{"id":437263,"date":"2026-09-16T02:30:11","date_gmt":"2026-09-16T02:30:11","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/437263\/"},"modified":"2026-09-16T02:30:11","modified_gmt":"2026-09-16T02:30:11","slug":"seeing-construction-around-corpus-christi-neighborhoods-and-parks-heres-whats-behind-it","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/437263\/","title":{"rendered":"Seeing construction around Corpus Christi neighborhoods and parks? Here\u2019s what\u2019s behind it"},"content":{"rendered":"<p class=\"mb-4 text-lg md:leading-8 break-words\">Construction is underway on a 10-mile reclaimed water pipeline that will run through several Corpus Christi neighborhoods, prompting questions from residents as crews use several city parks to stage equipment.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The project is designed to provide treated, non-potable water for industrial use and reduce the amount of water industrial customers take from the city&#8217;s drinking water supply.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Residents have noticed heavy equipment, fenced-off areas and orange markings near their neighborhoods as construction gets underway.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">&#8220;There are some indications around the blocks here nearby that there&#8217;s going to be some more construction going on the road, unknown to me what it&#8217;s all about,&#8221; Corpus Christi resident Robert Sanchez said.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Sanchez lives near one of the construction sites and said he came out to see what was happening when he heard some noise.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">&#8220;I&#8217;m going to come out and still view what&#8217;s happening in my neighborhood with equipment, the people, see how it&#8217;s being taken care of, and there&#8217;s no excessive waste being left around,&#8221; Sanchez said.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The new pipeline will transport treated wastewater from the Oso Water Reclamation Plant to the Greenwood Wastewater Treatment Plant. The water will be treated for industrial use rather than drinking.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The pipeline will stretch for about 10 miles through the city.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">&#8220;We&#8217;ve got to go through the heart of the city,&#8221; Jeff Edmonds, Corpus Christi director of engineering, said. &#8220;Try and minimize the disruption. The intent was to expedite construction to the extent possible.&#8221;<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">To help speed up construction, the city is allowing contractors to use existing city property to stage equipment.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">That includes six local parks and city properties: Park View, Lexington, St. Andrews, Wooldridge, Holly, Schanen and the city&#8217;s annex.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">&#8220;The intent was to expedite construction to the extent possible,&#8221; Edmonds said. &#8220;So, in order to do that, we had to utilize existing city property for contractor staging.&#8221;<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">City officials said the use of the parks is temporary and will not prevent visitors from using park amenities.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">In a statement to 3NEWS, the city said, &#8220;This temporary use will not disrupt park visitors&#8217; enjoyment of amenities, and the parkland will be restored to its original condition where equipment was staged.&#8221;<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The project is also receiving private investment.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Corpus Christi City Councilman Roland Barrera said Valero is investing millions of dollars in the pipeline project in exchange for access to the reclaimed water.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">&#8220;Valero is investing $110 million to be able to complete the pipeline, so that way they could utilize this water,&#8221; Barrera said.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Barrera said the project is expected to provide about 11 million gallons of reclaimed water per day that would otherwise come from the city&#8217;s drinking water supply.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Sanchez said the temporary disruption is worthwhile if the project helps conserve the city&#8217;s water supply.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">&#8220;Being able to use water for industrial purposes where we don&#8217;t have to be maybe using city water for the residents would be a very, very good thing for the city of Corpus Christi and the surrounding area,&#8221; Sanchez said.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The reclaimed water pipeline is expected to be completed around July 2027.<\/p>\n","protected":false},"excerpt":{"rendered":"Construction is underway on a 10-mile reclaimed water pipeline that will run through several Corpus Christi neighborhoods, prompting&hellip;\n","protected":false},"author":2,"featured_media":437264,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[56881,151525,1494,155,157,156,100412,151524,101072,151523],"class_list":["post-437263","post","type-post","status-publish","format-standard","has-post-thumbnail","category-corpus-christi","tag-city-parks","tag-city-property","tag-construction","tag-corpus-christi","tag-corpus-christi-headlines","tag-corpus-christi-news","tag-drinking-water-supply","tag-jeff-edmonds","tag-reclaimed-water","tag-robert-sanchez"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/437263","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=437263"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/437263\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/437264"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=437263"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=437263"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=437263"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}