{"id":401131,"date":"2026-08-08T11:24:17","date_gmt":"2026-08-08T11:24:17","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/401131\/"},"modified":"2026-08-08T11:24:17","modified_gmt":"2026-08-08T11:24:17","slug":"john-jay-high-school-prepares-for-first-day-amid-major-campus-construction","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/401131\/","title":{"rendered":"John Jay High School prepares for first day amid major campus construction"},"content":{"rendered":"<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">SAN ANTONIO \u2013 John Jay High School families should expect traffic changes, limited entrances, and ongoing construction when students return to class Monday.<\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">However, Principal Teresa Cuellar Hernandez says the work will provide long-needed upgrades to classrooms, programs and parking. <\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">\u201cThe day kids let out, we went for construction. But we have been in construction on the other side of campus since about March of last year,\u201d Cuellar Hernandez said. <\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">The project includes significant improvements across the campus, including new engineering and robotics classrooms and upgrades to the career and technical education department. <\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">\u201cOur whole CTE department is getting new culinary labs, new cosmetology labs,\u201d Cuellar Hernandez said. \u201cIt\u2019s going to be so amazing. We really need it.\u201d<\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">The campus ROTC program will also be brought under one roof with the rest of the school, a move officials say will help add more parking. For now, families should prepare for congestion. <\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">Cuellar Hernandez said there will be one parking area that must serve staff, students and visitors. There will also be only one entrance and exit for vehicles, and one entrance into the building near the auditorium. <\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">\u201cWe want parents to be really, really patient with us,\u201d Hernandez said. \u201cRight now for our parents, the drop-off is going to be a mess until we get a procedure going.\u201d<\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">The return to campus also comes with renewed attention on pedestrian safety near the school. Last September, Jose Flores III, 16, was hit while crossing Marbach Road during lunch and later died.<\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">San Antonio\u2019s Public Works Department installed a traffic light that will stop cars so people can cross safely. Later this year, the city says it will conduct a comprehensive corridor study of Marbach Road from Loop 410 to Military Drive.<\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">Campuswide work is expected to be completed by January 2027. <\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">John Jay officials sent out the video below to families to help navigate the first day of school: <\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">More Back to School coverage on KSAT:<\/p>\n<p>Copyright 2026 by KSAT &#8211; All rights reserved.<\/p>\n","protected":false},"excerpt":{"rendered":"SAN ANTONIO \u2013 John Jay High School families should expect traffic changes, limited entrances, and ongoing construction when&hellip;\n","protected":false},"author":2,"featured_media":401132,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[43474,976,82,84,83],"class_list":["post-401131","post","type-post","status-publish","format-standard","has-post-thumbnail","category-san-antonio","tag-back-to-school","tag-john-jay-high-school","tag-san-antonio","tag-san-antonio-headlines","tag-san-antonio-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/401131","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=401131"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/401131\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/401132"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=401131"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=401131"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=401131"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}