{"id":360175,"date":"2026-07-03T18:06:38","date_gmt":"2026-07-03T18:06:38","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/360175\/"},"modified":"2026-07-03T18:06:38","modified_gmt":"2026-07-03T18:06:38","slug":"txdot-road-closures-happening-between-june-28-and-july-5","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/360175\/","title":{"rendered":"TxDOT road closures happening between June 28 and July 5"},"content":{"rendered":"<p>EL PASO, Texas (KFOX14\/ CBS4) \u2014 Artcraft Project<\/p>\n<p>Sunday, June 27 \u2013 Thursday, July 2<\/p>\n<p>9 p.m. \u2013 6 a.m. (Nightly)<\/p>\n<p>I-10 eastbound between Loop 375 (Transmountain) and Artcraft full closure<\/p>\n<p>Crews will be conducting bridge deck operations.<\/p>\n<p>Monday, June 29 \u2013 Thursday, July 2<\/p>\n<p>9 a.m. &#8211; 4 p.m. (As Needed)<\/p>\n<p>SH-178 (Artcraft) east and westbound between New Mexico State Line and Doniphan alternate lane closures<\/p>\n<p>Crews will be working on ITS\/illumination and MSE wall installation.<\/p>\n<p>North Desert between Helen of Troy and Cheddars Restaurant alternate lane closuresSouth Desert between Charlie Clark Nissan and Blue Sky alternate lane closures<\/p>\n<p>Crews will be loading and unloading material and equipment.<\/p>\n<p>I-10 west and eastbound between Redd and Transmountain alternate lane closures<\/p>\n<p>Crews will be working on median columns steel and erecting formwork.<\/p>\n<p>Continuous Closure Until Further Notice 24\/7<\/p>\n<p>Monday, June 1 \u2013 Beginning of August (Approx. 8-9 weeks)<\/p>\n<p>Santiago at Artcraft intersection closed<\/p>\n<p>Crews will be working on a water main, storm drain, and paving.<\/p>\n<p>Continuous Closure Until Further Notice 24\/7<\/p>\n<p>Monday, March 9 &#8211; End of Aug. 2026 (Approx. 5 months)<\/p>\n<p>I-10 westbound exit ramp to Transmountain closed<\/p>\n<p>Crews will be working on various constructions.<\/p>\n<p>Borderland Expressway Phase 2 Project<\/p>\n<p>Monday, June 29 &#8211; Friday, July 3<\/p>\n<p>Daily, 7 a.m. &#8211; 5 p.m.<\/p>\n<p>US-54 east and westbound between Mesquite Hills and McCombs alternate lane closuresMesquite Hills reduced to one lane between US-54 and Red Man. Flaggers will be on-site directing traffic as needed for haul trucks crossing Mesquite Hills<\/p>\n<p>Flaggers will be on-site directing traffic as needed for haul trucks crossing at McCombs and Stan Roberts intersection.<\/p>\n<p>Crews will be transporting earth embankment into the project.<\/p>\n<p>I-10 widening west closures<\/p>\n<p>Phase I<\/p>\n<p>Monday, June 29 \u2013 Friday, July 3 (As Needed)<\/p>\n<p>Daily, 9 a.m. \u2013 4 p.m.<\/p>\n<p>I-10 east and westbound between Los Mochis and Mesa alternate lane closuresNorth and South Desert between Los Mochis and Mesa alternate lane closuresEntrance ramp, exit ramp, and U-turn, east and westbound between Los Mochis alternate lane closures<\/p>\n<p>Crews will be working on construction items.<\/p>\n<p>Phase II<\/p>\n<p>Monday, June 29 &#8211; Saturday, July 4 (As Needed)<\/p>\n<p>Daily, 9 a.m. \u2013 4 p.m.<\/p>\n<p>Nightly, 9 p.m. \u2013 6 a.m.<\/p>\n<p>I-10 east and westbound between Anthony and Mesa alternate lane closures (No Detour Needed)North and South Desert between Anthony and Mesa alternate lane closures (No Detour Needed)<\/p>\n<p>Crews will be conducting concrete paving, as well as paving trucks will be exiting the work area, crossing from median to I-10.<\/p>\n<p>Monday, June 29- Saturday, July 4 (As Needed)<\/p>\n<p>9 a.m. \u2013 4 p.m.<\/p>\n<p>I-10 westbound Bypass lanes between Mesa and Redd full closure<\/p>\n<p>Detour:<\/p>\n<p>Traffic will continue along North Desert, through Thorn intersection, and enter I-10 before Redd.<\/p>\n<p>Crews will be completing construction on ornamental fences and landscaping at Thorn.<\/p>\n<p>I-10 eastbound Bypass lanes between Redd and Mesa full closure<\/p>\n<p>Detour: Traffic will continue along South Desert, through the Thorn intersection, and enter I-10 before Mesa.<\/p>\n<p>I-10 westbound Exit Ramp 10 (Redd) full closure<\/p>\n<p>Detour:<\/p>\n<p>Traffic to exit at Mesa, proceed onto North Desert through Mesa and Thorn intersections.<\/p>\n<p>Crews will be working on ornamental fences and landscaping.<\/p>\n<p>Continuous Closure Until Further Notice 24\/7<\/p>\n<p>Full U-turn underpass at Bridge C between Anthony and Vinton closed<\/p>\n<p>Detour<\/p>\n<p>Traffic on North Desert will need to proceed to Anthony, TX and utilize U-turn Bridge<\/p>\n<p>Traffic on South Desert will need to proceed to Vinton, TX and utilize U-turn Bridge<\/p>\n<p>Crews will be conducting Bridge Demolition and Bridge Construction on U-turns under I-10 at Bridge C<\/p>\n<p>South Desert between Valley Chile and Vinton Steel left lane closed<\/p>\n<p>Detour<\/p>\n<p>Traffic will be kept in one lane, with access to entrance ramp at Valley Chile, then continue in one lane of traffic until past Bridge D at Vinton Steel<\/p>\n<p>Crews will be working on bridge demolition and bridge construction.<\/p>\n<p>North and South Desert at the Los Mochis intersection left lane closed<\/p>\n<p>Crews will be working on Los Mochis intersection.<\/p>\n<p>South Desert between Transmountain and Isela Rubalcalva right lane closedNorth Desert between Transmountain and Isela Rubalcalva left lane closed<\/p>\n<p>Crews will be working on roadway reconfiguration for South Desert.<\/p>\n<p>Crews will be working on culvert and bridge rehabilitation.<\/p>\n<p>ITS on Bridge of the Americas and Zaragoza Port of Entry Project<\/p>\n<p>Monday, June 29 \u2013 Wednesday, July 1<\/p>\n<p>9a.m. &#8211; 4 p.m.<\/p>\n<p>Loop 375 (Border Highway) eastbound between San Marcial and Exit 58 (Ramp M) right two lanes and shoulder closed<\/p>\n<p>Crews will be installing a cantilever sign.<\/p>\n<p>Loop 375 (Border Highway) eastbound 2,000 feet before Padres exit ramp shoulder closedLoop 375 (Border Highway) westbound with TMA 2,000 feet after Padre\u2019s entrance ramp right lane closed<\/p>\n<p>Crews will be working on trench work.<\/p>\n<p>Traffic Signal Improvements<\/p>\n<p>Monday, June 29 \u2013 Friday, July 3<\/p>\n<p>9 a.m. &#8211; 4 p.m.<\/p>\n<p>Yandell between Gamma and Stevens all directions right lane closedCopia between Wyoming and Tularosa all directions right lane closed<\/p>\n<p>Crews will be finishing tie-ins and all traffic signals, connection to new service pole, and connection from new service pole to the controller unit.<\/p>\n<p>Loop-375 Rehabilitation Project<\/p>\n<p>8 p.m. &#8211; 6 a.m. (Nightly)<\/p>\n<p>Sunday, June 28<\/p>\n<p>US-54 southbound Loop 375 (Border Highway) westbound Exit 20 Ramp closure.Loop 375 (Border Highway) westbound, between US-54 and Oregon St. right two-lane closure.Loop 375 (Border Highway) westbound Paisano Exit 59 Ramp closure.<\/p>\n<p>Sunday, June 28 &#8211; Thursday, July 2<\/p>\n<p>Loop 375 (Border Highway) west and eastbound between Fonseca and Oregon alternate lane closures<\/p>\n<p>Crews will be working on milling and paving.<\/p>\n<p>BU-54A Safety Improvements<\/p>\n<p>Monday, June 29 \u2013 Wednesday, July 1<\/p>\n<p>9 a.m. \u2013 4 p.m.<\/p>\n<p>BU-54A (Dyer) north and southbound between Quail and Sun Valley alternate lane closures<\/p>\n<p>Crews will be working on potholing \/ boring operations.<\/p>\n<p>Guardrail Repair<\/p>\n<p>Sunday, June 28<\/p>\n<p>7 a.m. \u2013 3 p.m.<\/p>\n<p>I-10 West between Cotton and Kansas two right lanes closedMesa Exit full closure<\/p>\n<p>9 a.m. &#8211; 4 p.m.<\/p>\n<p>Monday, June 29<\/p>\n<p>South Desert at Loop 375 (Transmountain) right lane closed<\/p>\n<p>Tuesday, June 30<\/p>\n<p>North Desert between Loop 375 (Transmountain) and Los Mochis left lane closed<\/p>\n<p>Wednesday, July 1<\/p>\n<p>I-10 West between Santa Fe and Schuster right lane closedPorfirio Diaz Exit full closure<\/p>\n<p>Thursday, July 2<\/p>\n<p>I-10 West between Mesa Park and Sunland Park left lane closed<\/p>\n<p>Road Repair<\/p>\n<p>9 a.m. \u2013 4 p.m.<\/p>\n<p>Monday, June 29<\/p>\n<p>Gateway South at Fred Wilson right lane closed<\/p>\n<p>Tuesday, June 30<\/p>\n<p>Gateway South at Fred Wilson left lane closedFred Wilson Exit full closure<\/p>\n<p>Wednesday, July 1<\/p>\n<p>Loop 375 (Border Highway) westbound at Padres closed<\/p>\n<p>Crews will be working on concrete repairs.<\/p>\n<p>Maintenance<\/p>\n<p>Sunday, June 28<\/p>\n<p>4 a.m. \u2013 5 p.m.<\/p>\n<p>Ramp K between US-54 South and I-10 West closedEntrance ramp between Trowbridge and US-54 South closedBoone at Yandell complete closureI-10 east at Copia exit closed<\/p>\n<p>Crews will be working on bridge joints.<\/p>\n<p>Horizon\/Darrington Reconstruction Project<\/p>\n<p>Monday, June 29 &#8211; Friday, July 03<\/p>\n<p>Daily, 8 a.m. &#8211; 5 p.m.<\/p>\n<p>Horizon Boulevard east and westbound alternating lane closures between Darrington Road and Rodman StreetDarrington Road north and southbound alternating lane closures between Homestead Drive and Nunda Drive<\/p>\n<p>Crews will be performing electrical and concrete work.<\/p>\n<p>Continuous closure until July 2026<\/p>\n<p>Darrington Road southbound full closure from Homestead Drive to Roslyn DriveDarrington Road and Roslyn\/Alderwood Manor Drive intersection full closure<\/p>\n<p>Crews will be installing water, sewer, and storm drain lines.<\/p>\n<p>Safety Lighting Project<\/p>\n<p>Monday, June 29 &#8211; Friday, July 03<\/p>\n<p>Daily, 9 a.m. &#8211; 4 p.m.<\/p>\n<p>Titanic Avenue east- and westbound right shoulder closures between Howard Street and Pandora StreetCopia Street north-and southbound alternating lane closure between Wyoming Avenue and Hueco AvenueDyer Street north-and southbound alternating lane closure between Kemp Avenue and Van Buren Avenue<\/p>\n<p>Crews will be doing shoulder work.<\/p>\n<p>I-10 Hudspeth Safety Rest Area<\/p>\n<p>Monday, July 6 &#8211; Friday, July 10<\/p>\n<p>Daily, 9 a.m. &#8211; 4 p.m.<\/p>\n<p>I-10 alternating east and westbound right lane closure between MM 76 and MM 79<\/p>\n<p>Crews will be moving concrete barriers.<\/p>\n<p>Continuous closure until December 2026<\/p>\n<p>I-10 east- and westbound shoulder closure between Fort Hancock and McNary<\/p>\n<p>Crews will be working on utility installation.<\/p>\n<p>FM 258 Safety Improvements<\/p>\n<p>Monday, June 29 &#8211; Friday, July 03<\/p>\n<p>Daily, 8:30 a.m. \u2013 4 p.m.<\/p>\n<p>Socorro Road east and westbound right and turning lanes closed from Winn Road to Mood Road.<\/p>\n<p>Crews will be installing LED lights, backplates on intersections, and new mailboxes.<\/p>\n<p>Sergeant Major Bridge Reconstruction Project<\/p>\n<p>Monday, June 29 and Wednesday July 1<\/p>\n<p>9 a.m. \u2013 4 p.m.<\/p>\n<p>Purple Heart Highway (Loop 375) north- and southbound between Sargent Major Exit Ramps and Entrance Ramps.<\/p>\n<p>Crews will be pouring concrete.<\/p>\n<p>Thursday, July 2<\/p>\n<p>8 a.m. \u2013 4 p.m.<\/p>\n<p>Purple Heart Highway (Loop 375) north and southbound between Sargent Major Exit Ramps and Entrance Ramps.<\/p>\n<p>Crews will be pouring concrete.<\/p>\n<p>Continuous closure until December 2026<\/p>\n<p>Purple Heart Highway (Loop 375) north- and southbound Sargent Major Exit Ramps closed<\/p>\n<p>Crews will be working on ramp widening and shared use path extension.<\/p>\n<p>PROJECTS WITH CONTINUOUS CLOSURES<\/p>\n<p>Runaway Truck Ramp Project<\/p>\n<p>Continuous Closure Until Further Notice 24\/7<\/p>\n<p>Loop 375 (Transmountain) east and westbound between Northwestern and I-10 left lane closedLoop 375 (Transmountain) east and westbound at Main Gap right lane closed<\/p>\n<p>Crews will be installing arrest system and overhead signs.<\/p>\n<p>Bridge Replacement at Alps Dr., Hollings St., and Concepcion St. Project<\/p>\n<p>Continuous Closure Until Further Notice 24\/7<\/p>\n<p>Alps between Marie Tobin and Raymond Telles closed<\/p>\n<p>Detour: Please follow and proceed with detours in the area.<\/p>\n<p>Montana Widening Project<\/p>\n<p>Continuous closure until December 2026<\/p>\n<p>Montana Avenue eastbound frontage road reduced to one lane from Saul Kleinfield to Tierra Este RoadMontana Avenue and Joe Battle Boulevard intersection, northbound and southbound of Joe Battle through lanes closed.Montana Avenue westbound frontage road reduced to two lanes from Tierra Este Road to Joe Battle Boulevard<\/p>\n<p>Crews will be working on building underpass.<\/p>\n<p>Purple Heart 375 Widening Project<\/p>\n<p>Continuous closure until further notice<\/p>\n<p>Purple Heart Highway north- and southbound shoulder closures from Montana Avenue to Spur 601<\/p>\n<p>Crews will widen main lanes and construct north- and southbound frontage roads.<\/p>\n<p>RM 652 Full Widening Project<\/p>\n<p>Continuous closure until further notice<\/p>\n<p>RM 652 westbound lanes reduced to one lane two-way traffic from FM 3541 to Kimble Draw Bridge<\/p>\n<p>Closure is necessary for the reconstruction of the roadway.<\/p>\n<p>RM 652 Full Depth Rehabilitation Project<\/p>\n<p>Continuous closure until further notice<\/p>\n<p>RM 652 east and westbound alternating lane closure 8.36 miles east of FM 3541 to Reeves County Line<\/p>\n<p>Continuous two-way traffic, one-lane work zone requiring traffic to be alternating onto one lane and controlled by Temporary Traffic Signals with a 13-foot lane width restriction.<\/p>\n<p>Closure is necessary for the construction of new roadway consisting of full depth rehabilitation<\/p>\n<p>Please follow the detour signs in place on all project. All work is dependent upon weather conditions.<\/p>\n","protected":false},"excerpt":{"rendered":"EL PASO, Texas (KFOX14\/ CBS4) \u2014 Artcraft Project Sunday, June 27 \u2013 Thursday, July 2 9 p.m. \u2013&hellip;\n","protected":false},"author":2,"featured_media":257387,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12],"tags":[138,140,139],"class_list":["post-360175","post","type-post","status-publish","format-standard","has-post-thumbnail","category-el-paso","tag-el-paso","tag-el-paso-headlines","tag-el-paso-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/360175","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=360175"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/360175\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/257387"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=360175"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=360175"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=360175"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}