019s &#8220;war stories&#8221; kindled an interest in public service.<\/p>\n<p>&#8220;I really felt that I had an opportunity to shape and mold San Antonio and make it a better place to live, work and play. A place I want my kids to grow up in,&#8221; he said.<\/p>\n<p>He met his wife,\u00a0Celena, while working for the city. They have a son and daughter, both college-age.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>On his desk in VIA\u2019s headquarters sits a paperweight inscribed with the words &#8220;Can do,&#8221; modeled after one used by Lady Bird Johnson.\u00a0<\/p>\n<p>&#8216;Something I can show my kids&#8217;<\/p>\n<p>During his years in city government, he helped bring about reforms in the Development Services Department. Sculley said many in the business community were &#8220;extremely upset&#8221; with the city\u2019s permitting process when she became city manager in 2005.\u00a0<\/p>\n<p>Sanchez sped up the inspection process and made it more consistent. He also trained employees to help contractors modify plans rather than reject them outright. He formed a partnership with the Real Estate Council of San Antonio to &#8220;make San Antonio a place where people wanted to do business.&#8221;<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>Sanchez said he plans to stay with VIA until his retirement. He isn\u2019t sure when that will be.<\/p>\n<p>The Silver Line is set for completion in 2031, and after that, he would be free to work on other projects. He muses that VIA might expand the Green Line farther south, to the Brooks master-planned community. Or it might bring bus rapid transit innovations, such as designated lanes and synchronized signals, to other routes.<\/p>\n<p>&#8220;I love building projects,&#8221; he said. &#8220;You know, something I can show my kids, and one day when I have grandkids show them as well \u2014 &#8216;I had something to do with that.'&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"Rod Sanchez, senior vice president and development for VIA, outside the VIA Metropolitan Transit on March 31. Andrew&hellip;\n","protected":false},"author":2,"featured_media":333747,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[82,84,83],"class_list":["post-333746","post","type-post","status-publish","format-standard","has-post-thumbnail","category-san-antonio","tag-san-antonio","tag-san-antonio-headlines","tag-san-antonio-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/333746","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=333746"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/333746\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/333747"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=333746"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=333746"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=333746"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}