{"id":412479,"date":"2026-08-21T03:06:12","date_gmt":"2026-08-21T03:06:12","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/412479\/"},"modified":"2026-08-21T03:06:12","modified_gmt":"2026-08-21T03:06:12","slug":"study-shows-austin-san-antonio-rail-could-hit-125-mph-central-austin","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/412479\/","title":{"rendered":"Study shows Austin-San Antonio rail could hit 125 mph | Central Austin"},"content":{"rendered":"<p>A <a href=\"https:\/\/www.traviscountytx.gov\/images\/commissioners_court\/judge\/doc\/TravisCoPassRail_TechMemo.pdf\" rel=\"nofollow noopener\" target=\"_blank\">Travis County-funded feasibility study<\/a> has found no engineering dealbreakers for a 125 mph passenger rail line connecting Austin and San Antonio, Travis County Judge Andy Brown announced Aug. 20.<\/p>\n<p>The roughly $13.5 billion project would run largely on public right-of-way along SH 130 and I-10, cutting travel time between the two cities to 55-65 minutes, according to county documents.<\/p>\n<p>&#8220;Central Texas has studied passenger rail before, and we cannot wait another 30 years to study it again,&#8221; Brown said in the release.<\/p>\n<p>What you need to know<\/p>\n<p>The line would connect <a href=\"https:\/\/www.flyaustin.com\/\" rel=\"nofollow noopener\" target=\"_blank\">Austin-Bergstrom International Airport<\/a> to a terminus near downtown San Antonio&#8217;s Alamodome, with connectivity to the existing <a href=\"https:\/\/www.amtrak.com\/stations\/sas\" rel=\"nofollow noopener\" target=\"_blank\">San Antonio Amtrak Station<\/a>, and run independently of freight trains, per the study.<\/p>\n<p>Engineering firm <a href=\"https:\/\/www.hntb.com\/\" rel=\"nofollow noopener\" target=\"_blank\">HNTB<\/a> conducted the study, examining a rail corridor separate from the <a href=\"https:\/\/www.up.com\/shipping\/short-line\/lines\/texas\" rel=\"nofollow noopener\" target=\"_blank\">Union Pacific freight line<\/a> along I-35, county officials said. Direct rail infrastructure costs are estimated at about $69 million per mile, versus about $87 million per mile for I-35 highway construction.<\/p>\n<p>This is a feasibility analysis only; not a funding commitment, as environmental, ridership and financial studies are still needed, per the release.<\/p>\n<p>How we got here<\/p>\n<p>Travis County Commissioners <a href=\"https:\/\/communityimpact.com\/austin\/south-central-austin\/transportation\/2025\/10\/23\/travis-county-to-fund-125k-passenger-rail-study-between-austin-san-antonio\/\" rel=\"nofollow noopener\" target=\"_blank\">voted unanimously in October 2025<\/a> to hire HNTB for about $125,000 to study SH 130 and I-10 as an alternative to the congested I-35 corridor, according to previous Community Impact reporting.<\/p>\n<p>Brown has pushed the idea for years. After Austin and San Antonio were left out of an $8.2 billion federal rail funding round in December 2023, he and Bexar County Judge Peter Sakai formed the <a href=\"https:\/\/www.traviscountytx.gov\/commissioners-court\/county-judge\/tprac\" rel=\"nofollow noopener\" target=\"_blank\">Texas Passenger Rail Advisory Committee<\/a> in February 2024 to lobby for future investment, past reporting shows. The concept itself dates to 1984, when the <a href=\"https:\/\/www.thecorridor.org\/\" rel=\"nofollow noopener\" target=\"_blank\">Greater Austin-San Antonio Corridor Council<\/a> first formed, as stated on the organization&#8217;s website.<\/p>\n<p>The county&#8217;s study complements a separate study from the <a href=\"https:\/\/www.txdot.gov\/\" rel=\"nofollow noopener\" target=\"_blank\">Texas Department of Transportation<\/a>, which examined options on the existing I-35 and Union Pacific corridor, the route the <a href=\"https:\/\/www.amtrak.com\/texas-eagle-train\" rel=\"nofollow noopener\" target=\"_blank\">Amtrak Texas Eagle<\/a> uses today. That study wrapped in June 2026, and a detailed review by <a href=\"https:\/\/texasrailadvocates.org\/post\/deep-dive-txdot-study-finds-more-frequent-austin-san-antonio-rail-feasible-on-existing-corridor\" rel=\"nofollow noopener\" target=\"_blank\">Texas Rail Advocates<\/a> priced the expanded service at $810 million for two daily round trips, or up to $1.89 billion for eight, well below the county&#8217;s SH 130 and I-10 rail proposal.<\/p>\n<p>The review also noted Union Pacific did not participate in the study and provided no operating data, and that TxDOT&#8217;s own ridership model produced lower estimates\u2014as few as 451 daily riders\u2014than the consultant&#8217;s custom model, reporting about 2,337.<\/p>\n<p>Brown has said sharing tracks with freight rail creates reliability issues, and that a public right-of-way route avoids costly land acquisition, Community Impact previously reported. The path studied runs roughly 90 miles, with more than half of it elevated.<\/p>\n<p>What&#8217;s next<\/p>\n<p>The release doesn&#8217;t name next steps or dollars. Discussion is expected to turn toward who would operate the line, such as TxDOT, the <a href=\"https:\/\/www.mobilityauthority.com\/\" rel=\"nofollow noopener\" target=\"_blank\">Central Texas Regional Mobility Authority<\/a> or a new entity; how funding partners like Bexar County get involved; and how this compares to TxDOT&#8217;s now-completed I-35 findings.<\/p>\n","protected":false},"excerpt":{"rendered":"A Travis County-funded feasibility study has found no engineering dealbreakers for a 125 mph passenger rail line connecting&hellip;\n","protected":false},"author":2,"featured_media":412480,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[4130,132,134,133,143942,8971,143943,5874,106954,41547,394,143944,35963],"class_list":["post-412479","post","type-post","status-publish","format-standard","has-post-thumbnail","category-austin","tag-andy-brown","tag-austin","tag-austin-headlines","tag-austin-news","tag-austin-san-antonio-passenger-rail","tag-central-texas-transportation","tag-hntb-feasibility-study","tag-i-10","tag-sh-130","tag-texas-passenger-rail-advisory-committee","tag-travis-county","tag-txdot-rail-study","tag-union-pacific"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/412479","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=412479"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/412479\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/412480"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=412479"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=412479"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=412479"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}