{"id":433565,"date":"2026-09-12T05:10:19","date_gmt":"2026-09-12T05:10:19","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/433565\/"},"modified":"2026-09-12T05:10:19","modified_gmt":"2026-09-12T05:10:19","slug":"corpus-christis-pothole-battle-is-getting-bigger-as-street-paving-shrinks-2","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/433565\/","title":{"rendered":"Corpus Christi\u2019s pothole battle is getting bigger as street paving shrinks"},"content":{"rendered":"<p class=\"mb-4 text-lg md:leading-8 break-words\">Corpus Christi is scaling back its neighborhood street paving program next year, a move that will mean fewer roads getting completely rebuilt and less work for contractors.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The city paved about 40 miles of rough, pothole-riddled neighborhood streets this year. Under the planned program for next year, that number will drop to about 18 miles.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The reduction is not expected to be popular with residents who have been waiting for their streets to be repaved.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">&#8220;It&#8217;s not lost on us that they are irate and some of them are looking forward to getting their street or residential street on the list,&#8221; Interim Assistant City Manager Ernie De La Garza said. &#8220;With our future projections based on the new planned amount of 18 miles, we&#8217;re going to have to recalculate.&#8221;<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The change will also affect contractors who have relied on city paving projects.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">De La Garza said the city plans to handle more street work with its own crews instead of hiring outside contractors.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">&#8220;Instead of hiring a contractor, we can do the work in-house,&#8221; De La Garza said. &#8220;That&#8217;s the benefit to us. Actually, more impacts are going to be felt by the contracting industry because we&#8217;re going to contract less work.&#8221;<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">While the amount of street reconstruction is being reduced, the city is continuing its pothole repair operation.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">De La Garza said city crews are tracking about 2,500 potholes a week, with each repair costing about $20.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Public Works crews recently worked in the Mount Vernon and Prinston areas in 94-degree heat, using asphalt heated to about 300 degrees to patch potholes.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Public Works Tech 1 Daniel Trevino said crews understand the importance of getting the repairs done quickly.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">&#8220;We have got to keep the customers happy and try to keep the potholes as much as we can from y&#8217;all not getting hurt in your vehicles and all that,&#8221; Trevino said. &#8220;That&#8217;s why we try to be productive and hurry in this kind of job.&#8221;<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Residents who find a pothole can report it by calling 311, allowing the city to send a crew to make a temporary repair.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">But with the neighborhood paving program being reduced by more than half next year, more streets could remain in need of major repairs for longer periods of time.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">For residents dealing with deteriorating neighborhood roads, the difference is significant. The city plans to pave 22 fewer miles of residential streets next year, while continuing to spend money patching a yearly total of around 120-thousand potholes.<\/p>\n","protected":false},"excerpt":{"rendered":"Corpus Christi is scaling back its neighborhood street paving program next year, a move that will mean fewer&hellip;\n","protected":false},"author":2,"featured_media":433566,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[150617,155,157,156,150616,150619,125413,150618],"class_list":["post-433565","post","type-post","status-publish","format-standard","has-post-thumbnail","category-corpus-christi","tag-city-manager-ernie-de-la-garza","tag-corpus-christi","tag-corpus-christi-headlines","tag-corpus-christi-news","tag-de-la-garza","tag-pothole-repair","tag-residential-street","tag-street-paving"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/433565","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=433565"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/433565\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/433566"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=433565"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=433565"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=433565"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}