{"id":359710,"date":"2026-07-03T08:22:09","date_gmt":"2026-07-03T08:22:09","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/359710\/"},"modified":"2026-07-03T08:22:09","modified_gmt":"2026-07-03T08:22:09","slug":"cheniere-to-introduce-fuel-gas-to-seventh-corpus-christi-expansion-train","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/359710\/","title":{"rendered":"Cheniere to introduce fuel gas to seventh Corpus Christi expansion train"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Cheniere\u2019s Corpus Christi Liquefaction submitted documents related to the commissioning of the train to the US FERC on July 2.<\/p>\n<p class=\"wp-block-paragraph\">\u201cThe compliance statements and associated documentation are in support of a forthcoming request by CCL to introduce fuel gas and hot oil to Midscale Train 7,\u201d it said.<\/p>\n<p class=\"wp-block-paragraph\">CCL recently <a href=\"https:\/\/lngprime.com\/americas\/cheniere-progresses-commissioning-of-seventh-corpus-christi-expansion-train\/190551\/\" rel=\"nofollow noopener\" target=\"_blank\">received approval<\/a> from the US FERC to introduce propane into the mid-scale Train 7 thermal oxidizer and hot oil furnace for the Stage 3 project.<\/p>\n<p class=\"wp-block-paragraph\">Based on the commissioning progress for the sixth train, Cheniere could reach substantial completion of the seventh train in September this year, or even in August.<\/p>\n<p class=\"wp-block-paragraph\">The US LNG exporter\u00a0<a href=\"https:\/\/lngprime.com\/americas\/cheniere-completes-sixth-train-at-corpus-christi-expansion-project\/189294\/\" rel=\"nofollow noopener\" target=\"_blank\">announced<\/a>\u00a0the substantial completion of the sixth train on June 12.<\/p>\n<p class=\"wp-block-paragraph\">\u201cWe continue to work closely with Bechtel, our engineering, procurement, and construction contractor, and expect to complete the full seven-train, 10-plus-million-tonne-per-annum (mtpa) expansion later this year,\u201d the company said at the time.<\/p>\n<p class=\"wp-block-paragraph\">CCL also <a href=\"https:\/\/lngprime.com\/americas\/chenieres-corpus-christi-stage-3-project-98-percent-complete\/190871\/\" rel=\"nofollow noopener\" target=\"_blank\">reported <\/a>in\u00a0the May construction report\u00a0that the Stage 3 expansion project is 98 percent complete and continues to progress ahead of schedule.<\/p>\n<p class=\"wp-block-paragraph\">The first three Corpus Christi trains have a capacity of approximately 15 mtpa.<\/p>\n<p class=\"wp-block-paragraph\">The Corpus Christi Stage 3 expansion project, worth about $8 billion, includes building seven midscale trains, each with an expected liquefaction capacity of about 1.49 mtpa. <\/p>\n<p class=\"wp-block-paragraph\">However, Cheniere is\u00a0<a href=\"https:\/\/lngprime.com\/americas\/cheniere-to-boost-capacity-of-corpus-christi-midscale-trains\/169379\/\" rel=\"nofollow noopener\" target=\"_blank\">seeking authorization<\/a>\u00a0from the US FERC to increase the capacity of these trains and<a href=\"https:\/\/lngprime.com\/americas\/cheniere-progresses-commissioning-of-seventh-corpus-christi-expansion-train\/190551\/\" rel=\"nofollow noopener\" target=\"_blank\"> the other two midscale trains<\/a>.<\/p>\n<p class=\"wp-block-paragraph\">Upon completion of these expansion projects, and together with expected debottlenecking, the Corpus Christi LNG terminal is expected to reach over 30 mtpa in total liquefaction capacity later this decade.<\/p>\n","protected":false},"excerpt":{"rendered":"Cheniere\u2019s Corpus Christi Liquefaction submitted documents related to the commissioning of the train to the US FERC on&hellip;\n","protected":false},"author":2,"featured_media":359711,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[10085,155,157,156,10086],"class_list":["post-359710","post","type-post","status-publish","format-standard","has-post-thumbnail","category-corpus-christi","tag-cheniere","tag-corpus-christi","tag-corpus-christi-headlines","tag-corpus-christi-news","tag-ferc"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/359710","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=359710"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/359710\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/359711"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=359710"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=359710"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=359710"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}