{"id":369007,"date":"2026-07-11T02:11:08","date_gmt":"2026-07-11T02:11:08","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/369007\/"},"modified":"2026-07-11T02:11:08","modified_gmt":"2026-07-11T02:11:08","slug":"tceq-proposes-six-figure-fine-for-odem-wastewater-violations","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/369007\/","title":{"rendered":"TCEQ proposes six-figure fine for Odem wastewater violations"},"content":{"rendered":"<p>ODEM, Tx \u2014 The Texas Commission on Environmental Quality is proposing a $162,650 administrative penalty against the city of Odem for 18 alleged violations at its wastewater treatment plant \u2014 <a class=\"Link\" href=\"https:\/\/www.kristv.com\/news\/6-investigates\/odem-memo-details-intentions-to-withhold-information-from-tceq\" rel=\"nofollow noopener\" target=\"_blank\">the same facility at the center of concerns first reported by KRIS 6 News nearly three years ago.<\/a><\/p>\n<p>The proposed agreed order stems from a 2023 TCEQ inspection. Among the findings: E. coli levels in discharged water were more than six times the legal limit. Inspectors also documented sewage \u2014 including grease balls and floating sludge \u2014 in a nearby receiving stream, along with several other violations.<\/p>\n<p>TCEQ proposes a six-figure penalty against Odem over wastewater treatment plant violations dating to 2023<\/p>\n<p>Odem Mayor David Maldonado gave Neighborhood News reporter Stephanie Molina a tour of the facility, pointing out equipment cited in the inspection.<\/p>\n<p>&#8220;This is a system that was out, and chemicals were being used without approval from TCEQ,&#8221; Maldonado said as he pointed towards the UV disinfection system. At that time, the city had switched to chlorine tablets for disinfection without state approval.<\/p>\n<p>The city requested a compliance plan that would give it more time to address the violations. But Maldonado said that request cannot move forward until a separate compliance plan from 2019 is closed out. He said working to fix the system has been frustrating.<\/p>\n<p>&#8220;So here we are, years later, and we&#8217;re looking back and going, &#8216;Well, this was supposedly fixed already, so why are we still working on it?'&#8221; Maldonado said.<\/p>\n<p>The wastewater problems in Odem first came to light in 2023, when 6 Investigates obtained a memo showing city leaders acknowledged wastewater problems while directing a contractor not to hire anyone who might report those problems to TCEQ.<\/p>\n<p>&#8220;All the waste from the community works its way down into this system here,&#8221; Maldonado said.<\/p>\n<p>During the inspection, TCEQ found pumps were not functioning properly. Maldonado acknowledged the issue persists.<\/p>\n<p>&#8220;When TCEQ was here, there were some pumps that were not working. Right now, we still have some pumps that are out, and that&#8217;s why we&#8217;ve had to rent these portable pumps,&#8221; Maldonado said.<\/p>\n<p>Former Mayor and current City Council Member Virginia Garza, who signed the 2023 memo directing a contractor not to hire anyone who might report sewer issues to state regulators, was contacted for comment. As of this report, she had not responded.<\/p>\n<p>The proposed order has not been finalized. The city said it is continuing to work with TCEQ to address the violations.<\/p>\n<p>&#8220;This needs to be a priority because we have no replacement for this system. If this system malfunctions at any point, we have no alternative,&#8221; Maldonado said.<\/p>\n","protected":false},"excerpt":{"rendered":"ODEM, Tx \u2014 The Texas Commission on Environmental Quality is proposing a $162,650 administrative penalty against the city&hellip;\n","protected":false},"author":2,"featured_media":369008,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[155,157,156,130719,129663,27245,130720,10873,130721,130722,57395,130723],"class_list":["post-369007","post","type-post","status-publish","format-standard","has-post-thumbnail","category-corpus-christi","tag-corpus-christi","tag-corpus-christi-headlines","tag-corpus-christi-news","tag-e-coli-water-discharge","tag-odem-city-council","tag-odem-texas","tag-odem-wastewater","tag-stephanie-molina","tag-tceq-penalty","tag-texas-environmental-violations","tag-wastewater-treatment-plant","tag-wastewater-violations"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/369007","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=369007"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/369007\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/369008"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=369007"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=369007"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=369007"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}