{"id":376066,"date":"2026-07-16T22:24:29","date_gmt":"2026-07-16T22:24:29","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/376066\/"},"modified":"2026-07-16T22:24:29","modified_gmt":"2026-07-16T22:24:29","slug":"austin-officials-approve-defend-project-connect-train-contract-cost","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/376066\/","title":{"rendered":"Austin officials approve, defend Project Connect train contract cost"},"content":{"rendered":"<p><img alt=\"A\u00a0conceptual rendering shows what the inside of\u00a0Austin\u2019s future light rail trains could look like when completed.\" loading=\"eager\" fetchpriority=\"high\"   class=\"x100 y100 opc bgpc ofct bgsct block bg-gray200 mnh0px fill\"\/><\/p>\n<p>A\u00a0conceptual rendering shows what the inside of\u00a0Austin\u2019s future light rail trains could look like when completed.<\/p>\n<p>Austin Transit Partnership<\/p>\n<p>Austin transit leaders on Wednesday approved the first phase of a $352.8 million contract to build the vehicles that will eventually carry passengers on the city\u2019s long-awaited <a href=\"https:\/\/www.statesman.com\/business\/transportation\/article\/cornyn-opposes-project-connect-funding-22216083.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">$7.1 billion light-rail system<\/a>.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/cdn-channels-pixel.ex.co\/events\/0012000001fxZm9AAE?integrationType=DEFAULT&amp;template=design%2Farticle%2Fplatypus_two_column.tpl\" alt=\"\" class=\"x1px y1px vh abs\" aria-hidden=\"true\" width=\"1\" height=\"1\"\/><\/p>\n<p>The Austin Transit Partnership board unanimously agreed to award $39 million to the U.S. division of Swiss company Stadler for the vehicles\u2019 preliminary design. Future phases, including final vehicle design and manufacturing, must receive separate approval from the board before moving forward.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>The electric trains, which will carry about 240 people apiece, will be based on <a href=\"https:\/\/www.stadlerrail.com\/en\/solutions\/rolling-stock\/urban-citylink\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">Stadler\u2019s existing Citylink platform<\/a>, but with some custom features. The vehicles will be designed alongside the rest of the system to maximize compatibility, ATP staff said.<\/p>\n<p>Stadler\u00a0beat out three other bidders to win the contract, according to ATP executive Brad Cummings. Stadler\u2019s bid was the second lowest by a small margin, but the Citylink vehicles offer more features and better value, Cummings said. The model is currently in use across Europe and in Mexico.<\/p>\n<p>Stadler U.S., headquartered in Utah, has produced vehicles for other Texas transit systems, including Capital Metro\u2019s Red Line and Dallas Area Rapid Transit.<\/p>\n<p>The Stadler contract marks the last of three major procurements for ATP, the local government entity responsible for building the voter-backed rail system. ATP <a href=\"https:\/\/www.statesman.com\/news\/local\/article\/austin-light-rail-contractor-21361240.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">previously chose Austin Rail Constructors<\/a>\u00a0\u2014 a joint venture between civil infrastructure firms Stacy Witbeck and Sundt Construction\u00a0\u2014 to design and build the system. Kiewit Austin Partnership, another joint venture between Kiewit Building Group and Austin Commercial, will construct\u00a0the maintenance facility.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>Questions over cost<\/p>\n<p>The cost of the vehicle contract had raised concerns among those questioning the need for tailor-made vehicles as <a href=\"https:\/\/www.statesman.com\/business\/transportation\/article\/texas-supreme-court-austin-project-connect-lawsuit-22272146.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">federal funding and legal challenges remain in limbo<\/a>. The Federal Transit Administration has not yet awarded an expected $4 billion grant for the project, though it has <a href=\"https:\/\/www.statesman.com\/news\/local\/article\/austin-light-rail-fta-approval-21297084.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">signaled confidence in the plan<\/a>.<\/p>\n<p>\u201cI want to make sure that we\u2019re trying to be independent and challenge the staff on the bloats of contracts, because right now, as we all know, taxpayer money is at risk,\u201d said Jeffery Bowen, a City Hall watchdog, during Wednesday\u2019s meeting.<\/p>\n<p><img alt=\"A conceptual rendering shows what the Austin Light Rail system could look like along the Drag.\" loading=\"lazy\"   style=\"aspect-ratio:16 \/ 9\" class=\"x100 y100 opc bgpc ofcv bgscv block bg-gray200 mnh0px fill\"\/><\/p>\n<p>A conceptual rendering shows what the Austin Light Rail system could look like along the Drag.<\/p>\n<p>Austin Transit Partnership<\/p>\n<p>Voters approved the light-rail line in 2020 as part of Project Connect, a ballot measure that authorized a 20% increase to the city&#8217;s property tax rate for transit improvements. Under the plan, the city would transfer that revenue to\u00a0ATP, which would use the money to repay bonds issued to finance the project\u2019s construction.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>Early proposals envisioned as many as 28 miles of track across the city, but local officials later reduced the plan to fewer than 10 miles, citing rising construction costs. As currently envisioned, the light-rail system would stretch from 38th Street to Oltorf Street, while another branch would take passengers from near Lady Bird Lake to just inside Texas 71 near \u2014 but not to \u2014 Austin-Bergstrom International Airport. Construction could begin next year and finish by 2033.<\/p>\n<p>A Monday\u00a0<a href=\"https:\/\/cbsaustin.com\/news\/local\/nyu-transit-expert-questions-high-costs-ahead-of-austin-transit-partnership-meeting\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">report from CBS Austin<\/a> (KEYE-TV) became a talking point during Wednesday\u2019s meeting. In the report, New York University transportation expert Eric Goldwyn told the television station that the contract is \u201cextremely expensive\u201d and perhaps the priciest he\u2019d ever seen. Dividing the total contract amount by the 21 vehicles ordered would put the cost at $16.8 million per vehicle.<\/p>\n<p>By comparison, the Utah Transit Authority in Salt Lake City <a href=\"https:\/\/rideuta.com\/Rider-Info\/Digital-Newsroom\/Utah-based-Stadler-to-supply-new-UTA-light-rail-cars-as-part-of-TRAX-modernization-project\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">ordered 20 Citylink vehicles from Stadler\u00a0for $129 million<\/a> in late 2024. That\u2019s $6.45 million per train.<\/p>\n<p>But those numbers require additional context, according to Lindsay Wood, ATP\u2019s executive vice president for engineering and construction. She said the $352.8 million is a \u201cnot-to-exceed\u201d amount that includes contingency funding \u2014 not necessarily what the agency will ultimately pay for the trains.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>\u201cUse of that number to try to figure out a cost per vehicle is incorrect math,\u201d Wood said in an interview. \u201cWe hold roughly 25% of the contract value in contingencies and reserves to plan for a number of unknown future conditions: everything from market escalation to what spare parts we might need.\u201d<\/p>\n<p>Unique trains for unique needs<\/p>\n<p>Wood also said Austin\u2019s unique geography and system needs call for specially designed vehicles.<\/p>\n<p>\u201cOur alignment is far more hilly than most other light rail systems in the U.S., and we are basically\u00a0maxing-out how steep these trains can run,\u201d Wood said, meaning the vehicles will need additional motors to make sure they have enough power to get up the hills.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p><img alt=\"Artist conceptual visualization shows how the light-rail line might look at the intersection of East Riverside Drive and South Pleasant Valley Road.\" loading=\"lazy\"   class=\"x100 y100 opc bgpc ofct bgsct block bg-gray200 mnh0px fill\"\/><\/p>\n<p>Artist conceptual visualization shows how the light-rail line might look at the intersection of East Riverside Drive and South Pleasant Valley Road.<\/p>\n<p>Austin Transit Partnership<\/p>\n<p>The biggest difference between Austin\u2019s trains and those in\u00a0Salt Lake City is their length. Shorter trains used in other cities would not be able to accommodate Austin\u2019s projected ridership, Wood said.<\/p>\n<p>\u201cIf we just bought that off the shelf \u2026 we would need significantly more trains to carry the number of riders we are projecting,\u201d Wood said. \u201cWe would have to buy twice as many vehicles, and the cost of twice as many vehicles, even if shorter, is far more than the cost of a longer, little-bit-uniquely designed\u201d train.<\/p>\n<p>Austin\u2019s light-rail trains will also be the first in the U.S. to eliminate steps from the cars to better accommodate passengers with disabilities, Wood added.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>\u201cWe\u2019re seeking something a little bit different here in Austin to remove as many obstacles to ridership as possible,\u201d she said.<\/p>\n<p><a href=\"https:\/\/www.statesman.com\/business\/transportation\/article\/austin-i35-watson-proposal-withdrawn-22278746.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">Mayor Kirk Watson<\/a>, who serves as vice chair of the\u00a0ATP board, emphasized that the contract approved Wednesday commits the agency to only a portion of the vehicles\u2019 potential overall cost. It does not obligate the board to follow through with the full contract if obstacles arise \u2014 a critical safeguard given the uncertainty surrounding funding, he said.<\/p>\n<p>\u201cToday isn\u2019t just about trains. It\u2019s about how we\u2019re going to govern during uncertainty,\u201d Watson said. \u201cWe ask the taxpayers to trust us, and we will demonstrate that they can trust us if we recognize the circumstances we operate in and we respond.\u201d<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>Watson said it\u2019s crucial\u00a0to keep the project moving forward while protecting taxpayers from unnecessary financial risk.<\/p>\n<p>\u201cWe only fund the work needed to preserve readiness, and nothing moves forward without us as a board saying yes again,\u201d Watson said. \u201cThat\u2019s what stewardship needs to look like: staying ready without writing a blank check.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"A\u00a0conceptual rendering shows what the inside of\u00a0Austin\u2019s future light rail trains could look like when completed. Austin Transit&hellip;\n","protected":false},"author":2,"featured_media":376067,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[132,134,133],"class_list":["post-376066","post","type-post","status-publish","format-standard","has-post-thumbnail","category-austin","tag-austin","tag-austin-headlines","tag-austin-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/376066","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=376066"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/376066\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/376067"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=376066"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=376066"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=376066"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}