{"id":434377,"date":"2026-09-13T02:00:19","date_gmt":"2026-09-13T02:00:19","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/434377\/"},"modified":"2026-09-13T02:00:19","modified_gmt":"2026-09-13T02:00:19","slug":"how-the-1-7-billion-new-terminal-is-progressing-at-s-a-s-airport","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/434377\/","title":{"rendered":"How the $1.7 billion new terminal is progressing at S.A.&#8217;s airport"},"content":{"rendered":"<p><img alt=\"Construction progress\u2019 on the new Terminal C at the San Antonio International Airport. The new $1.7 billion terminal will have 18 gate\u2019s and is planned to open in the second quarter of 2028.\" loading=\"eager\" fetchpriority=\"high\"   style=\"aspect-ratio:3 \/ 2\" class=\"x100 y100 opc bgpc ofcv bgscv block bg-gray200 mnh0px fill\"\/><\/p>\n<p>Construction progress\u2019 on the new Terminal C at the San Antonio International Airport. The new $1.7 billion terminal will have 18 gate\u2019s and is planned to open in the second quarter of 2028.<\/p>\n<p>Robin Jerstad\/Contributor<\/p>\n<p>The next time you fly through San Antonio International Airport, take a look around. In about six years, almost none of what you see will look the same.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/cdn-channels-pixel.ex.co\/events\/0012000001fxZm9AAE?integrationType=DEFAULT&amp;template=design%2Farticle%2Fplatypus_two_column.tpl\" alt=\"\" class=\"x1px y1px vh abs\" aria-hidden=\"true\" width=\"1\" height=\"1\"\/><\/p>\n<p>With a pair of projects with a total price tag of about $2 billion, paid for mostly with city-issued bonds, the airport is building a new terminal, Terminal\u00a0C, while drawing up plans to overhaul the existing ones, Terminal A and Terminal B.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>The idea is not only to expand the airport\u2019s capacity \u2014 though that\u2019s a big part of it, as the city keeps reaching for its holy grail of a transatlantic flight \u2014 but to elevate its digs for an era in which travelers expect more from airports: shopping, accessibility, local authenticity, and for some, exclusive luxury.<\/p>\n<p class=\"MM_onlineOnly\" title=\"CCI Online Only\">ALSO READ: <a href=\"https:\/\/www.expressnews.com\/entertainment\/article\/san-antonio-airport-murals-22416481.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">San Antonio Airport adds sweeping murals to its public art collection<\/a><\/p>\n<p>Ten months after groundbreaking, about 80% of the steel structure for Terminal\u00a0C\u00a0is in place, along with large sections of its lofty timber ceilings, said Jesus\u00a0Saenz, the city\u2019s director of airports, and Tim O&#8217;Krongley, the deputy aviation director. On a given day, about 650 workers are laboring there, in two shifts spanning nearly all 24 hours. Due to\u00a0San Antonio\u2019s often extreme heat, concrete is being poured at night so it doesn\u2019t set too fast.<\/p>\n<p>The construction involves 2,929 metric tons of timber, covering 152,000 square feet, as well as 7,144 tons of steel, airport officials said.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>With a cost of $1.7 billion \u2014 more than $1 million for each day of construction \u2014 the new terminal is one of the most expensive public investment in San Antonio\u2019s history. It is on track to open on time in June 2028, and on budget,\u00a0O\u2019Krongley said.<\/p>\n<p>Though few finishing touches are in place, a walk through the construction site gives a sense of the airy, expansive, sunlit public space that Terminal\u00a0C is set to become. In places, its tilted timber ceilings will be 90 feet tall. At 850,000 square feet, it will be larger than the two existing terminals combined.<\/p>\n<p>It will feature 41,000 square feet of concession space and 29,000 square feet of club lounges \u2014 exclusive areas, such as Delta\u2019s Sky Club, that travelers can access by purchasing memberships or holding certain credit cards.<\/p>\n<p>The 18-gate terminal is designed to meet the air industry\u2019s future needs, Saenz said. Three of the gates will be wide enough to accommodate wide-body commercial aircraft of a kind that do not\u00a0now fly into San Antonio, he said.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>&#8220;When we\u2019re finished, you\u2019re going to see a beautiful airport,&#8221; he said. &#8220;As the city grows, as more and more business opportunities surface\u2026 the airport needs to be the engine.&#8221;<\/p>\n<p><img alt=\"Construction continues on Terminal\u00a0C at San Antonio International Airport. The $1.7 billion terminal will have 18 gates and is expected to open in 2028.\" loading=\"lazy\"   style=\"aspect-ratio:4 \/ 3\" class=\"x100 y100 opc bgpc ofcv bgscv block bg-gray200 mnh0px fill\"\/><\/p>\n<p>Construction continues on Terminal\u00a0C at San Antonio International Airport. The $1.7 billion terminal will have 18 gates and is expected to open in 2028.<\/p>\n<p>Robin Jerstad\/Contributor<\/p>\n<p>Costly expansion plan<\/p>\n<p>But the growth comes with a cost. The bond debt will be paid off with revenue generated by the airport, including passenger fees, concessions and airline rents.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>The airport\u2019s cost per enplaned passenger \u2013 a metric indicating its affordability to airlines flying in and out \u2014 is expected to rise from $14.45 in fiscal year 2026 to $32.63 in fiscal year 2035, according to a\u00a0<a href=\"https:\/\/www.sa.gov\/files\/assets\/main\/v\/1\/finance\/documents\/official-statements\/statement-20260721.pdf\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">financial analysis<\/a> commissioned by the city of San Antonio.<\/p>\n<p>The new terminal will help attract more flights, said travel industry analyst Henry\u00a0Harteveldt, president of San Francisco-based Atmosphere Research Group. But the cost of its use will be an important factor, he said.<\/p>\n<p>Airlines &#8220;may look at the terminal and the design and the architecture and say, \u2018That\u2019s nice \u2013 tell me how much it\u2019s going to cost to operate there,&#8221; Harteveldt said. &#8220;If San Antonio is able to keep its cost per\u00a0enplanement to a reasonable number, that will help the airport attract more airlines, and encourage them to hopefully add more nonstop destinations.&#8221;<\/p>\n<p>Airlines have signed lease agreements for the terminal\u2019s gates. With the agreements in place, &#8220;we are confident we can continue to grow air service while providing passengers some of the lowest costs in the region,&#8221; airport officials said in a written\u00a0statement.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p class=\"MM_onlineOnly\" title=\"CCI Online Only\">ALSO READ: <a href=\"https:\/\/www.expressnews.com\/news\/article\/san-antonio-airport-terminal-renovations-22396326.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">Council approves $220.5M contract for renovating S.A. airport terminals<\/a><\/p>\n<p>Other major Texas cities are working on <a href=\"https:\/\/www.fly2houston.com\/airport-business\/newsroom\/articles\/item\/visible-progress-defines-the-iah-terminal-b-transformation\/\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">billion-dollar airport expansion projects<\/a> of their own \u2013 including at Austin-Bergstrom International Airport, a competitor to San Antonio International. San Antonio residents might consider it worthwhile to make the drive to Austin to catch one of its direct flights to Europe, Montreal or Pittsburgh, while people along the Interstate 35 corridor can choose between the airports.<\/p>\n<p>Construction is underway on a 7,000-vehicle parking garage in Austin, and a three-gate, 85,000 square-foot expansion of one of its terminals. Two bigger projects are\u00a0<a href=\"https:\/\/www.statesman.com\/project\/austin-airport-projects\/\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">in design phase<\/a>: a concourse adding another 26 gates, at a cost of $1.1 billion; and a $865 million arrival and departures hall. Both are expected to be completed in the early 2030s.<\/p>\n<p><img alt=\"Construction progress\u2019 on the new Terminal C at the San Antonio International Airport. The new $1.7 billion terminal will have 18 gates and is planned to open in the second quarter of 2028.\" loading=\"lazy\"   style=\"aspect-ratio:3 \/ 2\" class=\"x100 y100 opc bgpc ofcv bgscv block bg-gray200 mnh0px fill\"\/><\/p>\n<p>Construction progress\u2019 on the new Terminal C at the San Antonio International Airport. The new $1.7 billion terminal will have 18 gates and is planned to open in the second quarter of 2028.<\/p>\n<p>Robin Jerstad\/For the Express-News<\/p>\n<p>Positioning airport for growth<\/p>\n<p>City and airport officials are counting on the San Antonio airport\u2019s expansion to help the city draw more direct flights to other U.S. cities, as well as Europe and beyond. In 2023, City Manager Erik Walsh referred to Terminal\u00a0C as &#8220;the most important project that the city has going forward,&#8221; adding, &#8220;We have not kept up at the airport and everybody knows it.&#8221;<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>The airport has lately suffered a series of setbacks, including the loss, in 2024, of its first nonstop service to Europe \u2013 a flight to Frankfurt through the German airline Condor. The decision to cancel that route decision resulted from a court ruling in Germany that affected Condor&#8217;s business model, not the economics of the flight itself, airport officials said. Nonetheless, the loss of the much-lobbied-for and much-incentivized flight exposed San Antonio\u2019s tenuous link to Europe.<\/p>\n<p>This year, the low-cost carrier Spirit Airlines filed for bankruptcy, which killed routes from San Antonio to Atlanta, Baltimore, Nashville, Las Vegas, Los Angeles, Orlando and Puerto Rico, among other places.<\/p>\n<p>The airport has seen declining numbers of passengers and freight traffic this year. In June, 938,721 passengers came through, down 4.3% from the same month last year.<\/p>\n<p class=\"MM_onlineOnly\" title=\"CCI Online Only\">ALSO READ: <a href=\"https:\/\/www.expressnews.com\/news\/article\/travis-rail-study-22395375.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">Study finds passenger rail route between S.A., Austin could cost $13.5B<\/a><\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>Saenz attributes the passenger decline in part to Spirit\u2019s exit. Airport officials are talking with other low-cost carriers, such as Breeze and Frontier, about increasing their service through the airport, he said.<\/p>\n<p>&#8220;You know, we have peaks and valleys,&#8221; Saenz said. &#8220;We\u2019ve lost Spirit, and we\u2019re still only 5% down. That\u2019s good for us.&#8221;<\/p>\n<p><img alt=\"Construction crews work at Terminal\u00a0C at San Antonio International Airport. The $1.7 billion terminal will have 18 gates and is expected to open in 2028.\" loading=\"lazy\"   style=\"aspect-ratio:3 \/ 2\" class=\"x100 y100 opc bgpc ofcv bgscv block bg-gray200 mnh0px fill\"\/><\/p>\n<p>Construction crews work at Terminal\u00a0C at San Antonio International Airport. The $1.7 billion terminal will have 18 gates and is expected to open in 2028.<\/p>\n<p>Robin Jerstad\/For the Express-News<\/p>\n<p>Aiming for authenticity \u2013 and luxury<\/p>\n<p>The guide star in designing Terminal C was to create a sense of local authenticity, Saenz said. In describing the facility, he and O\u2019Krongley use words familiar from San Antonio\u2019s historic center, such as paseo, mercado, acequia.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>Much of the terminal\u2019s exterior will be covered with limestone. The paseo, outside the entrance, will feature a natural area, landscaped with trees and shrubs, with plentiful seating and an event space, O\u2019Krongley said. It will include bridges reminiscent of those on the River Walk.<\/p>\n<p>&#8220;It will look like that natural street space. It has trees. That\u2019s really unique. I don\u2019t know of any other airports that have it,&#8221; O\u2019Krongley said.<\/p>\n<p>Going inside, travelers will find themselves in a &#8220;welcome plaza,&#8221; with trees growing in the natural light offered through floor-to-ceiling windows. About three-quarters of the terminal will be lit with natural sunlight, O\u2019Krongley said. This area will feature a mock acequia, with cascading water. The terminal\u2019s ticketing hall, by itself, will be nearly the size of Terminal B.<\/p>\n<p>In its concourse, the terminal will feature large art installations by local artists and terrazzo flooring, reminiscent of river stones. As part of the retail component, there will be an outdoor patio, with a view of the airfield.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p class=\"MM_onlineOnly\" title=\"CCI Online Only\">ALSO READ: <a href=\"https:\/\/www.expressnews.com\/news\/article\/san-antonio-airport-study-22420732.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">Study ranks San Antonio International Airport high for ease of passenger pick-up<\/a><\/p>\n<p>The airport is now doing excavation work for a seven-level parking garage with 2,500 spaces, scheduled to open in early 2028.<\/p>\n<p>Terminal C is being outfitted with facilities for international travel, including a controlled corridor taking passengers to a Federal Inspection Services center.<\/p>\n<p>Two of the terminal\u2019s three club lounges have been claimed. Delta Airlines has committed to lease 11,000 square feet of space for a Delta Sky Club, and American Airlines, a 10,000 square-foot space for its Admirals Club.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p><img alt=\"Construction progress\u2019 on the new Terminal C at the San Antonio International Airport. The new $1.7 billion terminal will have 18 gate\u2019s and is planned to open in the second quarter of 2028.\" loading=\"lazy\"   style=\"aspect-ratio:4 \/ 3\" class=\"x100 y100 opc bgpc ofcv bgscv block bg-gray200 mnh0px fill\"\/><\/p>\n<p>Construction progress\u2019 on the new Terminal C at the San Antonio International Airport. The new $1.7 billion terminal will have 18 gate\u2019s and is planned to open in the second quarter of 2028.<\/p>\n<p>Robin Jerstad\/Contributor<\/p>\n<p>Sprucing up terminals A and B<\/p>\n<p>After Terminal C opens, the airport plans to embark on a $300 million renovation of both Terminal A, built in 1984, and Terminal B, built in 2010. The renovation work is expected to last until 2032.<\/p>\n<p>The goal is to make them over so extensively that they will merge seamlessly with the wood ceilings and glass-curtain walls of Terminal C, Saenz said.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>&#8220;We hope, if we do a good job, you won\u2019t be able to tell the difference between the three,&#8221; he said.<\/p>\n<p>Terminal A, in particular, has long been seen as in need of a makeover. It has one of the narrowest concourses among major U.S. airports, resulting in bottlenecks of travelers during peak times.<\/p>\n<p class=\"MM_onlineOnly\" title=\"CCI Online Only\">ALSO READ: <a href=\"https:\/\/www.expressnews.com\/news\/article\/diverging-diamond-blanco-loop-1605-22402791.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">San Antonio&#8217;s first &#8216;diverging diamond&#8217; interchange is now open<\/a><\/p>\n<p>To ease congestion in the two existing terminals, the airport will likely reduce their number of gates by eight or nine, Saenz said. The terminals now have 17 gates.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>The city and airport haven\u2019t released detailed plans for what the renovations will look like; the project is currently in design, after the San Antonio City Council last month\u00a0<a href=\"https:\/\/www.expressnews.com\/news\/article\/san-antonio-airport-terminal-renovations-22396326.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">hired a construction manager<\/a> in a $220.5 million contract. But Saenz suggested the revamped terminals could feature timber ceilings and glass curtain walls, like Terminal C.<\/p>\n<p>Another question is which airlines will use the older terminals after they are renovated. The condition of Terminal A led Southwest Airlines to sue the airport and director Jesus\u00a0Saenz in 2024, claiming Saenz had promised the airline would have gates in Terminal C, but then sought to confine the airline to Terminal A.<\/p>\n<p><img alt=\"Jesus Saenz is director of airports for the city of San Antonio. &quot;When we\u2019re finished, you\u2019re going to see a beautiful airport,&quot; he said. &quot;As the city grows, as more and more business opportunities surface\u2026 the airport needs to be the engine.&quot;\" loading=\"lazy\"   style=\"aspect-ratio:3 \/ 2\" class=\"x100 y100 opc bgpc ofcv bgscv block bg-gray200 mnh0px fill\"\/><\/p>\n<p>Jesus Saenz is director of airports for the city of San Antonio. &#8220;When we\u2019re finished, you\u2019re going to see a beautiful airport,&#8221; he said. &#8220;As the city grows, as more and more business opportunities surface\u2026 the airport needs to be the engine.&#8221;<\/p>\n<p>Robin Jerstad\/Contributor<\/p>\n<p>The airport is &#8220;in discussions&#8221; with airlines about using Terminal A, Saenz said. He said he did not foresee difficulties filling the gates.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n<p>&#8220;As we move forward, someone\u2019s going to want to be in there,&#8221; he said.<\/p>\n<p>The lawsuit with Southwest <a href=\"https:\/\/www.expressnews.com\/news\/article\/southwest-san-antonio-gates-settlement-22242823.php\" data-link=\"native\" class=\"\" rel=\"nofollow noopener\" target=\"_blank\">was settled<\/a> in May, with the city agreeing to grant Southwest gates in Terminals B and C. There are no hard feelings, Saenz said.<\/p>\n<p>&#8220;We have a great relationship. We talk,&#8221; he said.<\/p>\n<p class=\"uiTextSmall f aic jcc\">Article continues below this ad<\/p>\n","protected":false},"excerpt":{"rendered":"Construction progress\u2019 on the new Terminal C at the San Antonio International Airport. The new $1.7 billion terminal&hellip;\n","protected":false},"author":2,"featured_media":434378,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[82,84,83],"class_list":["post-434377","post","type-post","status-publish","format-standard","has-post-thumbnail","category-san-antonio","tag-san-antonio","tag-san-antonio-headlines","tag-san-antonio-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/434377","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=434377"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/434377\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/434378"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=434377"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=434377"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=434377"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}