{"id":412111,"date":"2026-08-20T18:42:10","date_gmt":"2026-08-20T18:42:10","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/412111\/"},"modified":"2026-08-20T18:42:10","modified_gmt":"2026-08-20T18:42:10","slug":"council-approves-220-5m-contract-for-renovating-airport-terminals","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/412111\/","title":{"rendered":"Council approves $220.5M contract for renovating airport terminals"},"content":{"rendered":"<p><img alt=\"Crews work at the construction site of Terminal C at the San Antonio International Airport. San Antonio\u2019s City Council voted Thursday to approve a $200 million contract to renovate terminals A and B, also part of efforts to upgrade and modernize the airport.\u00a0\" loading=\"eager\" fetchpriority=\"high\"   style=\"aspect-ratio:3 \/ 2\" class=\"x100 y100 opc bgpc ofcv bgscv block bg-gray200 mnh0px fill\"\/><\/p>\n<p>Crews work at the construction site of Terminal C at the San Antonio International Airport. San Antonio\u2019s City Council voted Thursday to approve a $200 million contract to renovate terminals A and B, also part of efforts to upgrade and modernize the airport.\u00a0<\/p>\n<p>Katina Zentz\/San Antonio Express-News<\/p>\n<p>San Antonio\u2019s City Council on Thursday approved a $220.5 million contract to renovate the two existing terminals at San Antonio International Airport\u00a0\u2014 a project which, along with\u00a0the ongoing $1.7 billion construction of a third terminal, is designed to lift the airport into the big leagues.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/cdn-channels-pixel.ex.co\/events\/0012000001fxZm9AAE?integrationType=DEFAULT&amp;template=design%2Farticle%2Fplatypus_two_column.tpl\" alt=\"\" class=\"x1px y1px vh abs\" aria-hidden=\"true\" width=\"1\" height=\"1\"\/><\/p>\n<p>Manhattan-Joeris, a joint venture between the local firm Joeris and the Florida-based Manhattan Construction Group, won the contract after prevailing against three other companies in a year-long bidding process. The council approved the contract on its consent agenda without\u00a0discussion.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>The renovations to the 378,524-square-foot Terminal A, built in 1984, and the 231,753-square-foot Terminal B, built in 2010, will be financed by issuing bonds that will be paid off with revenue generated by the airport.<\/p>\n<p class=\"MM_onlineOnly\" title=\"CCI Online Only\">ALSO READ: <a href=\"https:\/\/www.expressnews.com\/news\/article\/travis-rail-study-22395375.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">Study finds passenger rail route between S.A., Austin could cost $13.5B<\/a><\/p>\n<p>The city, which owns and operates the airport, doesn\u2019t appear to have said when the renovation work is expected to commence and finish. The city and airport also have not released detailed plans for what the renovations will look like.\u00a0<\/p>\n<p>The contract with Manhattan-Joeris is of a type known as \u201cconstruction manager at risk.\u201d The company hired through such a contract helps design the project, along with overseeing the construction. As the name implies, the company assumes much of the risk of cost overruns.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>Airport spokesperson\u00a0Tonya Hope\u00a0didn\u2019t immediately respond to a request for comment on Thursday.<\/p>\n<p>According to city documents, the renovations will reconfigure the ticket lobby for Terminal A and expand that terminal\u2019s security checkpoint, concessions area and restrooms. The number of gates will be reduced to create more room for passengers. That terminal\u2019s baggage handling system will be rebuilt; decorative features such as carpeting, paint, ceilings and lighting could be upgraded.<\/p>\n<p>Terminal B will be spruced up with upgrades to its furniture, equipment and fixtures, according to the agenda of Thursday\u2019s council meeting. It will receive \u201ccompliance upgrades\u201d for the Americans with Disabilities Act.<\/p>\n<p>A new passenger corridor will be built connecting terminals A and B, according to the council agenda.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>Manhattan-Joeris won the contract over San Antonio companies Austin Commercial LP and Skanska USA Building Inc. and Structure Tone Southwest\u00a0LLC, of Dallas.<\/p>\n<p>The renovations are intended to modernize the terminals and improve passenger experience, according to a slide presentation from Tim O\u2019Krongley, the airport\u2019s deputy director.<\/p>\n<p>\u201cThis is the exact kind of economic driver that we want to see for San Antonio,\u201d said District 9 City Councilwoman Misty Spears, whose district includes the airport. \u201cThe airport really is the first thing people see and the last thing people see when they visit our city.\u201d<\/p>\n<p>Terminal A, in particular, has long been seen as in need of a makeover. It has one of the narrowest concourses among major U.S. airports, resulting in bottlenecks of travelers during peak times, and its electrical system and heating, ventilating and air-conditioning system are outdated.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>The relatively poor state of Terminal A led Southwest Airlines to sue the airport and director Jesus Saenz in 2024, claiming Saenz had promised the airline would have gates in Terminal C, but then sought to confine the airline to Terminal A.<\/p>\n<p>The lawsuit <a href=\"https:\/\/www.expressnews.com\/news\/article\/southwest-san-antonio-gates-settlement-22242823.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">was settled<\/a> in May, with the city agreeing to grant Southwest gates in Terminals B and C\u00a0\u2014 leaving open the question of which airline will use the gates in Terminal A after the renovation.<\/p>\n<p>Earlier this year, the airport <a href=\"https:\/\/www.expressnews.com\/news\/article\/san-antonio-airport-terminal-a-ground-load-tarmac-22100043.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">expanded Terminal A<\/a> with a $95 million, 40,000-square-foot ground load facility, featuring more than 200 seats with charging stations and a restaurant operated by local chef Johnny Hernandez. The new facility has three gates, but can be expanded to five.<\/p>\n<p>The airport <a href=\"https:\/\/www.expressnews.com\/news\/article\/san-antonio-airport-new-terminal-groundbreaking-19969576.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">broke ground<\/a> in December on the 850,000-square foot Terminal\u00a0C, which will be larger than the airport\u2019s two existing terminals combined. It will connect to the existing Terminal B and is set to open in 2028.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>The new terminal, being constructed by Colorado-based Hensel Phelps, will feature up to 17 gates and eight security lanes; the city eventually plans to increase that number to a dozen.<\/p>\n<p>Express-News reporter Megan Rodriguez contributed to this report.<\/p>\n","protected":false},"excerpt":{"rendered":"Crews work at the construction site of Terminal C at the San Antonio International Airport. San Antonio\u2019s City&hellip;\n","protected":false},"author":2,"featured_media":412112,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[82,84,83],"class_list":["post-412111","post","type-post","status-publish","format-standard","has-post-thumbnail","category-san-antonio","tag-san-antonio","tag-san-antonio-headlines","tag-san-antonio-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/412111","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=412111"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/412111\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/412112"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=412111"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=412111"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=412111"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}