{"id":448601,"date":"2026-09-26T16:24:08","date_gmt":"2026-09-26T16:24:08","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/448601\/"},"modified":"2026-09-26T16:24:08","modified_gmt":"2026-09-26T16:24:08","slug":"tiny-texas-boomtowns-23m-road-overhaul-moves-into-next-phase","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/448601\/","title":{"rendered":"Tiny Texas boomtown&#8217;s $23M road overhaul moves into next phase"},"content":{"rendered":"<p><a href=\"https:\/\/www.mysanantonio.com\/business\/article\/seguin-exchange-development-target-22432701.php\" data-link=\"native\" rel=\"noopener nofollow\" target=\"_blank\" class=\"\">Seguin<\/a> is moving ahead with the next phase of its <a href=\"https:\/\/www.guadalupetx.gov\/upload\/page\/0289\/2025\/Rudeloff_Rd.pdf\" data-link=\"native\" rel=\"noopener nofollow\" target=\"_blank\" class=\"\">Rudeloff Road project<\/a>, setting the stage for a nearly $23 million extension toward State Highway 123.<\/p>\n<p>The second phase will extend Rudeloff Road east from Huber Road toward SH 123, eventually creating a continuous corridor between State Highways 46 and 123. City officials say the project will add transportation capacity, improve mobility and help ease congestion in one of Seguin\u2019s fastest-growing areas.<\/p>\n<p>The project also will include drainage improvements and 10-foot-wide shared-use paths for pedestrians and cyclists, according to the city.<\/p>\n<p>TDLR records show the project is scheduled to begin January 5, 2027, and be completed May 1, 2028. However, all TDLR filings\u00a0are subject to change without notice. The records describe the work as new construction involving about 1.615 miles of four-lane roadway with a center median and bicycle and pedestrian facilities.<\/p>\n<p>The project also includes approximately 170,000 square feet of shared-use path, according to TDLR.<\/p>\n<p>City officials said the project is intended to improve mobility and help address congestion along several high-growth corridors.<\/p>\n<p>The roadway project is being advanced with support from the Alamo Area Metropolitan Planning Organization and the Texas Department of Transportation, the city told MySA via email.<\/p>\n<p>The second phase builds on the first portion of the Rudeloff Road project, which extends from SH 46 to Huber Road.<\/p>\n<p>Phase one included widening the roughly 1.5-mile stretch of Rudeloff Road and adding 10-foot-wide multi-use paths. The project had been in the works for years before construction began, according to the <a href=\"https:\/\/seguingazette.com\/news\/seguin-gets-moving-on-rudeloff-road-construction-project\/article_3eb1ef1c-0be9-11ef-8447-0bd229d8beb5.html\" data-link=\"native\" rel=\"noopener nofollow\" target=\"_blank\" class=\"\">Seguin Gazette<\/a>. The first phase was backed by $15.4 million in funding.<\/p>\n<p>&#8220;The project represents a significant investment in the city&#8217;s transportation infrastructure and will support continued residential and commercial development in the area,&#8221; Assistant City Manager and City Engineer Melissa Reynolds told MySA via email.<\/p>\n<p>For drivers traveling through the growing Seguin area, the eventual Rudeloff corridor will offer another connection between major highways as development continues east of San Antonio.<\/p>\n","protected":false},"excerpt":{"rendered":"Seguin is moving ahead with the next phase of its Rudeloff Road project, setting the stage for a&hellip;\n","protected":false},"author":2,"featured_media":448602,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[820,59494,82,84,83],"class_list":["post-448601","post","type-post","status-publish","format-standard","has-post-thumbnail","category-san-antonio","tag-mysastaff","tag-mysatranspo","tag-san-antonio","tag-san-antonio-headlines","tag-san-antonio-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/448601","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=448601"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/448601\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/448602"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=448601"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=448601"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=448601"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}