{"id":336204,"date":"2026-06-14T18:22:29","date_gmt":"2026-06-14T18:22:29","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/336204\/"},"modified":"2026-06-14T18:22:29","modified_gmt":"2026-06-14T18:22:29","slug":"txdot-road-closures-happening-between-june-14-and-june-21","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/336204\/","title":{"rendered":"TxDOT road closures happening between June 14 and June 21"},"content":{"rendered":"<p>EL PASO, Texas (KFOX14\/ CBS4) \u2014  View the interactive TxDOT map and cameras <a href=\"https:\/\/its.txdot.gov\/its\/District\/ELP\/cameras\" target=\"_blank\" rel=\"nofollow noopener\">here.<\/a><\/p>\n<p>Artcraft Project<\/p>\n<p>9 p.m. &#8211; 6 a.m.<\/p>\n<p>Monday, June 15 and Tuesday, June 16<\/p>\n<p>I-10 westbound between Redd and Loop 375 (Transmountain) full closure<\/p>\n<p>Wednesday, June 17 and Thursday, June 18<\/p>\n<p>I-10 eastbound between Loop 375 (Transmountain) and Redd full closure<\/p>\n<p>Crews will be placing girders for U-turn bridges.<\/p>\n<p>Monday, June 15 \u2013 Friday, June 19<\/p>\n<p>9 a.m. &#8211; 4 p.m. (As Needed)<\/p>\n<p>SH-178 (Artcraft) east and westbound between New Mexico State Line and Doniphan alternate lane closures<\/p>\n<p>Crews will be working on ITS\/illumination and MSE wall installation.<\/p>\n<p>North Desert between Helen of Troy and Cheddars Restaurant alternate lane closuresSouth Desert between Charlie Clark Nissan and Blue Sky alternate lane closures<\/p>\n<p>Crews will be loading and unloading material and equipment.<\/p>\n<p>I-10 west and eastbound between Redd and Transmountain alternate lane closures<\/p>\n<p>Crews will be working on median columns steel and erecting formwork.<\/p>\n<p>Continuous Closure Until Further Notice 24\/7<\/p>\n<p>Monday, June 1 \u2013 Beginning of August (Approx. 8-9 weeks)<\/p>\n<p>Santiago at Artcraft intersection closed<\/p>\n<p>Crews will be working on a water main, storm drain, and paving.<\/p>\n<p>Monday, March 9 &#8211; End of Aug. 2026 (Approx. 5 months)<\/p>\n<p>I-10 westbound exit ramp to Transmountain closed<\/p>\n<p>Crews will be working on column construction.<\/p>\n<p>Borderland Expressway Phase 2 Project<\/p>\n<p>Monday, June 15 \u2013 Friday, June 19<\/p>\n<p>Daily, 7 a.m. &#8211; 5 p.m.<\/p>\n<p>US-54 east and westbound between Mesquite Hills and McCombs alternate lane closuresMesquite Hills reduced to one lane between US-54 and Red Man. Flaggers will be on-site directing traffic as needed for haul trucks crossing Mesquite Hills<\/p>\n<p>Flaggers will be on-site directing traffic as needed for haul trucks crossing at McCombs and Stan Roberts intersection.<\/p>\n<p>Crews will be transporting earth embankment into the project and installing portable concrete traffic barrier (PCTB).<\/p>\n<p>Runaway Truck Ramp Project<\/p>\n<p>Continuous Closure Until Further Notice 24\/7<\/p>\n<p>Loop 375 (Transmountain) east and westbound between Northwestern and I-10 left lane closedLoop 375 (Transmountain) east and westbound at Main Gap right lane closed<\/p>\n<p>Crews will be installing arrest system and overhead signs.<\/p>\n<p>Bridge Replacement at Alps Dr., Hollings St., and Concepcion St. Project<\/p>\n<p>Continuous Closure Until Further Notice 24\/7<\/p>\n<p>Alps between Marie Tobin and Raymond Telles closed<\/p>\n<p>Detour: Please follow and proceed with detours in the area.<\/p>\n<p>Crews will be working on culvert and bridge rehabilitation.<\/p>\n<p>ITS on Bridge of the Americas and Zaragoza Port of Entry Project<\/p>\n<p>Monday, June 15 \u2013 Friday, June 19<\/p>\n<p>9 a.m. &#8211; 4 p.m.<\/p>\n<p>Loop 375 (Border Highway) eastbound between San Marcial and Exit 58 (Ramp M) right two lanes and shoulder closed<\/p>\n<p>Crews will be installing a cantilever sign.<\/p>\n<p>Loop 375 (Border Highway) westbound between Fonseca and Paisano Exit right shoulder closed<\/p>\n<p>Crews will be erecting sign foundation.<\/p>\n<p>US-54 at Altura entrance ramp between Frankfort and Gateway South shoulder closed<\/p>\n<p>Crews will be installing ground boxes.<\/p>\n<p>US-54 southbound between Frankfort and Altura right lane closed<\/p>\n<p>Crews will be installing service pole.<\/p>\n<p>Gateway South between Pershing and Cambridge median closed<\/p>\n<p>Crews will be installing ground boxes.<\/p>\n<p>US-54 South between Pershing and entrance ramp to Cambridge shoulder closed<\/p>\n<p>Crews will be installing ground boxes.<\/p>\n<p>Traffic Signal Improvements \u2013 Loop 478 at Yandell and Montana at Trowbridge<\/p>\n<p>Monday, June 8 \u2013 Friday, June 12<\/p>\n<p>9 a.m. &#8211; 4 p.m.<\/p>\n<p>Yandell between Grama and Stevens all directions right lane closedCopia between Wyoming and Tularosa all directions right lane closed<\/p>\n<p>Crews will be finishing tie-ins and all traffic signals, connection to new service pole, and connection from new service pole to the controller unit.<\/p>\n<p>Loop-375 Rehabilitation Project<\/p>\n<p>Sunday, June 14 \u2013 Thursday, June 18<\/p>\n<p>8 p.m. \u2013 6 a.m. (Nightly)<\/p>\n<p>Loop 375 (Border Highway) west and eastbound between Fonseca and Oregon alternate lane closures<\/p>\n<p>Crews will be working on milling and paving.<\/p>\n<p>Saturday, June 20<\/p>\n<p>6 a.m. \u2013 4 p.m.<\/p>\n<p>Loop 375 (Border Highway) west and eastbound between Fonseca and Oregon alternate lane closures<\/p>\n<p>Crews will be working on milling and paving.<\/p>\n<p>Districtwide Striping Project<\/p>\n<p>Sunday, June 14 \u2013 Tuesday, June 16<\/p>\n<p>9 p.m. \u2013 5 a.m. (Nightly)<\/p>\n<p>FM-659 (Zaragoza) north and southbound between North Loop and US-62\/180 (Montana) mobile operations<\/p>\n<p>Crews will be working on pavement markings.<\/p>\n<p>Sunday, June 14 \u2013 Friday, June 19<\/p>\n<p>9 p.m. \u2013 5 a.m. (Nightly)<\/p>\n<p>I-10 eastbound at Frontage Road between .22 miles of RM 1111 and RM 1111 in Sierra Blanca mobile operations<\/p>\n<p>Crews will be working on reflectors and pavement markings<\/p>\n<p>BU-54A Safety Improvements<\/p>\n<p>Monday, June 15 \u2013 Friday, June 19<\/p>\n<p>9 a.m. \u2013 4 p.m.<\/p>\n<p>Dyer north and southbound between Quail and Sun Valley right lane closed<\/p>\n<p>Crews will be working on potholing \/ boring operations.<\/p>\n<p>Downtown Boring Project<\/p>\n<p>9 a.m. \u2013 4:30 p.m.<\/p>\n<p>Saturday, June 13<\/p>\n<p>I-10 westbound between Campbell and Porfirio Diaz right lane and shoulder closed<\/p>\n<p>Sunday, June 14<\/p>\n<p>I-10 east and westbound between Campbell and Porfirio Diaz right lane and shoulder closed<\/p>\n<p>Crews will be working on borings.<\/p>\n<p>Road Repair<\/p>\n<p>Sunday, June 14<\/p>\n<p>5 a.m. \u2013 4 p.m.<\/p>\n<p>I-10 East at Sunland Park lane closures at intersection<\/p>\n<p>Monday, June 15 \u2013 Friday, June 19<\/p>\n<p>9 p.m. &#8211; 5 a.m. (Night)<\/p>\n<p>I-10 westbound between Airway and US-54 alternate lane closure<\/p>\n<p>Crews will be working on concrete repairs.<\/p>\n<p>Guardrail Repair<\/p>\n<p>9 a.m. \u2013 4 p.m.<\/p>\n<p>Monday, June 15<\/p>\n<p>Paisano east and westbound between Executive and Santa Fe left lane closed<\/p>\n<p>Tuesday, June 16<\/p>\n<p>US-54 eastbound between Cassidy and Fred Wilson right lane closedSpur 601 Exit full closure<\/p>\n<p>Wednesday, June 17<\/p>\n<p>Woodrow Bean westbound between Bomarc and McCombs left lane closedBomar entrance ramp full closure<\/p>\n<p>Thursday, June 18<\/p>\n<p>I-10 eastbound between Schuster and Porfirio Diaz right lane closedPorfirio Diaz Exit ramp full closure<\/p>\n<p>Friday, June 19<\/p>\n<p>I-10 eastbound between Mesa Park and Executive right lane closed<\/p>\n<p>Concrete Repair<\/p>\n<p>Tuesday, June 16<\/p>\n<p>9 a.m. \u2013 4 p.m.<\/p>\n<p>Wyoming between El Paso and Stanton left lane closed<\/p>\n<p>Crews will be repairing bridge rail.<\/p>\n<p>Wednesday, June 17<\/p>\n<p>9 a.m. \u2013 4 p.m.<\/p>\n<p>Gateway South between Fred Wilson and Fort Bliss Entrance right lane closed<\/p>\n<p>Crews will be repairing concrete transportation barrier.<\/p>\n<p>Maintenance<\/p>\n<p>Sunday, June 14<\/p>\n<p>4 a.m. \u2013 5 p.m.<\/p>\n<p>Ramp K between US-54 South and I-10 West closedEntrance ramp between Trowbridge and US-54 South closedBoone at Yandell complete closure<\/p>\n<p>Crews will be working on bridge joints.<\/p>\n<p>Monday, June 15 \u2013 Friday, June 19<\/p>\n<p>9 a.m. &#8211; 4 p.m.<\/p>\n<p>Ramp H between I-10 East and US-54 North alternate lane closures<\/p>\n<p>Crews will be working on the bridge rail.<\/p>\n<p>I-10 east between Spur 1966 and Porfirio Diaz right lane closed<\/p>\n<p>Porfirio Diaz exit closed<\/p>\n<p>Crews will be installing signs.<\/p>\n<p>I-10 eastbound between Prospect and Santa Fe right lane closed<\/p>\n<p>Crews will be working on bridge.<\/p>\n<p>I-10 westbound under Mesa Exit right lane closed<\/p>\n<p>Crews will be cleaning.<\/p>\n<p>I-110 between Paisano and US-54 alternate lane closures<\/p>\n<p>Crews will be working on the bridge.<\/p>\n<p>I-10 widening west closures<\/p>\n<p>Phase 1<\/p>\n<p>Monday, June 15 \u2013 Saturday, June 20 (as needed)<\/p>\n<p>Daily, 9 a.m. \u2013 4 p.m.<\/p>\n<p>Nightly, 9 p.m. \u2013 6 a.m.<\/p>\n<p>I-10 east and westbound between Vinton and Resler alternate lane closuresNorth and South Desert between Vinton and Resler alternate lane closuresEntrance ramp, exit ramp, and U-turn, east and westbound between Vinton and Resler alternate lane closures<\/p>\n<p>Crews will be conducting roadwork.<\/p>\n<p>Phase 2<\/p>\n<p>Tuesday, June 16<\/p>\n<p>11:30 p.m. \u2013 3 a.m. (Night)<\/p>\n<p>South Desert between Antonio Street and Valley Chile full closure<\/p>\n<p>Crews from neighboring non-TxDOT project will be re-setting concrete barrier at Valley Chile\u2019s deceleration right lane.<\/p>\n<p>Monday, June 15 &#8211; Saturday, June 20 (As Needed)<\/p>\n<p>Daily, 9 a.m. \u2013 4 p.m.<\/p>\n<p>Nightly, 9 p.m. \u2013 6 a.m.<\/p>\n<p>I-10 east and westbound between Anthony and Mesa alternate lane closures (No Detour Needed)North and South Desert between Anthony and Mesa alternate lane closures (No Detour Needed)<\/p>\n<p>Crews will be conducting concrete paving, as well as paving trucks will be exiting the work area, crossing from median to I-10.<\/p>\n<p>Continuous Closure Until Further Notice 24\/7<\/p>\n<p>Full U-turn underpass at Bridge C between Anthony and Vinton closed<\/p>\n<p>Detour<\/p>\n<p>Traffic on North Desert will need to proceed to Anthony, TX and utilize U-turn BridgeTraffic on South Desert will need to proceed to Vinton, TX and utilize U-turn Bridge<\/p>\n<p>Crews will be conducting Bridge Demolition and Bridge Construction on U-turns under I-10 at Bridge C<\/p>\n<p>South Desert between Valley Chile and Vinton Steel left lane closed<\/p>\n<p>Detour<\/p>\n<p>Traffic will be kept in one lane, with access to entrance ramp at Valley Chile, then continue in one lane of traffic until past Bridge D at Vinton Steel<\/p>\n<p>Crews will be working on bridge demolition and bridge construction.<\/p>\n<p>North and South Desert at the Los Mochis intersection left lane closed<\/p>\n<p>Crews will be working on Los Mochis intersection.<\/p>\n<p>South Desert between Transmountain and Isela Rubalcalva right lane closedNorth Desert between Transmountain and Isela Rubalcalva left lane closed<\/p>\n<p>Crews will be working on roadway reconfiguration for South Desert.<\/p>\n<p>Monday, June 15- Saturday, June 20 (As Needed)<\/p>\n<p>9 a.m. \u2013 4 p.m.<\/p>\n<p>I-10 east and westbound Bypass lanes between Mesa and Redd full closure<\/p>\n<p>Detour:<\/p>\n<p>Traffic will continue along North Desert, through Thorn intersection, and enter I-10 before Redd.<\/p>\n<p>Crews will be completing construction on ornamental fences and landscaping at Thorn.<\/p>\n<p>I-10 westbound exit Ramp 10 (Redd) full closure<\/p>\n<p>Detour:<\/p>\n<p>Traffic to exit at Mesa, proceed onto North Desert through Mesa and Thorn intersections.<\/p>\n<p>Crews will be working on striping repairs.<\/p>\n<p>Horizon\/Darrington Reconstruction Project<\/p>\n<p>Monday, June 15 &#8211; Friday, June 19<\/p>\n<p>Daily, 9 a.m. &#8211; 5 p.m.<\/p>\n<p>Horizon Boulevard east and westbound alternating lane closures between Horizon crossing Street and Rodman StreetDarrington Road north and southbound alternating lane closures between Homestead Drive and Nunda Drive<\/p>\n<p>Crews will be working on islands and medians.<\/p>\n<p>Continuous closure until July 2026<\/p>\n<p>Darrington Road southbound full closure from Homestead Drive to Roslyn DriveDarrington Road and Roslyn\/Alderwood Manor Drive intersection full closure<\/p>\n<p>Crews will be installing water, sewer, and storm drain lines.<\/p>\n<p>Bridge Maintenance Project<\/p>\n<p>Sunday, June 14 &#8211; Thursday, June 18<\/p>\n<p>Nightly, 9 p.m. &#8211; 5 a.m.<\/p>\n<p>I-10 eastbound alternate lane closures at Piedras Street overpassI-10 eastbound to US 54 eastbound connector alternate lane closures<\/p>\n<p>Crews will be working on bridge.<\/p>\n<p>Safety Lighting Project<\/p>\n<p>Monday, June 15 &#8211; Friday, June 19<\/p>\n<p>Daily, 9 a.m. &#8211; 4 p.m.<\/p>\n<p>Titanic Avenue east- and westbound right shoulder closures between Howard Street and Pandora StreetCopia Street north-and southbound alternating lane closure between Wyoming Avenue and Hueco AvenueDyer Street north-and southbound alternating lane closure between Kemp Avenue and Van Buren Avenue<\/p>\n<p>Crews will be doing shoulder work.<\/p>\n<p>Sergeant Major Bridge Reconstruction Project<\/p>\n<p>Monday, June 15 &#8211; Friday, June 19<\/p>\n<p>9 a.m. &#8211; 5 p.m.<\/p>\n<p>Purple Heart Highway (Loop 375) southbound and northbound left lane closure between Sergeant Major Entrance and Exit Ramps<\/p>\n<p>Crews will be cleaning culverts.<\/p>\n<p>Continuous closure until December 2026<\/p>\n<p>Purple Heart Highway (Loop 375) north and southbound Sargent Major Exit Ramps closed<\/p>\n<p>Crews will be working on ramp widening and shared use path extension.<\/p>\n<p>Montana Widening Project<\/p>\n<p>Striping, 9 a.m. &#8211; 5 p.m.<\/p>\n<p>Monday, June 15 to Tuesday, June 16<\/p>\n<p>Montana Avenue eastbound frontage road alternating 3 lane closures at Yarbrough Drive intersection<\/p>\n<p>Tuesday, June 16 to Wednesday, June 17<\/p>\n<p>Montana Avenue east- and westbound frontage road alternating 2 lane closures at Lee Trevino Drive intersection<\/p>\n<p>Thursday, June 18 to Friday, June 19<\/p>\n<p>Montana Avenue eastbound frontage road alternating lane closures from George Dieter Drive to Joe Battle Boulevard<\/p>\n<p>Continuous closure until December 2026<\/p>\n<p>Montana Avenue eastbound frontage road reduced to one lane from Saul Kleinfield to Tierra Este RoadMontana Avenue and Joe Battle Boulevard intersection, northbound and southbound of Joe Battle through lanes closed.Montana Avenue westbound frontage road reduced to two lanes from Tierra Este Road to Joe Battle Boulevard<\/p>\n<p>Crews will be working on building underpass.<\/p>\n<p>PROJECTS WITH CONTINUOUS CLOSURES<\/p>\n<p>Purple Heart 375 Widening Project<\/p>\n<p>Continuous closure until further notice<\/p>\n<p>Purple Heart Highway north and southbound shoulder closures from Montana Avenue to Spur 601<\/p>\n<p>Crews will widen main lanes and construct north and southbound frontage roads.<\/p>\n<p>I-10 Hudspeth Safety Rest Area<\/p>\n<p>Continuous closure until December 2026<\/p>\n<p>I-10 east- and westbound shoulder closure between Fort Hancock and McNary<\/p>\n<p>Crews will be working on utility installation.<\/p>\n<p>RM 652 Full Widening Project<\/p>\n<p>Continuous closure until further notice<\/p>\n<p>RM 652 westbound lanes reduced to one lane two-way traffic from FM 3541 to Kimble Draw Bridge<\/p>\n<p>Closure is necessary for the reconstruction of the roadway.<\/p>\n<p>RM 652 Full Depth Rehabilitation Project<\/p>\n<p>Continuous closure until further notice<\/p>\n<p>RM 652 east and westbound alternating lane closure 8.36 miles east of FM 3541 to Reeves County Line<\/p>\n<p>Continuous two-way traffic, one-lane work zone requiring traffic to be alternating onto one lane and controlled by Temporary Traffic Signals with a 13-foot lane width restriction.<\/p>\n<p>Closure is necessary for the construction of new roadway consisting of full depth rehabilitation<\/p>\n<p>Please follow the detour signs in place on all projects. All work is dependent upon weather conditions.<\/p>\n","protected":false},"excerpt":{"rendered":"EL PASO, Texas (KFOX14\/ CBS4) \u2014 View the interactive TxDOT map and cameras here. Artcraft Project 9 p.m.&hellip;\n","protected":false},"author":2,"featured_media":257387,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12],"tags":[138,140,139],"class_list":["post-336204","post","type-post","status-publish","format-standard","has-post-thumbnail","category-el-paso","tag-el-paso","tag-el-paso-headlines","tag-el-paso-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/336204","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=336204"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/336204\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/257387"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=336204"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=336204"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=336204"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}