{"id":383654,"date":"2026-07-23T09:43:16","date_gmt":"2026-07-23T09:43:16","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/383654\/"},"modified":"2026-07-23T09:43:16","modified_gmt":"2026-07-23T09:43:16","slug":"pentagon-plan-for-lackland-cyber-hub-clouds-port-san-antonio-pitch","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/383654\/","title":{"rendered":"Pentagon plan for Lackland cyber hub clouds Port San Antonio pitch"},"content":{"rendered":"<p><img alt=\"The 16th Air Force headquarters on Security Hill at JBSA-Lackland.\" loading=\"eager\" fetchpriority=\"high\"   style=\"aspect-ratio:3 \/ 2\" class=\"x100 y100 opc bgpc ofcv bgscv block bg-black mnh0px fill\"\/><\/p>\n<p>The 16th Air Force headquarters on Security Hill at JBSA-Lackland.<\/p>\n<p>U.S.Air Force photo<img alt=\"A look at the 16th Air Force complex from the air. The building sits on a slightly elevated part of Joint base San Antonio-Lackland that is often called Security Hill. The 16th is in the building on the lower left hand side of the photo.\" loading=\"lazy\"   style=\"aspect-ratio:3 \/ 2\" class=\"x100 y100 opc bgpc ofcv bgscv block bg-black mnh0px fill\"\/><\/p>\n<p>A look at the 16th Air Force complex from the air. The building sits on a slightly elevated part of Joint base San Antonio-Lackland that is often called Security Hill. The 16th is in the building on the lower left hand side of the photo.<\/p>\n<p>U.S. Air Force<img alt=\"A\u00a0rendering depicts an\u00a0aerial view of\u00a0Port San Antonio\u2019s concept known as\u00a0the Defense Industrial Research Campus of\u00a0the Future.\" loading=\"lazy\"   style=\"aspect-ratio:3 \/ 2\" class=\"x100 y100 opc bgpc ofct bgsct block bg-black mnh0px fill\"\/><\/p>\n<p>A\u00a0rendering depicts an\u00a0aerial view of\u00a0Port San Antonio\u2019s concept known as\u00a0the Defense Industrial Research Campus of\u00a0the Future.<\/p>\n<p>Port San Antonio<\/p>\n<p>The Pentagon has thrown a curveball at <a href=\"https:\/\/www.portsanantonio.us\/\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">Port San Antonio<\/a>\u2019s <a href=\"https:\/\/www.expressnews.com\/business\/article\/port-san-antonio-air-force-cyber-project-22319476.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">quest to lure<\/a> the Air Force\u2019s cyber headquarters from its crumbling buildings for a new, <a href=\"https:\/\/www.expressnews.com\/business\/article\/port-san-antonio-16th-air-force-campus-proposal-19444156.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">$1 billion-plus campus<\/a> at the port.\u00a0<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/cdn-channels-pixel.ex.co\/events\/0012000001fxZm9AAE?integrationType=DEFAULT&amp;template=design%2Farticle%2Fplatypus_two_column.tpl\" alt=\"\" class=\"x1px y1px vh abs\" aria-hidden=\"true\" width=\"1\" height=\"1\"\/><\/p>\n<p>The week before the port\u2019s board committed $1 million for predesign work on the project, the Army Corps of Engineers put out a <a href=\"https:\/\/sam.gov\/opp\/55da4fb3e91e4eacb068852b173d926f\/view\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">call for proposals<\/a> to build a facility at the unit\u2019s current location on <a href=\"https:\/\/www.jbsa.mil\/\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">Joint Base San <\/a><a href=\"https:\/\/www.jbsa.mil\/\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">Antonio<\/a>&#8211;<a href=\"https:\/\/www.expressnews.com\/business\/article\/lackland-security-hill-secret-military-facility-19519056.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">Lackland\u2019s<\/a><a href=\"https:\/\/www.expressnews.com\/business\/article\/lackland-security-hill-secret-military-facility-19519056.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\"> Security Hill<\/a>.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>The competing program seeks bids to develop a $986 million \u201cMulti-Domain Cyber and Intel Operations Center\u201d for the <a href=\"https:\/\/www.16af.af.mil\/\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">16th Air Force<\/a>, also known as Air Forces Cyber, that would support 3,500 workers.\u00a0<\/p>\n<p class=\"MM_onlineOnly\" title=\"CCI Online Only\">RELATED: <a href=\"https:\/\/www.expressnews.com\/business\/article\/port-san-antonio-air-force-cyber-project-22319476.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">Port San Antonio approves $1M for efforts to lure Air Force cyber hub<\/a><\/p>\n<p>Port officials declined to comment about the Army Corps proposal and said they\u2019re continuing discussions as part of the agreement they signed with the Air Force in May to \u201cexplore planning and development efforts for potential off-base solutions that could support (Air Force) missions.\u201d That was about a month before the port\u2019s approval of predesign money.<\/p>\n<p>San Antonio Express News Logo<\/p>\n<p>Make us a Preferred Source on Google to see more of us when you search.<\/p>\n<p><a href=\"https:\/\/www.google.com\/preferences\/source?q=expressnews.com\" data-link=\"native\" role=\"button\" aria-label=\"Add Preferred Source\" class=\"td300 cp f aic jcc disabled:cd wsn px24 y40px px16 py8 buttonSm fs13 xs:fs16 xs:buttonLg bg-primaryAccessible hover:o80 c-white disabled:bg-gray300 disabled:c-gray600 border bn tac br2\"><\/p>\n<p>Add Preferred Source<\/p>\n<p><\/a><\/p>\n<p>Like the port\u2019s pitch, which promises a new facility cheaper and faster by using an intergovernmental support agreement instead of the traditional military construction process, the Pentagon\u2019s solicitation also seeks to use nontraditional methods.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>According to a <a href=\"https:\/\/sam.gov\/api\/prod\/opps\/v3\/opportunities\/resources\/files\/a83976e95cc34c28bbe8946ad97a709e\/download?api_key=null&amp;token=\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">Corps presentation<\/a>, the cyber hub would be one of its first projects to use a \u201cprogressive design-build\u201d approach, which allows a vendor to be selected before design is complete. Then the government and vendor would negotiate the final details and price of the project in a setup that is more akin to private-sector deals.<\/p>\n<p class=\"MM_onlineOnly\" title=\"CCI Online Only\">READ MORE: <a href=\"https:\/\/www.expressnews.com\/business\/article\/air-forces-cyber-headquarters-elevation-plan-21235676.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">Air Force scuttles plans to raise the status of its San Antonio cyber hub<\/a><\/p>\n<p>The Corps also plans to use an \u201cOther Transaction Agreement,\u201d a contracting method that falls outside of federal acquisition rules and has been increasingly used for high-tech and classified programs, often dealing with drones, autonomy, missiles, space, artificial intelligence and cyber.<\/p>\n<p>Using that method allows more flexibility for the Pentagon and its vendors, but it means less public transparency and fewer taxpayer protections.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>More than <a href=\"https:\/\/sam.gov\/api\/prod\/opps\/v3\/opportunities\/resources\/files\/beab0c0799534e58a108f805b641f46e\/download?api_key=null&amp;token=\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">100 people attended<\/a> a corps-hosted industry day for potential vendors for the cyber center held Tuesday at Lackland. No port officials were listed as attendees.\u00a0<\/p>\n<p>The project calls for a 600,000-square-foot structure with its own 12,500-square-foot utility plant that would be home to the Air Force\u2019s \u201ccyber, intelligence, surveillance, reconnaissance, electronic warfare and information operations\u201d programs.<\/p>\n<p class=\"MM_onlineOnly\" title=\"CCI Online Only\">FROM 2024: <a href=\"https:\/\/www.expressnews.com\/business\/article\/port-san-antonio-16th-air-force-campus-proposal-19444156.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">Port San Antonio wants to build $1 billion-plus campus to house Air Forces Cyber<\/a><\/p>\n<p>Much of the \u201cfacility will be a purpose-built Cyber Operations Data Center, engineered to support high-performance computing (HPC), AI server clusters and Machine Learning (ML) platforms\u201d and \u201cwill feature scalable, high-density power infrastructure designed for future expansion.\u201d<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>The formal solicitation is set to go out on\u00a0Aug. 26 and will run for a month. Potential vendors must submit their qualifications and pitches.<\/p>\n<p>The Corps expects to award the contract in two phases beginning in 2028.\u00a0<\/p>\n<p>The Air Force didn\u2019t respond to requests for comment about the proposed center, the status of its talks with Port San Antonio or whether it\u2019s committed to keeping AFCYBER on Lackland.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>Before the latest development, the port\u2019s 2-year-old proposal appeared to have regained momentum after stalling last year amid changes at the Pentagon under the Trump administration.<\/p>\n<p>Port President and CEO Jim Perschbach didn\u2019t comment on the Pentagon\u2019s new plan, but last month he said, \u201cif we don\u2019t get a deal in the next year and a half, then this whole thing is going to fall back into another big step period \u2014 and the reason I say that is just change in administrations, change in priorities \u2014 so my hope is that we get to something executable and moving forward.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"The 16th Air Force headquarters on Security Hill at JBSA-Lackland. U.S.Air Force photo A look at the 16th&hellip;\n","protected":false},"author":2,"featured_media":383655,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[82,84,83],"class_list":["post-383654","post","type-post","status-publish","format-standard","has-post-thumbnail","category-san-antonio","tag-san-antonio","tag-san-antonio-headlines","tag-san-antonio-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/383654","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=383654"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/383654\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/383655"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=383654"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=383654"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=383654"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}