{"id":352206,"date":"2026-06-27T01:40:18","date_gmt":"2026-06-27T01:40:18","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/352206\/"},"modified":"2026-06-27T01:40:18","modified_gmt":"2026-06-27T01:40:18","slug":"texas-asked-data-centers-to-report-water-use-most-didnt-respond","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/352206\/","title":{"rendered":"Texas asked data centers to report water use. Most didn&#8217;t respond"},"content":{"rendered":"<p>Texas lawmakers are calling for the data center industry to be more transparent after it was revealed during a legislative hearing in Austin that the majority of the state&#8217;s data centers are not reporting their water usage.<\/p>\n<p>The Public Utility Commission of Texas sent out <a href=\"https:\/\/www.houstonpublicmedia.org\/articles\/technology\/2026\/02\/09\/542911\/texas-water-use-data-center-study-puct\/\" class=\"Link\" target=\"_blank\" rel=\"nofollow noopener\">a survey<\/a> earlier this year to collect information about water and energy usage among data centers and virtual currency mining facilities. Less than a third of the state&#8217;s 341 data centers responded to the survey.<\/p>\n<p>&#8220;We&#8217;ve received responses from 28 unique companies representing 92 data centers and virtual currency mining facilities at various stages of operation across the state,&#8221; Chris Brown, the program manager for data analysis at the PUCT, told lawmakers during a hearing for the Texas House Committee on Natural Resources.<\/p>\n<p>A provision in the state&#8217;s 2026-2027 budget directed the commission to conduct the study.<\/p>\n<p>State Rep. Mary Gonz\u00e1lez, an El Paso County Democrat, questioned whether the commission&#8217;s survey methods affected the response rate.<\/p>\n<p>&#8220;We want details of exactly what the agency did on how it recruited respondents,&#8221; Gonz\u00e1lez said. &#8220;When we put a rider in the budget, it is because we want it to be fulfilled with integrity to honor the intent, and I&#8217;m not sure that actually happened.&#8221;<\/p>\n<p>Mike Hoch, director of communications for the PUCT, responded that the commission is equally as frustrated at the response rate. <\/p>\n<p>&#8220;The better data we have, the better decisions that you all can make \u2014 that we all can make,&#8221; he said.<\/p>\n<p>    <img decoding=\"async\" class=\"Image\" alt=\"A person wears a \u201cDon\u2019t Data center my Texas\u201d pin \"  width=\"880\" height=\"587\" loading=\"lazy\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/06\/1782524417_391_.jpeg\"\/><\/p>\n<p>    A person wears a pin protesting data centers during the hearing.<\/p>\n<p>During the hearing, lawmakers also learned that only 17% of the state&#8217;s data centers responded to the Texas Water Development Board&#8217;s 2025 annual water use survey. <\/p>\n<p>The survey is required by law, and not participating is punishable as a Class C misdemeanor. It&#8217;s meant to help the board draft the 2027 state water plan. <\/p>\n<p>&#8220;We focus the limited resources we have towards the higher water users to try to capture the bulk of the state&#8217;s water use,&#8221; Temple McKinnon, the director of water supply planning at the TWDB, told lawmakers. <\/p>\n<p>McKinnon said data centers have been surveyed since 2020. At that point, there was only one facility, so the board got a 100% response rate. But that rate has declined in recent years as data centers have begun to spread across the state.<\/p>\n<p>Between 2023 and 2025, McKinnon said the number of data centers the board surveyed rose from 22 to 341.<\/p>\n<p>&#8220;This rapid emergence of water use is reminiscent of the beginning of fracking around 2009 because it, too, was a new industry with proprietary information,&#8221; she said. <\/p>\n<p>McKinnon said the board now uses information from a &#8220;frack focused database&#8221; to help fill the gaps when data centers don&#8217;t respond to its annual water use survey.<\/p>\n<p>&#8220;We do whatever we can to fill in those gaps. We&#8217;ll estimate around it. We might project, roll that over, estimate forward based upon past use,&#8221; she said. &#8220;I like to call it just forensic accounting in a way, you know. We ask these folks to report directly, but we&#8217;re also looking at many other methods to assess water use.&#8221;<\/p>\n<p>State Rep. Brad Buckley, a Republican from Bell County, said the state&#8217;s information about how much water data centers are using is &#8220;woefully lacking.&#8221;<\/p>\n<p>    <img decoding=\"async\" class=\"Image\" alt=\"Two men sitting at a dais at a public hearing lean in and speak to each other. One man points to a sheet of paper.\"  width=\"880\" height=\"587\" loading=\"lazy\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/06\/1782524418_248_.jpeg\"\/><\/p>\n<p>    Texas Rep. Bell Jr. Cecil talks to Rep. Ramon Romero during the hearing.<\/p>\n<p>&#8220;It appears like the data centers are not reporting enough data for us to make these big, long-term decisions &#8230; the impact this will have on water, power, all that other good stuff,&#8221; he said.<\/p>\n<p>State Rep. Cody Harris, a Republican from East Texas, agreed.<\/p>\n<p>&#8220;The transparency of utilization of resources shouldn&#8217;t be optional, and I think that that&#8217;s just kind of a low bar that we&#8217;re going to be looking to set next session \u2014 is disclosing how much water is used and the source of it,&#8221; he said.<\/p>\n<p>Harris also lambasted two data center companies that declined an invite to Tuesday&#8217;s hearing.<\/p>\n<p>&#8220;I invited two witnesses today who refused to come answer questions, Diode Ventures and Calypso,&#8221; Harris said. &#8220;They didn&#8217;t decline due to scheduling conflicts or any other acceptable reason. They just simply didn&#8217;t want to face tough questions. Bad actors like these are what have ignited suspicion and skepticism of all data centers in the eye of the public, but I do believe that it is prudent and important to distinguish the bad actors from those who are being good neighbors and good stewards of our resources.&#8221;<\/p>\n<p>Other companies, including Amazon, Google and Vantage Data Centers, were present and testified at the hearing.<\/p>\n","protected":false},"excerpt":{"rendered":"Texas lawmakers are calling for the data center industry to be more transparent after it was revealed during&hellip;\n","protected":false},"author":2,"featured_media":352207,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[132,134,133,5421,27,410],"class_list":["post-352206","post","type-post","status-publish","format-standard","has-post-thumbnail","category-austin","tag-austin","tag-austin-headlines","tag-austin-news","tag-data-center","tag-texas","tag-water"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/352206","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=352206"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/352206\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/352207"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=352206"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=352206"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=352206"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}