{"id":895108,"date":"2026-10-26T10:00:44","date_gmt":"2026-10-26T10:00:44","guid":{"rendered":"https:\/\/www.newsbeep.com\/us\/895108\/"},"modified":"2026-10-26T10:00:44","modified_gmt":"2026-10-26T10:00:44","slug":"michigan-residents-fight-potential-6-4bn-datacenter-bill-that-is-insanity-michigan","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us\/895108\/","title":{"rendered":"Michigan residents fight potential $6.4bn datacenter bill: \u2018That is insanity\u2019 | Michigan"},"content":{"rendered":"<p class=\"dcr-1s160rg\">Michigan utility customers may pay $6.4bn for two new gas plants to meet datacenter demand, drawing outrage from residents.<\/p>\n<p class=\"dcr-1s160rg\">The potential burden on ratepayers, especially residential customers, is a microcosm of similar tensions nationwide, highlighting how the utility industry benefits from unchecked datacenter growth.<\/p>\n<p class=\"dcr-1s160rg\">The proliferation of energy-hungry datacenters in the state of Michigan is driving a DTE Energy proposal to double its electric grid capacity over the next 20 years. DTE is Michigan\u2019s largest energy provider, and among the nation\u2019s biggest utilities. It has asked regulators to approve a long-term energy delivery plan that includes developing a combined 2.1 gigawatts of gas plants in 2031 and 2032, in counties just outside metro Detroit.<\/p>\n<p class=\"dcr-1s160rg\">The company has already contracted with Google and Oracle to provide a combined 2.4 gigawatts of electricity to hyperscale datacenters \u2013 enough to power more than 1.8m homes. It is also <a href=\"https:\/\/www.detroitnews.com\/story\/business\/2026\/10\/07\/dte-plans-to-announce-new-data-center-agreements-by-years-end\/92023800007\/\" data-link-name=\"in body link\" rel=\"nofollow noopener\" target=\"_blank\">poised to announce<\/a> two more hyperscale contracts, and a potential total of roughly 6 gigawatts\u2019 worth of datacenters could be contracted by the year\u2019s end. If all came to fruition, DTE could need more than two gas plants.<\/p>\n<p>A DTE Energy power plant in Monroe, Michigan, on 30 June 2014. Photograph: Bloomberg\/Getty Images<\/p>\n<p class=\"dcr-1s160rg\">About 2.3 million electric customers in south-east Michigan could be affected. Any plan to saddle residential customers with datacenter costs was \u201cdeeply unjust\u201d, said Yousef Rabhi, a public power advocate and former state representative who in August won the Democratic nomination for mayor of Ann Arbor.<\/p>\n<p class=\"dcr-1s160rg\">\u201cPeople who are struggling to feed their kids, to put diapers on their babies, to keep the lights on \u2013 those people are going to be subsidizing the wealthiest people on the planet to help them make more money, and that is insanity,\u201d Rabhi continued.<\/p>\n<p class=\"dcr-1s160rg\">The Michigan Public Service Commission (MPSC), which regulates the state\u2019s private utilities, has <a href=\"https:\/\/www.detroitnews.com\/story\/business\/2026\/01\/09\/dte-energy-saline-township-oracle-openai-data-center-michigan-attorney-general-dana-nessel\/88099102007\/\" data-link-name=\"in body link\" rel=\"nofollow noopener\" target=\"_blank\">drawn fire<\/a> over its previous decisions about whether residential customers should effectively subsidize datacenters. The commission\u2019s leadership is filled with <a href=\"https:\/\/www.theguardian.com\/us-news\/2025\/aug\/03\/gretchen-whitmer-utilities-board-clean-energy\" data-link-name=\"in body link\" rel=\"nofollow noopener\" target=\"_blank\">appointees<\/a> of Michigan\u2019s governor, Gretchen Whitmer, a pro-business, big tech ally who has seen her popularity in the state <a href=\"https:\/\/x.com\/PollTracker2024\/status\/2082771959469711814\" data-link-name=\"in body link\" rel=\"nofollow\">fall<\/a> in part over her support for datacenters, which <a href=\"https:\/\/www.wlns.com\/news\/politics\/michigan-voters-oppose-data-centers\/\" data-link-name=\"in body link\" rel=\"nofollow noopener\" target=\"_blank\">are unpopular<\/a>.<\/p>\n<p class=\"dcr-1s160rg\">DTE Energy wrote in a <a href=\"https:\/\/www.dteenergy.com\/us\/en\/newsroom\/2026\/Powering-the-next-generation--DTE-lays-out-plan-to-deliver-a-cleaner,-reliable-energy-future-for-Michigan-customers.html\" data-link-name=\"in body link\" rel=\"nofollow noopener\" target=\"_blank\">press release<\/a> that \u201cthe plan reflects what [customers] told us matters most to them\u201d.<\/p>\n<p class=\"dcr-1s160rg\">\u201cWe designed this plan to be achievable and affordable \u2013 grounded in real analysis and feedback from customers and built to deliver cleaner energy while meeting Michigan\u2019s growing needs for the next 20 years and beyond,\u201d said DTE Electric\u2019s president, Matt Paul. The plan also calls for a significant increase in renewable energy and battery storage, which consumer advocates praised as a positive step.<\/p>\n<p class=\"dcr-1s160rg\">The MPSC will take input from industry and environmental groups and consumer advocates, among other interests, and issue a preliminary decision within 300 days.<\/p>\n<p class=\"dcr-1s160rg\">DTE has said the gas plants will replace a coal plant that is being retired, but the retirement agreement was developed in 2023. While DTE <a href=\"https:\/\/mi-psc.my.site.com\/sfc\/servlet.shepherd\/version\/download\/0688y000004qW9sAAE\" data-link-name=\"in body link\" rel=\"nofollow noopener\" target=\"_blank\">around that time said<\/a> it would need about 940 megawatts of gas in the long term, it now claims it needs about 2.3 times more gas generation than previously anticipated, raising questions about whether the coal plant closure is truly a driver of the gas expansion.<\/p>\n<p>Residents rally against the $7bn Stargate datacenter planned on farmland, in Saline, Michigan, on 1 December 2025. Photograph: Jim West\/UCG\/Universal Images Group\/Getty Images<\/p>\n<p class=\"dcr-1s160rg\">\u201cWe are very comfortable with saying that the amount they are currently requesting \u2013 the vast majority of that could be attributed to datacenters,\u201d said Helen Li, a senior attorney with Earthjustice, which is representing the Sierra Club in the regulatory case.<\/p>\n<p class=\"dcr-1s160rg\">The DTE plan includes some analysis of the effects on ratepayers, including residential, but protections will not be determined until later regulatory cases.<\/p>\n<p class=\"dcr-1s160rg\">\u201cDTE\u2019s approach to the question of \u2018who pays\u2019 is unclear, convoluted, and does not ensure that ordinary ratepayers won\u2019t foot the bill for these new, energy-hogging neighbors,\u201d Li said.<\/p>\n<p class=\"dcr-1s160rg\">The datacenters also may derail Michigan\u2019s nation-leading climate transition laws. Michigan, in late 2023, passed legislation requiring utilities to transition to renewable energy by 2040. But the law included an \u201coff-ramp\u201d that allows utilities to continue running or building fossil fuel plants if renewable sources cannot handle the energy grid\u2019s load.<\/p>\n<p class=\"dcr-1s160rg\">At its peak, DTE\u2019s grid already demands more than 9.5 gigawatts of power, while the grid\u2019s capacity is 11 gigawatts. DTE may already exceed that with the datacenters for which it has contracts, and it may soon announce several more. The company also develops gas infrastructure across the US, so its parent company benefits from datacenters and is incentivized to add more to the grid.<\/p>\n<p class=\"dcr-1s160rg\">The mix of energy generation DTE proposed appears to potentially get it close to meeting the climate law\u2019s requirements, but part of that relies on installing unproven carbon capture technology. Additionally, more gas plants could be built if more datacenter contracts are approved, which appears likely.<\/p>\n<p class=\"dcr-1s160rg\">\u201cThis blows a hole in the state\u2019s clean energy laws,\u201d Rabhi said. \u201cOf course they are going to build fossil fuel, and there is a massive environmental cost to this.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"Michigan utility customers may pay $6.4bn for two new gas plants to meet datacenter demand, drawing outrage from&hellip;\n","protected":false},"author":2,"featured_media":895109,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[59],"tags":[97,252,253],"class_list":["post-895108","post","type-post","status-publish","format-standard","has-post-thumbnail","category-health-care","tag-health","tag-health-care","tag-healthcare"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us\/wp-json\/wp\/v2\/posts\/895108","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us\/wp-json\/wp\/v2\/comments?post=895108"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us\/wp-json\/wp\/v2\/posts\/895108\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us\/wp-json\/wp\/v2\/media\/895109"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us\/wp-json\/wp\/v2\/media?parent=895108"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us\/wp-json\/wp\/v2\/categories?post=895108"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us\/wp-json\/wp\/v2\/tags?post=895108"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}