ABC Water and Stormwater District Executive Director Jason Loree previously described the location as unique because a stream, Cranberry Run, was piped in underground with two 60-inch pipes. The project involved ‘daylighting’ the stream, or bringing it back to the surface, to allow for stormwater detention and to restore it to more natural conditions. This process, according to Loree, added significant capacity for water management and created a public asset.