{"id":9747,"date":"2025-10-18T11:11:21","date_gmt":"2025-10-18T11:11:21","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/9747\/"},"modified":"2025-10-18T11:11:21","modified_gmt":"2025-10-18T11:11:21","slug":"check-out-6-hays-county-transportation-updates","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/9747\/","title":{"rendered":"Check out 6 Hays County transportation updates"},"content":{"rendered":"<p>\t\t\t\tThis list is not comprehensive. Have a tip? Send an email to <a href=\"https:\/\/communityimpact.com\/cdn-cgi\/l\/email-protection\" class=\"__cf_email__\" data-cfemail=\"e695848d88839195a685898b8b93888f929f8f8b96878592c885898b\" rel=\"nofollow noopener\" target=\"_blank\">[email\u00a0protected]<\/a>.<\/p>\n<p>Learn about the latest updates on six <a href=\"https:\/\/communityimpact.com\/transportation\/austin\/san-marcos-buda-kyle\/\" rel=\"nofollow noopener\" target=\"_blank\">transportation projects throughout Hays County<\/a>.<\/p>\n<p>Upcoming projects<\/p>\n<p>RM 967 deceleration lanes<\/p>\n<p>Project: The project will add deceleration lanes to <a href=\"https:\/\/communityimpact.com\/austin\/san-marcos-buda-kyle\/transportation\/2025\/08\/14\/buda-city-council-reviews-fm-1626rm-967-design-concepts\/\" rel=\"nofollow noopener\" target=\"_blank\">RM 967<\/a> in two locations: Garlic Creek Drive\/Remuda Trail and Garlic Creek Drive\/Grove Lane.<\/p>\n<p>Update: In final construction plans<\/p>\n<p>Timeline: 2021-TBDCost: $2.57 millionFunding source: 2021 Buda bondBishop &amp; Belvin Street improvements<\/p>\n<p>Project: The full-depth road reconstruction project will include drainage, water, wastewater, retaining walls and sidewalk improvements, according to the city of San Marcos Capital Improvement Project map.<\/p>\n<p>Update: At 60% design phase with acquisition process in the works<\/p>\n<p>Timeline: 2026-28Cost: $11.26 millionFunding sources: Capital Improvement Program; city water, wastewater, drainage, electric and general fundsAustin Street reconstruction<\/p>\n<p>Project: The reconstruction of Austin Street from FM 2770 to San Antonio Street will include on-street parking, sidewalks and stormwater management features.<\/p>\n<p>Update: At 30% design phase<\/p>\n<p>Timeline: 2021-TBDCost: $6.76 millionFunding source: 2021 Buda bondOngoing projects<\/p>\n<p>Old Bastrop Highway widening<\/p>\n<p>Project: The project will widen Old Bastrop Highway from Centerpoint Road to Rattler Road and add a 16-inch water main.<\/p>\n<p>Update: Water main installed in September, waterline crossing at Centerpoint Road underway<\/p>\n<p>Timeline: 2024-25Cost: TBDFunding source: 2025 road project certificates of obligationOld Stagecoach Road widening<\/p>\n<p>Project: The project will widen Old Stagecoach Road and Center Street into a continuous four-lane road from FM 2770 to FM 150. Work will be completed in three parts: the north portion of Old Stagecoach Road from FM 2770 to Six Creeks Boulevard, Old Stagecoach Road from Six Creeks Boulevard to Center Street and Center Street from Old Stagecoach Road to FM 150.<\/p>\n<p>Update: 70% complete, with ongoing work to expand it to four lanes and install roundabouts at Six Creeks and Center Street<\/p>\n<p>Timeline: 2023-27Cost: $41.2 millionFunding source: 2022 Kyle Road bondKyle Parkway-Lehman extension<\/p>\n<p>Project: The 1.3-mile project will connect Bunton Creek Road to Dacy Lane, utilizing four lanes with four roundabouts.<\/p>\n<p>Update: In final design phase<\/p>\n<p>Timeline: 2023-27Cost: $42.5 millionFunding source: 2022 Kyle Road bond<\/p>\n<p>&#8220;&gt;<\/p>\n","protected":false},"excerpt":{"rendered":"This list is not comprehensive. Have a tip? Send an email to [email\u00a0protected]. Learn about the latest updates&hellip;\n","protected":false},"author":2,"featured_media":9748,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[132,134,133,8966,8965,8964,8960,8971,8972,8970,8973,8959,8969,8962,8967,8968,8963,8961],"class_list":["post-9747","post","type-post","status-publish","format-standard","has-post-thumbnail","category-austin","tag-austin","tag-austin-headlines","tag-austin-news","tag-austin-street-buda","tag-belvin-street-reconstruction","tag-bishop-street-san-marcos","tag-buda-road-construction","tag-central-texas-transportation","tag-hays-county-infrastructure-funding","tag-hays-county-road-updates","tag-hays-county-traffic-improvements","tag-hays-county-transportation-projects","tag-kyle-parkway-lehman-extension","tag-kyle-road-bond-projects","tag-old-bastrop-highway-widening","tag-old-stagecoach-road-expansion","tag-rm-967-improvements","tag-san-marcos-infrastructure"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/9747","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=9747"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/9747\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/9748"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=9747"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=9747"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=9747"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}