{"id":391330,"date":"2026-07-30T00:42:09","date_gmt":"2026-07-30T00:42:09","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/391330\/"},"modified":"2026-07-30T00:42:09","modified_gmt":"2026-07-30T00:42:09","slug":"epwater-says-stormwater-plan-is-half-done-875m-price-tag-may-take-20-years-to-finish","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/391330\/","title":{"rendered":"EPWater says stormwater plan is half done; $875M price tag may take 20+ years to finish"},"content":{"rendered":"<p>EL PASO, Texas (KFOX14\/CBS4) \u2014 El Paso Water said its stormwater plan is almost half done; however, it said the price keeps going up and time goes by. <\/p>\n<p>On Wednesday, EPWater held a press conference at the Will Ruth Pond in Northeast El Paso&#8211; the utility&#8217;s largest stormwater project to share updates regarding the utility&#8217;s stormwater projects aimed at mitigating flooding across the city. <\/p>\n<p>Gilbert Trejo, EPWater&#8217;s vice president of operations and technical services, said the utility has made progress in multiple areas but emphasized that more work remains.<\/p>\n<p><img alt=\"Gilbert Trejo, EPWater's vice president of operations and technical services. July 29, 2026. Credit: KFOX14\/CBS4\" class=\"ImageEmbed_image__qZBo_\" decoding=\"async\" height=\"365\" loading=\"lazy\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/07\/6c286896-fd31-4e67-8087-42071ff3369e-posterframe1785353397579.png\" width=\"648\"\/><\/p>\n<p>Gilbert Trejo, EPWater&#8217;s vice president of operations and technical services. July 29, 2026. Credit: KFOX14\/CBS4<\/p>\n<p>&#8220;The message to our customers and to El Paso throughout is there\u2019s still a lot of work to be done,&#8221; Trejo said. &#8220;We\u2019ve done a lot of work in Central El Paso with the gateway ponds, with the Magnolia pump station to ensure that the flooding along I-10 is vastly reduced&#8230; We did a lot of work in Northwest El Paso along the Arroyos, and those Arroyo&#8217;s are very steep and that water comes off the mountains very quickly. Done work in East El Paso and are doing work right now, planned work along I-10 and Joe Battle where the Student Activity Center pond projects are currently being designed and soon will be in construction. So we&#8217;ve touched major projects all over town, but there&#8217;s still a lot of work to be done.&#8221;<\/p>\n<p><img alt=\"Before: Arroyo 1 in Northwest El Paso. Credit: EPWater\" class=\"ImageEmbed_image__qZBo_\" decoding=\"async\" height=\"365\" loading=\"lazy\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/07\/375d9e32-97a2-49b8-83d6-e13e9efc446d-Arroyo1before.jpg\" width=\"648\"\/><\/p>\n<p>Before: Arroyo 1 in Northwest El Paso. Credit: EPWater<\/p>\n<p><img alt=\"After: Arroyo 1 in Northwest El Paso. Credit: EPWater\" class=\"ImageEmbed_image__qZBo_\" decoding=\"async\" height=\"365\" loading=\"lazy\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/07\/d4f27a84-b678-40d7-afdb-b009c50ade21-Arroyo1after.jpg\" width=\"648\"\/><\/p>\n<p>After: Arroyo 1 in Northwest El Paso. Credit: EPWater<\/p>\n<p>Trejo said EPWater has completed about half of the projects so far and that it could take the utility more than 20 years to finish the full slate of work.<\/p>\n<p>Trejo also addressed rising costs for the stormwater program, saying estimates have increased from $650 million in 2009 to $875 million now.<\/p>\n<p>Trejo attributed the increase to inflation and to EPWater identifying additional projects.<\/p>\n<p>&#8220;The cost of the project just keeps going up,&#8221; Trejo said. &#8220;As we&#8217;re seeing through inflation and through everything going on with world events, the longer we wait to do projects, the more they cost.&#8221;<\/p>\n<p>&#8220;I think the other thing I\u2019ll mention right now about the fee is that this fee on everyone&#8217;s bills, every dollar goes into the stormwater system,&#8221; Trejo said.<\/p>\n<p>When asked whether rates could rise as project costs increase, Trejo said affordability remains a priority.<\/p>\n<p>&#8220;So affordability is front of mind to us. So for me to say that they can expect, they will expect the rates to go up. No, I won&#8217;t say that because there are ways to do these projects and to do them within what we have,&#8221; Trejo said.<\/p>\n<p>RELATED: <a href=\"https:\/\/kfoxtv.com\/news\/local\/will-ruth-pond-takes-shape-in-northeast-el-paso-with-first-phase-wrapping-this-fall?src=link\" target=\"_blank\" rel=\"nofollow noopener\">Will Ruth Pond takes shape in Northeast El Paso, with first phase wrapping this fall<\/a><\/p>\n<p>Trejo acknowledged frustration over how long some projects have taken and pushed back on what it calls &#8220;misconceptions&#8221; about why&#8211; despite the projects&#8211; residents may still see water flowing through city streets during heavy rains.<\/p>\n<p>&#8220;Water is supposed to be on the streets despite what many El Pasoans will say,&#8221; Trejo said. &#8220;Putting water and taking it underground into pipes actually creates more problems because all that water has trash.&#8221;<\/p>\n<p>Trejo said debris can block pipes and ponds if stormwater is routed underground, while water flowing through streets is easier to clean up.<\/p>\n<p>Trejo called street flow a &#8220;good strategy,&#8221; while also acknowledging it can create hazards.<\/p>\n<p>&#8220;It does disrupt traffic flow, and it is dangerous, but we just ask our customers and El Pasoans, as they see water on the street, it&#8217;s gonna flow by, let it flow by. Please be patient, protect your families, protect yourself,&#8221; Trejo said.<\/p>\n<p>RECOMMENDED: <a href=\"https:\/\/kfoxtv.com\/news\/local\/canutillo-family-still-cleaning-up-after-floods-leave-sinkholes-and-damage-near-selva-dr?src=link\" target=\"_blank\" rel=\"nofollow noopener\">Canutillo family still cleaning up after floods leave sinkholes and damage near Selva Dr.<\/a><\/p>\n<p><a href=\"https:\/\/kfoxtv.com\/sign-up\" target=\"_blank\" rel=\"nofollow noopener\">Sign up<\/a> to receive the top interesting stories from in and around our community once daily in your inbox.<\/p>\n","protected":false},"excerpt":{"rendered":"EL PASO, Texas (KFOX14\/CBS4) \u2014 El Paso Water said its stormwater plan is almost half done; however, it&hellip;\n","protected":false},"author":2,"featured_media":391331,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12],"tags":[138,140,139],"class_list":["post-391330","post","type-post","status-publish","format-standard","has-post-thumbnail","category-el-paso","tag-el-paso","tag-el-paso-headlines","tag-el-paso-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/391330","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=391330"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/391330\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/391331"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=391330"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=391330"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=391330"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}