{"id":385462,"date":"2026-07-24T19:52:08","date_gmt":"2026-07-24T19:52:08","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/385462\/"},"modified":"2026-07-24T19:52:08","modified_gmt":"2026-07-24T19:52:08","slug":"txdot-road-closures-happening-between-july-25-and-august-2","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/385462\/","title":{"rendered":"TxDOT road closures happening between July 25 and August 2"},"content":{"rendered":"<p>EL PASO, Texas (KFOX14\/ CBS4) \u2014 View the interactive TxDOT map and cameras <a href=\"https:\/\/its.txdot.gov\/its\/District\/ELP\/cameras\" target=\"_blank\" rel=\"nofollow noopener\">here.<\/a><\/p>\n<p>Artcraft Project<\/p>\n<p>9 p.m. \u2013 6 a.m. (Nightly)<\/p>\n<p>Sunday, July 26 \u2013 Thursday, July 30<\/p>\n<p>Sunday, August 2 \u2013 Thursday, August 6<\/p>\n<p>I-10 east and westbound between Loop 375 (Transmountain) and Artcraft full closure<\/p>\n<p>Crews will be placing steel girders.<\/p>\n<p>Monday, July 27 \u2013 Friday, July 31<\/p>\n<p>9 a.m. &#8211; 4 p.m. (As Needed)<\/p>\n<p>SH-178 (Artcraft) east and westbound between New Mexico State Line and Doniphan alternate lane closures<\/p>\n<p>Crews will be working on ITS\/Illumination and MSE wall installation.<\/p>\n<p>North Desert between Helen of Troy and Cheddars Restaurant alternate lane closuresSouth Desert between Charlie Clark Nissan and Blue Sky alternate lane closures<\/p>\n<p>Crews will be forming bent caps.<\/p>\n<p>I-10 west and eastbound between Redd and Transmountain alternate lane closures<\/p>\n<p>Crews will be working on median columns steel and erecting formwork.<\/p>\n<p>Continuous Closures Until Further Notice 24\/7<\/p>\n<p>Monday, June 1 \u2013 Beginning of August 2026 (Approx. 8-9 weeks)<\/p>\n<p>Santiago at Artcraft intersection closed<\/p>\n<p>Crews will be working on a water main, storm drain, and paving. <\/p>\n<p>I-10 Widening West Project<\/p>\n<p>Phase 1<\/p>\n<p>Monday, July 27 \u2013 Friday, July 31(As Needed)<\/p>\n<p>Daily, 9 a.m. \u2013 4 p.m.<\/p>\n<p>I-10 east and westbound between Los Mochis and Mesa alternate lane closuresNorth and South Desert between Los Mochis and Mesa alternate lane closuresEntrance ramp, exit ramp, and U-turn, east and westbound between Los Mochis alternate lane closures<\/p>\n<p>Crews will be working on construction items.<\/p>\n<p>Phase 2<\/p>\n<p>Saturday, July 25<\/p>\n<p>3 a.m. \u2013 12 p.m. Noon<\/p>\n<p>I-10 Eastbound Frontage Road between Loop 375 (Transmountain) and Isela Rubalcava right lane closed. Business access via Spur 16.<\/p>\n<p>Crews will be conducting a traffic switch. Watch for change in configuration once closure lifts.<\/p>\n<p>Monday, July 27 &#8211; Saturday, August 1 (As Needed)<\/p>\n<p>Daily, 9 a.m. \u2013 4 p.m.<\/p>\n<p>Nightly, 9 p.m. \u2013 6 a.m.<\/p>\n<p>I-10 east and westbound between Anthony and Mesa alternate lane closures (No Detour Needed)North and South Desert between Anthony and Mesa alternate lane closures (No Detour Needed)<\/p>\n<p>Crews will be conducting dirt work and miscellaneous removals.<\/p>\n<p>Monday, July 27 &#8211; Saturday, August 1 (As Needed)<\/p>\n<p>9 a.m. \u2013 4 p.m.<\/p>\n<p>I-10 westbound Bypass lanes between Mesa and Redd full closure<\/p>\n<p>Detour:<\/p>\n<p>Traffic will continue along North Desert, through Thorn intersection, and enter I-10 before Redd.<\/p>\n<p>Crews will be completing construction on ornamental fences and landscaping at Thorn.<\/p>\n<p>I-10 eastbound Bypass lanes between Redd and Mesa full closure<\/p>\n<p>Detour: Traffic will continue along South Desert, through the Thorn intersection, and enter I-10 before Mesa.<\/p>\n<p>I-10 westbound Exit Ramp 10 at Redd full closure<\/p>\n<p>Detour:<\/p>\n<p>Traffic to exit at I-10 westbound at Mesa, proceed onto North Desert through Mesa and Thorn intersections.<\/p>\n<p>Crews will be working on striping repairs.<\/p>\n<p>I-10 westbound Exit Ramp 05 at Los Mochis full closure<\/p>\n<p>Detour: Traffic to exit Transmountain, proceed onto North Desert through the Transmountain intersection.<\/p>\n<p>I-10 westbound Entrance Ramp 05 at Los Mochis full closure<\/p>\n<p>Detour: Traffic to proceed on North Desert through the Vinton intersection.<\/p>\n<p>Continuous Closures Until Further Notice 24\/7<\/p>\n<p>Full U-turn underpass at Bridge C between Anthony and Vinton closed<\/p>\n<p>Detour<\/p>\n<p>Traffic on North Desert will need to proceed to Anthony, TX and utilize U-turn Bridge<\/p>\n<p>Traffic on South Desert will need to proceed to Vinton, TX and utilize U-turn Bridge<\/p>\n<p>Crews will be conducting Bridge Demolition and Bridge Construction on U-turns under I-10 at Bridge C<\/p>\n<p>South Desert between Valley Chile and Vinton Steel left lane closed<\/p>\n<p>Detour<\/p>\n<p>Traffic will be kept in one lane, with access to entrance ramp at Valley Chile, then continue in one lane of traffic until past Bridge D at Vinton Steel<\/p>\n<p>Crews will be working on bridge demolition and bridge construction.<\/p>\n<p>South Desert between Transmountain and Isela Rubalcava left lane closed<\/p>\n<p>Crews will be working on roadway reconfiguration for South Desert.<\/p>\n<p>North and South Desert at the Los Mochis intersection left lane closed<\/p>\n<p>Crews will be working on Los Mochis intersection.<\/p>\n<p>Campus Park intersection at South Desert closed<\/p>\n<p>Crews will be conducting paving operations.<\/p>\n<p>Monday, March 9 &#8211; End of August 2026 (Approx. 5 months)<\/p>\n<p>I-10 westbound exit ramp to Transmountain closed<\/p>\n<p>Crews will be working on various construction items.<\/p>\n<p>Borderland Expressway Phase 2 Project<\/p>\n<p>Monday, July 27 &#8211; Friday, July 31<\/p>\n<p>Daily, 7 a.m. &#8211; 5 p.m.<\/p>\n<p>US-54 east and westbound between Mesquite Hills and McCombs alternate lane closuresMesquite Hills reduced to one lane between US-54 and Red Man.<\/p>\n<p>Flaggers will be on-site directing traffic as needed for haul trucks crossing Mesquite Hills<\/p>\n<p>Flaggers will be on-site directing traffic as needed for haul trucks crossing at McCombs and Stan Roberts intersection.<\/p>\n<p>Crews will be transporting earth embankment into the project.<\/p>\n<p>Runaway Truck Ramp Project<\/p>\n<p>Monday, July 27 (overnight)<\/p>\n<p>9 p.m. &#8211; 5 a.m.<\/p>\n<p>Loop 375 (Transmountain) east and westbound between I-10 and US-54 alternate lane closure<\/p>\n<p>Crews will be working on repositioning barrier.<\/p>\n<p>Bridge Replacement at Alps Dr., Hollings St., and Concepcion St. Project<\/p>\n<p>Continuous Closure Until Further Notice 24\/7<\/p>\n<p>Alps between Marie Tobin and Raymond Telles closedHollings between Raymond Telles and Hondo Pass closed<\/p>\n<p>Detour: Please follow and proceed with detours in the area.<\/p>\n<p>Crews will be working on culvert and bridge rehabilitation.<\/p>\n<p>ITS on Bridge of the Americas and Zaragoza Port of Entry Project<\/p>\n<p>Monday, July 27 \u2013 Friday, July 31<\/p>\n<p>9 a.m. &#8211; 4 p.m.<\/p>\n<p>Loop 375 (Border Highway) eastbound between Zaragoza and Padres right lane and shoulder closed<\/p>\n<p>Crews will be working on sign foundation.<\/p>\n<p>Loop 375 (Border Highway) westbound between Padres and Zaragoza entrance ramp closed<\/p>\n<p>Crews will be working on sign.<\/p>\n<p>Loop 375 (Border Highway) westbound between Padres and Zaragoza right lane and shoulder closed<\/p>\n<p>Crews will be working on sign service pole install and fiber install.<\/p>\n<p>Loop 375 (Border Highway) eastbound between Midway and Columbia Apartments right lane and shoulder closed<\/p>\n<p>Crews will be working on sign foundation.<\/p>\n<p>Loop 375 (Border Highway) westbound between Midway and Columbia Apartments right lane and shoulder closed<\/p>\n<p>Crews will be working on sign.<\/p>\n<p>Loop 375 (Border Highway) eastbound between Fonseca and Midway right lane and shoulder closed<\/p>\n<p>Crews will be working on sign infrastructure.<\/p>\n<p>Loop 375 (Border Highway) westbound between Midway and Fonseca right lane and shoulder closed<\/p>\n<p>Crews will be working on sign infrastructure.<\/p>\n<p>US-54 southbound at Cambridge between Altura and Trowbridge right lane and shoulder closed<\/p>\n<p>Crews will be working on sign structure.<\/p>\n<p>Loop 375 (Border Highway) eastbound between San Marcial and Ramp M shoulder closed<\/p>\n<p>Crews will be working on fiber splicing for signs.<\/p>\n<p>Traffic Signal Improvements \u2013 Loop 478 at Yandell and Montana at Trowbridge<\/p>\n<p>Monday, July 27 \u2013 Friday, July 31<\/p>\n<p>7a.m. &#8211; 4 p.m.<\/p>\n<p>Montana between Chelsea Street and McAffee Place all directions right lane closedTrowbridge between Paisano and Forest Way all directions right lane closedCrews will be performing demolition and layout of new corners for the ADA ramps and the adjustments for the new traffic signals and PED poles.<\/p>\n<p>Loop 375 Rehabilitation Project<\/p>\n<p>Sunday, July 26 \u2013 Thursday, July 30<\/p>\n<p>8 p.m. \u2013 6 a.m. (Nightly)<\/p>\n<p>Loop 375 (Border Highway) westbound between Fonseca and Oregon full closureLoop 375 (Border Highway) westbound entrance ramp from US-54 full closureLoop 375 (Border Highway) westbound entrance ramp from Delta full closureLoop 375 (Border Highway) west and eastbound between Fonseca and Oregon alternate lane closures<\/p>\n<p>Crews will be working on paving.<\/p>\n<p>Saturday, August 1<\/p>\n<p>6 a.m. \u2013 4 p.m.<\/p>\n<p>Loop 375 (Border Highway) westbound between Fonseca and Oregon full closureLoop 375 (Border Highway) westbound entrance ramp from US-54 full closureLoop 375 (Border Highway) westbound entrance ramp from Delta full closureLoop 375 (Border Highway) west and eastbound between Fonseca and Oregon alternate lane closures<\/p>\n<p>Crews will be working on milling and paving.<\/p>\n<p>Districtwide Striping Project<\/p>\n<p>Sunday, July 26 \u2013 Thursday, July 30<\/p>\n<p>Sunday, August 2 \u2013 Thursday, August 6<\/p>\n<p>9 p.m. \u2013 6 a.m. (Nightly)<\/p>\n<p>I-10 east and westbound between Horizon and Paisano mobile operations<\/p>\n<p>Crews will be removing and installing pavement markings<\/p>\n<p>BU-54A Safety Improvements<\/p>\n<p>Monday, July 27 \u2013 Friday, July 31<\/p>\n<p>Daily, 9 a.m. \u2013 4 p.m.<\/p>\n<p>BU-54A (Dyer) north and southbound between Ashley and Mesquite Flor right lane and shoulder alternate lanes closed<\/p>\n<p>Crews will be working on concrete work.<\/p>\n<p>Guardrail Repair<\/p>\n<p>9 a.m. \u2013 4 p.m.<\/p>\n<p>Monday, July 27<\/p>\n<p>I-10 westbound between Mesa Park and Sunland Park left lane closed<\/p>\n<p>Tuesday, July 28<\/p>\n<p>US-54 North between Pershing and Cassidy right lane closed<\/p>\n<p>Wednesday, July 29<\/p>\n<p>Loop 375 (Transmountain) westbound between US-54 and Main Gap picnic area right lane closed<\/p>\n<p>Thursday, July 30<\/p>\n<p>I-10 westbound between Los Mochis and Vinton right lane closed<\/p>\n<p>Friday, July 31<\/p>\n<p>SH-20 (Doniphan) at FM-259 right lane closed<\/p>\n<p>Miscellaneous Concrete<\/p>\n<p>9 a.m. \u2013 4 p.m.<\/p>\n<p>Monday, July 27 \u2013 Tuesday, July 28<\/p>\n<p>Turn around between Gateway East and West complete closure<\/p>\n<p>Wednesday, July 29 \u2013 Thursday, July 30<\/p>\n<p>McCombs southbound between Dyer and Woodrow Beam right lane closed<\/p>\n<p>Crews will be working on concrete repairs.<\/p>\n<p>Maintenance<\/p>\n<p>Sunday, July 26<\/p>\n<p>4 a.m. \u2013 5 p.m.<\/p>\n<p>Ramp K between US-54 South and I-10 West closedEntrance ramp between Trowbridge and US-54 South closed<\/p>\n<p>Crews will be working on bridge joints.<\/p>\n<p>Monday, July 27 \u2013 Friday, July 31<\/p>\n<p>9 a.m. &#8211; 4 p.m.<\/p>\n<p>US-54 north and southbound between Diana and Sun Valley alternate lane closureUS-54 North at Diana entrance ramp closedUS-54 North at Sun Valley exit ramp closedUS-54 South at Sun Valley entrance ramp closed<\/p>\n<p>Crews will be working on the bridge.<\/p>\n<p>Loop 375 (Transmountain) westbound between Tom Mays Park entrance and Paseo Del Norte right lane closed<\/p>\n<p>Crews will be working on shoulder.<\/p>\n<p>Spur 601 east and westbound between Chaffee and US-54 alternate lane closuresSpur 601 westbound at Chaffee entrance ramp closedSpur 601 eastbound at Chaffee exit ramp closed<\/p>\n<p>Crew will be doing crack sealing.<\/p>\n<p>Thursday, July 30<\/p>\n<p>9 a.m. \u2013 4 p.m.<\/p>\n<p>Loop 375 (Border Highway) westbound at Exit 62 full closureSpur 1966 entrance ramp to Loop 375 closed<\/p>\n<p>Crews and Signal Shop will be removing signs.<\/p>\n<p>Horizon\/Darrington Reconstruction Project<\/p>\n<p>Monday, July 27 and Tuesday, July 28<\/p>\n<p>9 a.m. \u2013 5 p.m.<\/p>\n<p>Horizon Boulevard Full westbound lane closures between Horizon Boulevard and Homestead Drive.<\/p>\n<p>Crews will be conducting paving operations<\/p>\n<p>Crews will be paving. Monday, July 27 &#8211; Friday, July 31<\/p>\n<p>Daily, 8 a.m. &#8211; 5 p.m.<\/p>\n<p>Horizon Boulevard east and westbound alternating lane closures between Horizon Crossing Street and Rodman StreetDarrington Road north and southbound alternating lane closures between Kingston Road and Nunda Drive<\/p>\n<p>Crews will be working on islands and medians.<\/p>\n<p>Continuous closure until September 2026<\/p>\n<p>Darrington Road southbound full closure from Homestead Drive to Roslyn DriveDarrington Road and Roslyn\/Alderwood Manor Drive intersection full closure<\/p>\n<p>Crews will be installing water, sewer, and storm drain lines.<\/p>\n<p>Safety Lighting Project<\/p>\n<p>Monday, July 27 &#8211; Friday, July 31<\/p>\n<p>Daily, 9 a.m. &#8211; 4 p.m.<\/p>\n<p>Gateway East and West alternating lane and ramp closures from Raynolds Street to Paisano DriveTitanic Avenue east- and westbound right shoulder closures between Howard Street and Pandora StreetCopia Street north-and southbound alternating lane closure between Wyoming Avenue and Hueco AvenueDyer Street north-and southbound alternating lane closure between Kemp Avenue and Van Buren Avenue<\/p>\n<p>Crews will be doing shoulder work.<\/p>\n<p>Sergeant Major Bridge Reconstruction Project<\/p>\n<p>Monday, July 27, Wednesday, July 29 and Friday, July 31<\/p>\n<p>Nightly, 12 a.m. \u2013 3 p.m.<\/p>\n<p>Purple Heart Highway (Loop 375) north and southbound right lanes between Sergeant Major Exit and Entrance Ramps.<\/p>\n<p>Crews will be pouring concrete.<\/p>\n<p>Continuous closure until December 2026<\/p>\n<p>Purple Heart Highway (Loop 375) north- and southbound Sargent Major Exit Ramps closed<\/p>\n<p>Crews will be working on ramp widening and shared use path extension.<\/p>\n<p>Guardrail Repair<\/p>\n<p>9 a.m. &#8211; 4 p.m.<\/p>\n<p>Monday, July 27, 2026<\/p>\n<p>Alameda Avenue Westbound right lane closure from Oil Mill Drive to Valle Verde Street<\/p>\n<p>Tuesday, July 28, 2026<\/p>\n<p>I-10 Eastbound Lee Trevino Entrance Ramp complete closureI-10 Eastbound right lane closure from Lee Trevino Exit Ramp to Zaragoza Exit Ramp<\/p>\n<p>Wednesday, July 29, 2026<\/p>\n<p>Gateway East right lane closure from Horizon Exit Ramp to Horizon Intersection<\/p>\n<p>Thursday, July 30, 2026<\/p>\n<p>Zaragoza Southbound right lane closure from Escobar Drive to Cristo Viene Drive<\/p>\n<p>Post and Cable Repair<\/p>\n<p>Friday, July 31, 2026<\/p>\n<p>9 a.m. to 4 p.m.<\/p>\n<p>I-10 Eastbound left shoulder closure from Clint Exit Ramp to Fabens Exit Ramp<\/p>\n<p>Crews will be working on post and cable repairs.<\/p>\n<p>PROJECTS WITH CONTINOUS CLOSURES<\/p>\n<p>I-10 Hudspeth Safety Rest Area<\/p>\n<p>Continuous closure until December 2026<\/p>\n<p>I-10 east- and westbound shoulder closure between Fort Hancock and McNary<\/p>\n<p>Crews will be working on utility installation.<\/p>\n<p>Montana Widening Project<\/p>\n<p>Continuous closure until December 2026<\/p>\n<p>Montana Avenue eastbound frontage road reduced to one lane from Saul Kleinfield to Tierra Este RoadMontana Avenue and Joe Battle Boulevard intersection, northbound and southbound of Joe Battle through lanes closed.Montana Avenue westbound frontage road reduced to two lanes from Tierra Este Road to Joe Battle Boulevard<\/p>\n<p>Crews will be working on building underpass.<\/p>\n<p>Purple Heart 375 Widening Project<\/p>\n<p>Continuous closure until further notice<\/p>\n<p>Purple Heart Highway north- and southbound shoulder closures from Montana Avenue to Spur 601<\/p>\n<p>Crews will widen main lanes and construct north- and southbound frontage roads.<\/p>\n<p>RM 652 Full Widening Project<\/p>\n<p>Continuous closure until further notice<\/p>\n<p>RM 652 westbound lanes reduced to one lane two-way traffic from FM 3541 to Kimble Draw Bridge<\/p>\n<p>Closure is necessary for the reconstruction of the roadway.<\/p>\n<p>RM 652 Full Depth Rehabilitation Project<\/p>\n<p>Continuous closure until further notice<\/p>\n<p>RM 652 east and westbound alternating lane closure 8.36 miles east of FM 3541 to Reeves County Line<\/p>\n<p>Continuous two-way traffic, one-lane work zone requiring traffic to be alternating onto one lane and controlled by Temporary Traffic Signals with a 13-foot lane width restriction.<\/p>\n<p>Closure is necessary for the construction of new roadway consisting of full depth rehabilitation<\/p>\n<p>Please follow the detour signs in place on all projects. All work is dependent upon weather conditions.<\/p>\n","protected":false},"excerpt":{"rendered":"EL PASO, Texas (KFOX14\/ CBS4) \u2014 View the interactive TxDOT map and cameras here. Artcraft Project 9 p.m.&hellip;\n","protected":false},"author":2,"featured_media":257387,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12],"tags":[138,140,139],"class_list":["post-385462","post","type-post","status-publish","format-standard","has-post-thumbnail","category-el-paso","tag-el-paso","tag-el-paso-headlines","tag-el-paso-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/385462","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=385462"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/385462\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/257387"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=385462"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=385462"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=385462"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}