{"id":405615,"date":"2026-08-13T16:38:08","date_gmt":"2026-08-13T16:38:08","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/405615\/"},"modified":"2026-08-13T16:38:08","modified_gmt":"2026-08-13T16:38:08","slug":"lubbock-to-break-ground-on-broadway-reconstruction-project-friday","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/405615\/","title":{"rendered":"Lubbock to break ground on Broadway Reconstruction Project Friday"},"content":{"rendered":"<p class=\"text | article-text\">LUBBOCK, Texas (KCBD) &#8211; The City of Lubbock is breaking ground on a major reconstruction of Broadway on Friday, August 14, marking the official kickoff of a project funded by the 2024 Street Bond.<\/p>\n<p class=\"text | article-text\">The ceremonial groundbreaking will take place at 11 a.m. at Broadway and Avenue M.<\/p>\n<p class=\"text | article-text\">The project will transform Broadway from Avenue Q to Avenue E. It features a new three-lane concrete road complete with street parking and dedicated bike lanes on both sides.<\/p>\n<p class=\"text | article-text\">The city will install brick pavers with alternating colors at all intersections and crosswalks. The corridor will also get new: <\/p>\n<p>Sidewalks Benches Bike racks Trees on both sides of the street<\/p>\n<p class=\"text | article-text\">To prevent future disruptions to the new pavement, the city is upgrading essential underground utilities. Work on and around Broadway will include improvements to:<\/p>\n<p>Water pipesSewer systemsDrainageArea illuminationTraffic signals<\/p>\n<p>Copyright 2026 KCBD. All rights reserved.<\/p>\n","protected":false},"excerpt":{"rendered":"LUBBOCK, Texas (KCBD) &#8211; The City of Lubbock is breaking ground on a major reconstruction of Broadway on&hellip;\n","protected":false},"author":2,"featured_media":1420,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16],"tags":[142061,142063,7797,142060,142062,994,16763,168,170,169],"class_list":["post-405615","post","type-post","status-publish","format-standard","has-post-thumbnail","category-lubbock","tag-2024-street-bond","tag-avenue-m","tag-broadway","tag-broadway-reconstruction","tag-ceremonial-groundbreaking","tag-city-of-lubbock","tag-improvements","tag-lubbock","tag-lubbock-headlines","tag-lubbock-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/405615","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=405615"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/405615\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/1420"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=405615"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=405615"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=405615"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}