{"id":436043,"date":"2026-09-14T23:28:23","date_gmt":"2026-09-14T23:28:23","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/436043\/"},"modified":"2026-09-14T23:28:23","modified_gmt":"2026-09-14T23:28:23","slug":"where-some-of-east-austins-transportation-projects-stand-this-september-east-austin","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/436043\/","title":{"rendered":"Where some of East Austin&#8217;s transportation projects stand this September | East Austin"},"content":{"rendered":"<p>From a newly reopened highway bridge to a trail&#8217;s final piece still under construction, Austin&#8217;s mobility bond and Texas Department of Transportation-funded projects are moving at different speeds across the city.\u00a0<\/p>\n<p>Here&#8217;s a look at what&#8217;s finished, what&#8217;s underway and what&#8217;s still ahead.<\/p>\n<p>Completed projects<\/p>\n<p>I-35 Capital Express Central: MLK Jr. Boulevard Bridge Segment<br \/>Project: Reconstruction and widening of the MLK Jr. Boulevard bridge over I-35, adding sidewalks, shade structures, a safety barrier, and rebuilt I-35 entrance and exit ramps in both directions.<br \/>Update: The bridge is now fully operational, as two lanes reopened in each direction in early August. Crews are finishing shared-use paths and wider sidewalks this month.<\/p>\n<p>Timeline: October 2024\u2013August 2026<\/p>\n<p>Cost: $34.4 million (part of the $4.5 billion I-35 CapEx Central budget)<\/p>\n<p>Funding source: TxDOT and Capital Area Metropolitan Planning Organization<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/09\/1789428496_920_.jpeg\"  \/>Traffic crosses the rebuilt MLK Jr. Boulevard bridge as crews complete the shared-use path and widened sidewalks this month. (Jessica McLaren\/Community Impact)<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/09\/1789428497_87_.jpeg\"  \/>Heavy equipment is still on site as crews wrap up finishing work on the MLK Jr. Boulevard bridge over I-35. (Jessica McLaren\/Community Impact)<\/p>\n<p>Ongoing projects<\/p>\n<p>I-35 Capital Express Central: Lady Bird Lake Segment<br \/>Project: From Holly Street to Hwy. 79 and Ben White Boulevard, the project adds two HOV lanes in each direction, and rebuilds the Lady Bird Lake bridge, a Riverside Drive interchange, and a pedestrian-only bridge at Woodland Avenue.<br \/>Update: TxDOT revised the schematics Sept. 9. Woodland Avenue under I-35 and northbound frontage road access north of Riverside Drive are closed. Waterway passage under the bridge remains narrowed to 75 feet.\u00a0<\/p>\n<p>Timeline: expected completion in 2033<\/p>\n<p>Cost: part of the $4.5 billion I-35 CapEx Central budget<\/p>\n<p>Funding source: TxDOT and CAMPO<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/09\/1789428497_423_.jpeg\"  \/>A detour sign directs northbound I-35 traffic amid a road closure tied to construction at the Riverside Drive interchange. (Jessica McLaren\/Community Impact)<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/09\/1789428498_869_.jpeg\"  \/>Fencing and signage restrict public access near the Lady Bird Lake boardwalk as TxDOT&#8217;s I-35 Capital Express Central project continues. (Jessica McLaren\/Community Impact)<\/p>\n<p>Airport Boulevard Corridor Mobility Program<br \/>Project: This includes safety, mobility and connectivity upgrades along Airport Boulevard from North Lamar Boulevard to US 183.<br \/>Update: Signal work is active at 51st Street and at Springdale Road as of late summer.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/09\/1789428499_304_.jpeg\"  \/>Crews in 2025 work near the railroad tracks to build a shared-use path connecting Bruning Avenue to Airport Boulevard in North Austin. (Courtesy Capital Delivery Services)<\/p>\n<p>MoKan Trail: Boggy Creek Bridge Segment<br \/>Project: A 1.5-mile trail connecting the Pedernales Street bike path to the Southern Walnut Creek Trail.<br \/>Update: Phase 5, the bridge over Boggy Creek, is the trail&#8217;s final piece and is expected to be complete by late 2026.<\/p>\n<p>Timeline: expected completion in late 2026<\/p>\n<p>Cost: about $5.3 million\u20135.8 million<\/p>\n<p>Funding source: 2020 mobility bond, Community Project Funding<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/09\/1789428500_202_.jpeg\"  \/>Construction equipment and signage at the MoKan Trail&#8217;s Boggy Creek Bridge segment, the trail&#8217;s final piece, is expected to finish by late 2026. (Jessica McLaren\/Community Impact)<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/09\/1789428501_940_.jpeg\"  \/>The steel truss bridge structure is taking shape over the Boggy Creek channel as work continues on the MoKan Trail connection. (Jessica McLaren\/Community Impact)<\/p>\n<p>Upcoming projects:<\/p>\n<p>Cesar Chavez Street and Red Bluff Road safety improvements<br \/>Project: The project will include new turn lanes, protected bike lanes, and improved bus stops and crossings between Pleasant Valley Road and Shady Lane, plus a dual-path urban trail extension.<br \/>Update: A community feedback survey closed May 11. Detailed design is pending review of that feedback.<\/p>\n<p>Timeline: expected completion in 2028-29<\/p>\n<p>Cost: $6.2 million<\/p>\n<p>Funding source: federal grants, 2018 and 2020 mobility bonds<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/09\/1789428502_720_.jpeg\"  \/>The intersection of Cesar Chavez Street and Shady Lane, future site of planned safety improvements including turn lanes and protected bike lanes. (Jessica McLaren\/Community Impact)<\/p>\n<p>E. 51st Street Mobility Project<br \/>Project: Reconstruction from I-35 to Berkman Drive will include protected bike lanes, new crossings, parking, landscaping and public art.<br \/>Update: The design reached 90% completion, according to a June 13 public open house. Construction is expected to begin next summer, nearly 15 years after voters approved the project.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/09\/1789428503_232_.jpeg\"  \/>The planned streetscape for East 51st Street between Cameron Road and Berkman Drive includes landscaped medians, protected bike lanes and wide sidewalks connecting Windsor Park and Mueller.<br \/>\n (Courtesy City of Austin)<\/p>\n","protected":false},"excerpt":{"rendered":"From a newly reopened highway bridge to a trail&#8217;s final piece still under construction, Austin&#8217;s mobility bond and&hellip;\n","protected":false},"author":2,"featured_media":436044,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[93774,132,134,23195,133,44179,140249,151132,120570,25749,3742,151131,141118],"class_list":["post-436043","post","type-post","status-publish","format-standard","has-post-thumbnail","category-austin","tag-airport-boulevard","tag-austin","tag-austin-headlines","tag-austin-mobility-bonds","tag-austin-news","tag-austin-transportation-projects","tag-boggy-creek-bridge","tag-cesar-chavez-safety-improvements","tag-east-51st-street","tag-i-35-capital-express-central","tag-lady-bird-lake","tag-mlk-jr-blvd-bridge","tag-mokan-trail"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/436043","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=436043"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/436043\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/436044"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=436043"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=436043"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=436043"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}