{"id":93554,"date":"2025-12-19T00:47:16","date_gmt":"2025-12-19T00:47:16","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/93554\/"},"modified":"2025-12-19T00:47:16","modified_gmt":"2025-12-19T00:47:16","slug":"texas-awards-25m-to-cotton-belt-trail-nearly-30m-to-other-dfw-bike-pedestrian-projects-dallas-innovates","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/93554\/","title":{"rendered":"Texas Awards $25M to Cotton Belt Trail, Nearly $30M to Other DFW Bike-Pedestrian Projects \u00bb Dallas Innovates"},"content":{"rendered":"<p>                            <img width=\"970\" height=\"498\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2025\/12\/Part-of-the-existing-Cotton-Belt-Trail-Photo-NCTCOG.png\" class=\"img-responsive wp-post-image\" alt=\"\" decoding=\"async\" fetchpriority=\"high\"  \/><\/p>\n<p class=\"featured-caption\">Part of the existing Cotton Belt Trail [Photo: NCTCOG]<\/p>\n<p>A bicycle-pedestrian trail being built alongside DART\u2019s recently opened Silver Line is moving closer to completion after the project received a financial boost from the state. The Texas Transportation Commission recently awarded Dallas Area Rapid Transit $25 million for construction of Phase 3A of the Cotton Belt Trail as part of a statewide effort to improve active transportation infrastructure through the Transportation Alternatives Set-Aside Program.<\/p>\n<p>\u201cWe\u2019re deeply appreciative to the Texas Department of Transportation and the Texas Transportation Commission for supporting the Cotton Belt Trail and other initiatives that help expand multimodal travel in our region,\u201d Kevin Kokes, a program manager for the North Central Texas Council of Governments\u2019 Land Use and Mobility Options team, said in a statement. \u201cBy improving connections to employment, housing, education facilities, and recreational opportunities, these projects help build a stronger, more accessible future for everyone.\u201d<\/p>\n<p>A key east-to-west trail connector<\/p>\n<p>The Cotton Belt Trail has long been envisioned as a key east-to-west connector in North Texas\u2019 expanding regional trail network. The eastern portion spans 26 miles from Plano to Dallas Fort Worth International Airport. The trail will follow DART\u2019s new Silver Line commuter rail and is designed to give users a continuous, safe option for walking and biking across multiple cities. Another section of the existing Cotton Belt Trail runs along TEXRail in Tarrant County from Grapevine to Watauga, with future plans to extend it to Fort Worth.\u00a0<\/p>\n<p>DART is overseeing the new trail construction, including 11 miles in Phase 2 currently under construction from western Addison to the Shiloh Road Station in Plano. The $25 million awarded to construct Phase 3A of the Cotton Belt Trail will help provide walking and bicycling access directly to the Cypress Waters (Dallas), Addison, and Downtown Carrollton stations, three of the 10 stops along the DART Silver Line, which began serving passengers in October. \u00a0<\/p>\n<p>Phase 3A trail construction is slated to begin by mid-2027.<\/p>\n<p>Bigger trail picture and new regional funding<\/p>\n<p>Running along the former St. Louis Southwestern Railway corridor, known by its nickname of \u201cThe Cotton Belt Route,\u201d the trail preserves the legacy of the Cotton Belt Line, a route that operated for decades from Texas to St. Louis, Missouri.<\/p>\n<p>The trail represents part of a long-term transportation vision led by NCTCOG to connect cities in the Dallas-Fort Worth region through an integrated network of shared-use paths, the organization said. Other major efforts include the DFW Discovery Trail, a developing 60-mile corridor linking Fort Worth, Arlington, Grand Prairie, Irving, and Dallas. These ongoing projects reflect a coordinated strategy to provide North Texas residents and visitors with more options to travel safely by foot or bike, while also improving regional mobility and quality of life, NCTCOG said.<\/p>\n<p>In addition to the Cotton Belt Trail Phase 3A, the Commission awarded almost $30 million to six other projects across the Dallas-Fort Worth metropolitan area as part of a $285 million infusion for bicycle and pedestrian transportation projects across Texas. Those projects include:<\/p>\n<p>Trinity Forest Spine Trail \u2013 Bike\/Pedestrian Bridge in Dallas received $10.9 million<br \/>\nMidtown Dallas shared use trail received $10.5 million<br \/>\nSoutheast Trail (Phase 1A) in Balch Springs received $6.4 million<br \/>\nPark Row Drive pedestrian improvements in Pantego received $791,200<br \/>\nKing\u2019s Gate and Meadow Place bike lanes in Willow Park received $552,800<br \/>\nCity of Azle Active Transportation Plan received $440,000<\/p>\n<p>\u00a0<\/p>\n<p>Don\u2019t miss what\u2019s next. Subscribe\u00a0to\u00a0Dallas\u00a0Innovates.<\/p>\n<p style=\"font-size: 1rem; line-height: 1.5; margin: 0 0 10px 0;\">Track Dallas-Fort Worth\u2019s business and innovation landscape with our curated news in your inbox Tuesday-Thursday.<\/p>\n<p>\u00a0<\/p>\n<p>\tR E A D\u00a0\u00a0 N E X T\t<\/p>\n<p>\t<a href=\"https:\/\/dallasinnovates.com\/calendar\/\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"970\" height=\"464\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2025\/10\/calendar-lukpedclub_istockphoto_weekly-calendar-811171674_1027x1027.jpg\" class=\"attachment-rp4wp-thumbnail-post size-rp4wp-thumbnail-post wp-post-image\" alt=\"\"  \/><\/a><\/p>\n<p>North Texas has plenty to see, hear, and watch.\u00a0Here are our editors&#8217; picks. Plus, you&#8217;ll find more selections to &#8220;save the date.&#8221;<\/p>\n<p>\t<a href=\"https:\/\/dallasinnovates.com\/the-last-word-masschallenge-ceo-on-innovate-25-and-looking-ahead-at-forces-shaping-economies\/\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"969\" height=\"464\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2025\/11\/Cait-Brumme-CEO-of-MassChallenge-970xslightly-deep-969x464.jpg\" class=\"attachment-rp4wp-thumbnail-post size-rp4wp-thumbnail-post wp-post-image\" alt=\"\"  \/><\/a><\/p>\n<p>Cait Brumme says the event at Dallas&#8217; Pegasus Park on Nov. 6 will explore the technologies and economic forces defining the future for entrepreneurs and innovators.<\/p>\n<p>\t<a href=\"https:\/\/dallasinnovates.com\/dallas-regional-chamber-offering-human-help-to-talk-to-machines\/\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"970\" height=\"464\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2025\/10\/DRC-TalkToMachines-adobe1-970.jpg\" class=\"attachment-rp4wp-thumbnail-post size-rp4wp-thumbnail-post wp-post-image\" alt=\"\"  \/><\/a><\/p>\n<p>AI seem overwhelming? Just go to office hours.\u00a0<\/p>\n<p>\t<a href=\"https:\/\/dallasinnovates.com\/venture-dallas-host-startup-of-the-year-semi-finalists-at-petroleum-club-4242\/\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"970\" height=\"464\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2025\/10\/VentureDallas_SOTYPhoto1-970.jpg\" class=\"attachment-rp4wp-thumbnail-post size-rp4wp-thumbnail-post wp-post-image\" alt=\"\"  \/><\/a><\/p>\n<p>Top executives at Nasdaq and Susser Bank celebrated high-growth potential companies contributing to region\u2019s rise in entrepreneurship and innovation<\/p>\n<p>\t<a href=\"https:\/\/dallasinnovates.com\/innovaters-alert-apply-now\/\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"970\" height=\"464\" src=\"https:\/\/www.newsbeep.com\/us-tx\/wp-content\/uploads\/2025\/10\/apply-business-concept-of-searching-for-decisions-new-ideas-and-opportunities-surfing-internet.jpg_s.jpeg\" class=\"attachment-rp4wp-thumbnail-post size-rp4wp-thumbnail-post wp-post-image\" alt=\"\"  \/><\/a><\/p>\n<p>You&#8217;ll find deadlines coming up for a new accelerator program; and many more opportunities.<\/p>\n","protected":false},"excerpt":{"rendered":"Part of the existing Cotton Belt Trail [Photo: NCTCOG] A bicycle-pedestrian trail being built alongside DART\u2019s recently opened&hellip;\n","protected":false},"author":2,"featured_media":93555,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[150,152,151,43772,43773,43774,43775,2261,43776,43777,18763,12017,43778,20644],"class_list":["post-93554","post","type-post","status-publish","format-standard","has-post-thumbnail","category-arlington","tag-arlington","tag-arlington-headlines","tag-arlington-news","tag-bicycle-infrastructure","tag-cottonbelt-trail","tag-dallas-area-rapid-transit-dart-silver-line","tag-dallas-fort-worth-hike-and-bike-trails","tag-dart","tag-dfw-discovery-trail","tag-kevin-kokes","tag-nctcog","tag-north-central-texas-council-of-governments","tag-texas-transportation-commission","tag-texrail"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/93554","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=93554"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/93554\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/93555"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=93554"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=93554"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=93554"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}