{"id":463005,"date":"2026-10-11T14:00:16","date_gmt":"2026-10-11T14:00:16","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/463005\/"},"modified":"2026-10-11T14:00:16","modified_gmt":"2026-10-11T14:00:16","slug":"a-first-look-at-the-new-san-antonio-airport-terminal","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/463005\/","title":{"rendered":"A first look at the new San Antonio airport terminal"},"content":{"rendered":"<p class=\"wp-block-paragraph\">A 300-pound steel beam destined for the top of the new airport terminal now under construction was rolled on a trailer into downtown San Antonio on Thursday afternoon.<\/p>\n<p class=\"wp-block-paragraph\">In keeping with construction tradition, local leaders signed their names on the 12-foot I-beam that, when installed, will mark the halfway point of a long-anticipated project that doubles the size of the <a href=\"https:\/\/flysanantonio.com\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">San Antonio International Airport<\/a> (SAT).<\/p>\n<p class=\"wp-block-paragraph\">\u201cThe first one went up in January,\u201d following a <a href=\"https:\/\/sanantonioreport.org\/its-happening-sat-makes-real-a-new-much-bigger-airport-terminal\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">groundbreaking in December 2024<\/a>, said Accenture\u2019s David Brandenburg, executive program manager for the terminal development program.<\/p>\n<p class=\"wp-block-paragraph\">By this December, crews will have the facility closed up and the utilities turned on so they can begin the interior work on the $1.7 billion Terminal C scheduled to open in 2028.<\/p>\n<p><img loading=\"lazy\" data-recalc-dims=\"1\" decoding=\"async\" width=\"1000\" height=\"667\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/10\/SanAntonioInternationalAirport_SATExpansion_TerminalC_ConstructionBuilding_InfrastructureMaterials40.jpeg\" alt=\"\" class=\"wp-image-5455782\"  \/>A majority of the large timber ceilings have already been installed for the new Terminal C at the San Antonio International Airport on Oct. 6, 2026. Credit: Amber Esparza \/ San Antonio Report<\/p>\n<p class=\"wp-block-paragraph\">That should not be taken for granted, said the city\u2019s Director of Aviation Jesus Saenz.\u00a0<\/p>\n<p class=\"wp-block-paragraph\">\u201cWe\u2019re in a really, really good spot as we talk about the scope of the overall program, the schedule of the program, and the overall financing of the program. We couldn\u2019t be in a better position,\u201d he said.<\/p>\n<p class=\"wp-block-paragraph\">Driving into the airport in the departures and arrivals lanes, motorists can now see the angled rooflines of the new terminal emerging from construction fencing \u2014 aluminum curtain walls that frame the structure and laminated timber lining the underside of the ceilings.\u00a0<\/p>\n<p class=\"wp-block-paragraph\">Four tower cranes hover overhead, soon to be reduced down to three as work progresses.<\/p>\n<p><img loading=\"lazy\" data-recalc-dims=\"1\" decoding=\"async\" width=\"1000\" height=\"667\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/10\/SanAntonioInternationalAirport_SATExpansion_TerminalC_ConstructionBuilding_InfrastructureMaterials05.jpeg\" alt=\"\" class=\"wp-image-5455746\"  \/>Jesus Saenz, director of airports for the City of San Antonio, speaks about the current state of construction at SAT\u2019s Terminal C project on Oct. 6, 2026. Credit: Amber Esparza \/ San Antonio Report<\/p>\n<p class=\"wp-block-paragraph\">At least 40 contractors and about 700 construction workers are on the site six days a week, including several local contractors, Brandenburg said, and another 100 workers will be there by December. Hensel Phelps is the general contractor, and <a href=\"https:\/\/sanantonioreport.org\/meet-the-architects-behind-san-antonios-newest-airport-terminal-set-to-open-in-2028\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Dallas-based Corgan<\/a> and San Antonio-based Lake Flato are the architects on the project.<\/p>\n<p class=\"wp-block-paragraph\">The project is spending $2 million a day, he added.\u00a0<\/p>\n<p>Terminal C takes shape<\/p>\n<p class=\"wp-block-paragraph\">The terminal cost is supported by funding from FAA grants, the bipartisan federal infrastructure bill, airport revenue and fees and airport bonds.<\/p>\n<p class=\"wp-block-paragraph\">With framing nearly complete, stairwells installed and some glass in place, the halfway-completed structure is starting to feel like an actual terminal with ticket areas, 18 gates, retail kiosks and wide concourses.<\/p>\n<p class=\"wp-block-paragraph\">Ceiling heights rise to 30 feet throughout the concourse and a massive space for the security checkpoint has been designated in the eastern part of the terminal. Saenz said the project has earmarked millions of dollars for high-tech security checkpoint systems.<\/p>\n<p class=\"wp-block-paragraph\">An outdoor patio overlooking the runway has been built and spaces for planters and art installations have been outlined in the spacious concourse. One such work of art will be a massive pi\u00f1ata suspended from the ceiling.\u00a0<\/p>\n<p><img loading=\"lazy\" data-recalc-dims=\"1\" decoding=\"async\" width=\"1000\" height=\"667\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/10\/SanAntonioInternationalAirport_SATExpansion_TerminalC_ConstructionBuilding_InfrastructureMaterials22.jpeg\" alt=\"\" class=\"wp-image-5455764\"  \/>Development and construction is seen underway for the new Terminal C at the San Antonio International Airport on Oct. 6, 2026. Credit: Amber Esparza \/ San Antonio Report<\/p>\n<p class=\"wp-block-paragraph\">Two 10,000-square-foot airline club lounges are also taking shape, one near the gates for Delta and another on the mezzanine for American Airlines. A 44,000-square-foot food court is being built under the mezzanine level.<\/p>\n<p class=\"wp-block-paragraph\">Escalators that ferry passengers from international flights at the arrival gates to the federal inspection services processing on a sub-level have been installed. Also on that level will be baggage handling.<\/p>\n<p class=\"wp-block-paragraph\">Adjacent to the site, to the west, land has been cleared for construction of a $132 million parking garage that will open in late 2027, just ahead of the new terminal. The garage will provide 10,000 more vehicle spaces at the airport. Parking is one of the airport system\u2019s largest non-airline revenue sources.\u00a0<\/p>\n<p><img loading=\"lazy\" data-recalc-dims=\"1\" decoding=\"async\" width=\"1000\" height=\"667\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/10\/SanAntonioInternationalAirport_SATExpansion_TerminalC_ConstructionBuilding_InfrastructureMaterials34.jpeg\" alt=\"\" class=\"wp-image-5455776\"  \/>Construction of the new Terminal C continues at the San Antonio International Airport on Oct. 6, 2026. Credit: Amber Esparza \/ San Antonio Report<\/p>\n<p class=\"wp-block-paragraph\">On the east side of the terminal is a connection to Terminal B, which will undergo renovations \u2014 and get a larger United Airlines lounge \u2014\u00a0as soon as the new terminal is completed. Terminal A is also slated for a major overhaul at the same time.<\/p>\n<p class=\"wp-block-paragraph\">Terminal C is planned as an 850,000-square-feet facility, larger than the other two terminals combined, with gates designated for American, Delta, Alaska Airlines, Southwest, and international carriers.\u00a0<\/p>\n<p>A long-awaited upgrade<\/p>\n<p class=\"wp-block-paragraph\">The new terminal is being built on the site of the airport\u2019s original WWII-era terminal, a one-level passenger facility that was later expanded for the world\u2019s fair, HemisFair \u201868.<\/p>\n<p class=\"wp-block-paragraph\">In the works since <a href=\"https:\/\/sanantonioreport.org\/city-council-approves-2040-airport-strategic-plan\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">San Antonio City Council approved<\/a> the airport\u2019s wide-ranging $2.5 billion strategic development plan in 2021, Terminal C is coming along at a time when air travel and the economy have struggled to rebound since the initial post-COVID wave.<\/p>\n<p class=\"wp-block-paragraph\">Passenger numbers have dipped this year as air travel costs increased, Spirit Airlines has departed SAT for good, and the city has grappled with a budget crisis and <a href=\"https:\/\/sanantonioreport.org\/city-scraps-parking-garage-project-marvel-improvements-2027-bond\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">major financial commitments<\/a> in an uncertain economic environment.\u00a0<\/p>\n<p class=\"wp-block-paragraph\">The city\u2019s <a href=\"https:\/\/sanantonioreport.org\/12-takeaways-san-antonio-and-bexar-county-budget-season\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">newly adopted $4.4 billion budget<\/a> for fiscal year 2027 came in 8.6% larger than the previous year\u2019s budget, with airport construction accounting for 6.3% of this year\u2019s budget growth.<\/p>\n<p class=\"wp-block-paragraph\">Still, Saenz said the timing is right. \u201cWe have a solid airline use and lease agreement with our carriers, and that entire terminal is spoken for \u2014\u00a0no one is saying I don\u2019t need those gates,\u201d he said.\u00a0<\/p>\n<p><img loading=\"lazy\" data-recalc-dims=\"1\" decoding=\"async\" width=\"1000\" height=\"667\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2026\/10\/SanAntonioInternationalAirport_SATExpansion_TerminalC_ConstructionBuilding_InfrastructureMaterials33.jpeg\" alt=\"\" class=\"wp-image-5455775\"  \/>Construction of the new Terminal C continues at the San Antonio International Airport on Oct. 6, 2026. Credit: Amber Esparza \/ San Antonio Report<\/p>\n<p class=\"wp-block-paragraph\">The aviation team is moving ahead with plans for the existing terminals and the \u201cpolitical support\u201d behind the program is strong unlike some cities where he\u2019s worked, said Brandenburg, who\u2019s overseen five other terminal expansions during his career.<\/p>\n<p class=\"wp-block-paragraph\">\u201cEverybody was aligned,\u201d he said. \u201cBecause they made great decisions, we are where we are \u2014\u00a0scope, schedule, budgets, all in great shape.\u201d<\/p>\n<p class=\"wp-block-paragraph\">Now those milestones will be celebrated at the construction site next week with a topping-off ceremony when the signed beam is placed.<\/p>\n<p class=\"wp-block-paragraph\">The city manager\u2019s office provided a statement on the achievement.<\/p>\n<p class=\"wp-block-paragraph\">\u201cThe new terminal will position San Antonio to accommodate continued growth, attract new opportunities and better connect our community globally,\u201d City Manager Erik Walsh stated. \u201cJust as importantly, we\u2019re seeing San Antonio businesses and workers play a direct role in building this future, making this a project that truly belongs to our community.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"A 300-pound steel beam destined for the top of the new airport terminal now under construction was rolled&hellip;\n","protected":false},"author":2,"featured_media":463006,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[14613,61226,82,84,4022,83,24040,61234,92,3028,3440],"class_list":["post-463005","post","type-post","status-publish","format-standard","has-post-thumbnail","category-san-antonio","tag-erik-walsh","tag-jesus-saenz","tag-san-antonio","tag-san-antonio-headlines","tag-san-antonio-international-airport","tag-san-antonio-news","tag-sat","tag-terminal-c","tag-top-story","tag-typedaily","tag-wc-1000-1500"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/463005","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=463005"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/463005\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/463006"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=463005"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=463005"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=463005"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}